Loading...
HomeMy WebLinkAboutDDW-2024-012537Utah Department Of Environmental Quality Division Of Drinking Water Sanitary Survey Sanitary Survey General System Information Site Visit Date Surveyor Name 10/15/2024 Danielle Zebelean SORREL RIVER RANCH WATER PWS ID: UTAH10033 Rating: Approved 08/19/2020 Active 1 Admin Contact (AC) [ eMail address is REQUIRED ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: Matthew *Last Name: Chambers *Organization: *Address: Redacted *City: Moab *State: UT *Zip: 84535 *Email: maintenancemanager@sorrelriver.com *Phone: 9376818850 2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: SORREL RIVER RANCH WATER ATTN: MATHEW CHAMBERS *Address: mm 17, UT-128 *City: MOAB *State: UT *Zip: 84535 *Email: maintenancemanager@sorrelriver.com *Phone: 4352594642 DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 1 of 26 3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: Sorrel River Ranch Water, Attn: Matthew Chambers *Address: MM 17, UT-128 *City: Moab *State: UT *Zip: 84535 *Email: maintenancemanager@sorrelriver.com *Phone: 4352594642 4 Direct Operator in Charge (DO) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: MATTHEW *Last Name: CHAMBERS *Organization: *Address: MM 17, UT-128 *City: MOAB *State: UT *Zip: 84535 *Email: maintenancemanager@sorrelriver.com *Phone: 9376818850 5 Does the system serve a Residential population?Y 5A Population - Residential 80 5B Operating Period (Start Date) - Residential 01/01 5C Operating Period (End Date) - Residential 12/31 6 Does the system serve a Transient population? (A transient population is a rotating population that is served by a water system that does not remain in the jurisdiction of the water system for long periods of time. Examples of a transient population include, but are not limited to, campers at a campground, users of a highway rest stop, skiers at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.) Y 6A Population - Transient 180 6B Operating Period (Start Date) - Transient 01/01 6C Operating Period (End Date) - Transient 12/31 7 Does the system serve a Non-Transient population? (A non-transient population is a population served by a water system that is the same population being served by the system for at least six months of the year, but is not a resident in the system. Examples of a non-transient population include, but are not limited to, employees of a restaurant, shop, or ski resort; teachers and students at a school, day-care center, or church; doctors, nurses, and other employees at a hospital or healthcare clinic.) N 8 Population - Wholesale :0 9 Residential Connections:24 DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 2 of 26 Site Visit Info Management and Operations 10 Commercial Connections:14 11 Industrial Connections:0 12 Agricultural Connections:0 13 Date of Survey (First Day of Field Work)10/15/2024 14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the header ** 10/15/2024 15 Date final report sent to system (questionnaire, deficiency report and capacity spreadsheet) 10/23/2024 16 Water system representative present during the survey:Matt Chambers 17 How much time was spent to prepare survey documents prior to field survey? (Round up to nearest quarter hour) 2 18 How much time was spent to complete the field survey (arrival to completion; include travel time between water system facilities)? (Round up to nearest quarter hour) 4 19 How much time was spent traveling from the office to system and back again at the end of the field survey? (Round up to nearest quarter hour) 11 20 How much time did it take to finish the Survey Report? (Round up to nearest quarter hour) 2 21 Did you survey multiple water systems in one trip? ... if yes, answer the following question(s) N 22 For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power option. SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system without naturally flowing water sources, such as springs or flowing wells, to have one or more of the system's sources equipped for operation during power outages. To ensure continuous service when the primary power has been interrupted, a redundant power supply is required. A redundant power supply may include a transfer switch for auxiliary power such as a generator or a power supply service with coverage from two independent substations. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: Hook up for a portable generator that can run one of the filters.) 23 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a different question] SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Three facilities are in service without operating permits: CT Tank, CT Booster Pump, and the Water Softener.) 24 Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3) C 25 Does the system haul water?N DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 3 of 26 Cross Connection and Operator Certification 26 For a community system serving 100 or more connections, at least 2 water sources are available. SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems serving more than 100 connections to have a minimum of two sources except where served by a water treatment plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not more than 100 connections, plus they have a WTP) 27 Does system have a consecutive connection to another water system not listed in the SOURCE section of Waterlink Report? If yes, answer the following question(s) N 28 Does the system have a deficiency meeting the required source capacity? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 29 Does the system have a deficiency meeting the required storage capacity DUE SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 30 Does the system have a deficiency meeting the required equalization storage capacity for indoor/outdoor demands (but not because of fire suppression needs)? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 31 Does your water system have an Emergency Response Plan? REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Y 32 Does your Emergency Response Plan address cybersecurity? (required for systems over 3,300 population) MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. NA (Notes: Not serving over 3,300 people) 33 Does your water system use any computers, laptops, phones, tablets, or any other computer systems to manage, operate, or maintain the PWS (SCADA or Industrial Control Systems)? This includes any water sources, treatment, distribution or any process related to operation function Y 34 Does your water system use any computer systems in regular business operations such as accounting, billing, payroll, human resources, or management? Y 35 Legally adopted authority statement MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). C 36 Documentation of annual public awareness and/or employee training MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. C 37 Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. D (Notes: Needs a cross connection administrator) DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 4 of 26 General Maintenance and Environment Distribution 38 Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. C 39 Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. C 40 Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every community and NTNC water system and public water systems that utilize treatment/filtration to have at least one operator certified at the classified grade of the water system. Certification must be appropriate for the type of system operated (treatment and/or distribution). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 41 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1 hour travel time, under normal work and home conditions, of each drinking water system for which he is considered in direct responsible charge. C 42 Are there any visual indications of unsanitary conditions? SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The Secondary Maximum Contaminant Levels for public water systems deals with substances which affect the aesthetic quality of drinking water. They are presented here as recommended limits or ranges and are not grounds for rejection. The taste of water may be unpleasant and the usefulness of the water may be impaired if these standards are significantly exceeded. R309-105-18 The Director or the local health department shall be informed by telephone by a water supplier of any "emergency situation". The term "emergency situation... R309-215-4(3) If the water fails to meet minimum standards, then certain public notification procedures shall be carried out, as outlined in R309-220. Water suppliers shall also keep analytical records in their possession, for a required length of time, as outlined in R309-105-17. C 43 No unprotected connection between the distribution system and a source of contamination. (If there is an unprotected connection, describe the location in detail.) SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11) C 44 Are air release/vacuum valves in the distribution system? ... if yes, answer the following question(s) N DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 5 of 26 General Disinfection ST001 - 15000 GALLON NORTH TANK - CLEARWELL - Active 45 Water system has a program to maintain, operate, or control the use of fire hydrants. REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the distribution system. In order to protect the quality and integrity of the water, fire hydrant access should be controlled. C 46 Blow offs or air release valves are not directly connected to a sanitary sewer line. SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states blow-offs or air relief valves shall not be connected directly to a sewer. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 47 Blow offs or air release valves do not discharge below flood level in ditches or streams. SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3) C 48 All water mains installed after 1995 that provide fire flow are at least 8 inches in diameter. MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis indicates that required flow and pressures can be maintained by 6-inch lines. C 49 Distribution system capable of providing minimum pressure of 20 psi at all service connections. SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution system shall maintain minimum pressures as required by R309-105-9 at all points of connection under all flow conditions. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 50 Was the water system constructed or new portions added after January 1, 2007? ... if yes, answer the following question(s) N 51 Water system follows AWWA disinfection procedures for new, repaired, or seasonal water mains and tanks. SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and appurtenances shall be disinfected in accordance with AWWA Standard C651. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 52 How often do you periodically disinfect any or all parts of your water system (i.e. batch disinfection) other than for repairs or maintenance? SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of Engineering Plans and Specifications R309-500-6 Plan Approval Procedure. C 53 Is this facility Active or Inactive?A 54 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 5665 DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 6 of 26 55 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 56 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 57 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 58 Are air vents present? ... if yes, answer the following question(s)Y 58A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 58B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 58C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 58D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 7 of 26 59 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 59A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 59B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 59C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Gasket is not sufficient) 60 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 61 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 62 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 63 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 64 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 8 of 26 ST002 - 15000 GALLON SOUTH TANK - Active 65 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y (Notes: Shares an overflow with ST002) 65A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 65B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 65C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 66 Are the drain line and overflow combined?Y 67 Is this facility Active or Inactive?A 68 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 15000 69 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 70 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 9 of 26 71 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72 Are air vents present? ... if yes, answer the following question(s)Y 72A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 72C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 72D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 73 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 73A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 73B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 10 of 26 73C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Gasket not sufficient) 74 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 75 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 76 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 77 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 78 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 79 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 79A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 79B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 11 of 26 ST003 - CT CLEARWELL TANK - Active 79C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 80 Are the drain line and overflow combined?Y 81 Is this facility Active or Inactive?A 82 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 9000 83 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 84 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 85 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 86 Are air vents present? ... if yes, answer the following question(s)Y 86A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 86B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 12 of 26 86C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 86D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 87 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 87A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 87B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 87C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Missing Gasket) 88 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 89 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 13 of 26 PF001 - CT BOOSTER STATION -- Pump Stations - Active 90 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 91 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 92 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 93 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N (Notes: Needs an exception that was not included in the PA) 94 Are the drain line and overflow combined?Y 95 Is this facility Active or Inactive?A 96 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 97 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 98 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Does not pressurize distribution) 99 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 14 of 26 PF002 - WTP FINISHED WATER PUMP -- Pump Stations - Active 100 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 101 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 102 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) N 103 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 104 Is this facility Active or Inactive?A 105 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 106 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 107 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Does not pressurize distribution system) 108 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 109 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 15 of 26 TP001 - SORREL RANCH WTP -- Treatment General - Active 110 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 111 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) N 112 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 113 Is this facility Active or Inactive?A 114 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 115 Operating Period (Start Date)01/01 116 Operating Period (Ending Date)12/31 117 What is the objective of the treatment process and how do you know it is working? (e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.) Surface Water Treatment 118 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how you determine you are meeting your Treatment Requirements. Conventional Filters for C and G, chlorine for V 119 What Chemicals are used? Why?Sumaclear, filter aid, and liquid Cl2 120 How is the chemical dose adjusted with flow and water quality? Prompts: What flow rate is used for the adjustment (influent, effluent, CFE)? What water quality parameters would make you change dose rate? All dosing pumps are flow paced 121 Does influent flow rate vary?Y 121A If yes, why does influent flow rate vary?Based on demand 121B If yes, does chemical dose rate adjust to remain compliant at different flow conditions?Yes 122 Process control testing is consistent with the specific treatment process MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 123 There is a means to accurately measure the quantities of chemicals used. SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for measuring the quantities of chemicals used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: All chemical containers used to dose have liquid level measurements that are recorded daily.) DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 16 of 26 124 Treatment plant properly secured to protect the quality of the treated water, R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 125 Are liquid chemicals used? ... if yes, answer the following question(s)Y 125A Proper cross-connection control is provided on the service water lines that feed the solution tanks SIG | 50pts | TR | TG53 | R309-525-11(9)(b)(i) | Rule requires cross connection control to be provided to assure that the make-up waterlines discharging to solution tanks shall be properly protected from backflow as required by the Utah Plumbing Code. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 125B There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. D (Notes: Missing secondary containment for chemicals) 125C If there is a day tank, the bulk tank and day tanks have separate screened vents. MIN | 15pts | TR | TG60 | R309-525-11(8)(b)(vi) | Rule requires acid storage tanks to be vented to the outside atmosphere, but not through vents in common with day tanks. NA (Notes: Not separate day and bulk tanks) 125D Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals or liquids MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 125E No direct connections exist between a sewer and drain or overflow from the feeder, solution chamber, or tank. SIG | 50pts | DS | M020 | R309-105-12(1) | Rule states that a water supplier shall not allow a connection to his system which may jeopardize its quality and integrity. Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 125F Chemical storage tank access opening properly covered? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 126 Treatment chemicals meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 17 of 26 TP002 - SORREL WATER SOFTENER -- Treatment General - Active 127 Are all chemical feeders properly verified for accuracy? SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the necessary amounts of chemicals at an accurately controlled rate, throughout the anticipated range of feed. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 128 Spare parts are available for all chemical feeders MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 129 Incompatible chemicals stored separately SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are incompatible from being fed, stored, or handled together. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 130 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Need to be able to prove that they can know the dose of the chemicals.) 131 Raw water compliance samples are collected before any treatment. R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) Y 131A If yes, was location shown?Can grab samples out of the wet well prior to the filters 132 Where are finished water quality monitoring samples collected?Off the smooth nose sample tap after the CT Booster Pump 133 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the proper disposal of treatment plant waste to land or water? MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 134 Which parameters are watched when running treatment plant?Flow, turbidity, and cl2 residual 135 What type of alarm system is used?SCADA 136 Does treatment plant have a SCADA system?Y 136A Can operators respond to all alarms in a normal day, or do they have to silence legitimate alarms? yes 136B How are alarm set points adjusted and how are changes recorded?recorded in the SCADA program 137 Proper lab equipment on site to support required operations & maintenance of the plant? SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be provided to assure proper operation and monitoring of the water plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 138 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 18 of 26 139 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 140 Operating Period (Start Date)01/01 141 Operating Period (Ending Date)12/31 142 What is the objective of the treatment process and how do you know it is working? (e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.) Water softening 143 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how you determine you are meeting your Treatment Requirements. No aesthetic complaints 144 What Chemicals are used? Why?Salt for the brine regeneration 145 How is the chemical dose adjusted with flow and water quality? Prompts: What flow rate is used for the adjustment (influent, effluent, CFE)? What water quality parameters would make you change dose rate? no chemicals are dosed to the water with this treatment. 146 Does influent flow rate vary?Y 146A If yes, why does influent flow rate vary?Demand. 146B If yes, does chemical dose rate adjust to remain compliant at different flow conditions?N/A since IX does not actively dose chemicals 147 Process control testing is consistent with the specific treatment process MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 148 There is a means to accurately measure the quantities of chemicals used. SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for measuring the quantities of chemicals used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No chemicals are dosed with IX) 149 Treatment plant properly secured to protect the quality of the treated water, R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 150 Are liquid chemicals used? ... if yes, answer the following question(s)N 151 Treatment chemicals meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 19 of 26 TP001 - SORREL RANCH WTP -- Treatment General 152 Are all chemical feeders properly verified for accuracy? SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the necessary amounts of chemicals at an accurately controlled rate, throughout the anticipated range of feed. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No chemical feeders) 153 Spare parts are available for all chemical feeders MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem NA (Notes: no chemical feeders) 154 Incompatible chemicals stored separately SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are incompatible from being fed, stored, or handled together. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 155 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No chemical dosing with this treatment technique) 156 Raw water compliance samples are collected before any treatment. R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) Y 156A If yes, was location shown?Can be collected after the CT finish pump 157 Where are finished water quality monitoring samples collected?From the connection taps although there is nothing to sample after IX 158 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the proper disposal of treatment plant waste to land or water? MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 NA (Notes: Does not need a UPDES) 159 Which parameters are watched when running treatment plant?Amount of water treated 160 What type of alarm system is used?SCADA 161 Does treatment plant have a SCADA system?Y 161A Can operators respond to all alarms in a normal day, or do they have to silence legitimate alarms? Same as TP001 161B How are alarm set points adjusted and how are changes recorded?Same as TP001 162 Proper lab equipment on site to support required operations & maintenance of the plant? SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be provided to assure proper operation and monitoring of the water plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 20 of 26 TP001 - SORREL RANCH WTP -- Treatment - Chlorination General - Active 163 Pre- and post-chlorination systems for surface water plants shall be independent to prevent siphoning of raw or partially treated water into the clear well. SIG | 50pts | TR | TG35 | R309-520-7(1)(h), R309-525-11(9)(a) and (b) | Pre- and post-chlorination systems must be independent to prevent possible siphoning of partially treated water into the clear well. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Only post chlorination) 164 For a surface water plant serving more than 3,300 persons, chlorine residual of water entering the distribution system shall be continuously measured. SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: POE is continuously analyzed but does not exceed the 3300 threshhold) 165 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how treatment requirements for Giardia, Virus and Cryptosporidium removal/inactivation determine are determined? Conventional for G and C, Cl2 for V 166 Is a gas chlorination facility located inside of a water treatment plant with multiple processes and operating areas? ... if yes, answer the following question(s) N 167 Do you treat recycled water?N 168 Are finished water storage (clearwell and/or backwash tank) access openings present? ... if yes, answer the following question(s) N 169 Primary disinfection to complete surface water treatment requirements is achieved prior to the first connection at peak flow conditions SIG | 25pts | TR | T096 | R309-525-16(b) and (b)(i) | R309-525-16(b) and (b)(i) C 170 Disinfection compliance monitoring location demonstrates adequate CT has been achieved SIG | 25pts | TR | T099 | R309-215 | R309-215 C 171 Is this facility Active or Inactive?A 172 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. Y 172A If yes, no new connections have been added prior to approved first connection that would change the disinfection CT calculation. SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of disinfectants shall be at a location that will achieve the required disinfection CT prior to the first service connection. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 173 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 21 of 26 174 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 175 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No dilution required) 176 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 177 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 178 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 179 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 180 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 180A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Flow measured before filters 181 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 182 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 183 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 22 of 26 TP001 - SORREL RANCH WTP -- Liquid Hypochlorination - Active 183A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 183B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 183C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 183D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 183E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 184 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 185 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: Already has overall points for not knowing chemical dosing) 186 Is this facility Active or Inactive?A 187 Operational means provided to avoid injection of significantly decayed hypochlorite, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 188 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 189 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 23 of 26 TP001 - SORREL RANCH WTP -- Coagulation TP001 - SORREL RANCH WTP -- Flocculation TP001 - SORREL RANCH WTP -- Filtration - General 190 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (a full eyewash station and shower is not required) SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Already has full shower) 191 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C 192 Records are kept to minimize the use of decayed hypochlorite solution MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 193 There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C (Notes: Already has points for lacking spill containment around all the chemicals) 194 Primary coagulant used at all times the plant is in operation Y 195 What primary coagulant is being used?P (Notes: Sumaclear) 196 Is a coagulant aid or filter aid being added?Y 197 Is there a means to determine coagulant dosage? MIN | 15pts | TR | T083 | R309-525-11(2)(a) and (d) | R309-525-11(2)(a) and (d) C (Notes: Already has points for not knowing dosing overall) 198 There is a standard operating procedure (SOP) available for adjusting flocculator speed. N (Notes: Does not have a mechanical flocculator. just a static rapid mix prior to going through the package plant.) 199 Does the flocculation process produce visible floc? MIN | 15pts | TR | T082 | R309-525-12(2)(g) | The flocculation unit shall be capable of producing a visible, settleable flow. C 200 Instrumentation and controls for the process are operational, and in service SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 201 Is turbidity monitoring required? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 24 of 26 TP001 - SORREL RANCH WTP -- Filtration - Multi-Media (Rapid Sand) TP002 - SORREL WATER SOFTENER -- Ion Exchange 201A How often is the turbidity meter calibrated?Monthly 201B How often is the flow of turbidity meter verified?Monthly 201C Is continuous turbidity monitoring in operation. SIG | 50pts | TR | T005 | R309-525-15(4)(b)(vi), R309-525-15(4)(c)(vii) | Each dual media and tri-media filter must be provided with equipment which shall continuously monitor turbidity in the filtered water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 202 What is the maximum filtration rate throughout the year (in gpm/sf)?6 203 What criteria are used to determine when a filter backwash is needed?T (Notes: Currently operating off of time, also the plant has a kill switch for turbidity) 204 What criteria are used to determine filtration is functioning properly? (PSI, Turbidity, Headloss, Flow rate, water quality parameter) turbidity mainly 205 Criteria is used to determine filter loading rate meets the manufacturers recommendations? R309-525-15(2) Explain in comments... MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 206 What criteria are used to determine if filter media needs to be replaced?Currently unknown, will be performing dpeth and seive analysis 207 Is backwash flow rate verified to determine it meets minimum requirements? MIN | 15pts | TR | T076 | R309-525-15(7) | Rule requires that backwash systems be designed and operated to provide for adequate backwash with minimum media loss. C 208 If system filters by Direct Filtration, the plant is configured to shut down automatically when a source water exceeds 20 NTU for longer than 3 hours, or when the source water turbidity exceeds 30 NTU at any time? R309-530-5(3)(g) SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not a direct filtration plant) 209 Are the filters equipped with surface wash or air scour to enhance backwash?N 210 Filter media is evaluated to verify it meets the manufacturer's specifications for depth and effective media size? SIG | 25pts | TR | T033 | R309-525-15(4) | R309-525-15(4) D (Notes: Need a sieve analysis) 211 What is the depth of media required for this filtration system? Explain in comments... MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. D (Notes: Need to check the depth of the anthracite) DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 25 of 26 212 Salt used for the brine solution is certified to meet the ANSI/NSF 60 standard SIG | 25pts | TR | T080 | R309-525-11(5), R309-525-25(1), R309-535-11(5)(d) | Rule requires that all chemicals added to water being treated for use in a public water system for human consumption comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 213 Make-up water inlet is protected from back-siphonage SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 214 Overflows are protected with corrosion resistant screens and terminate with a down turned discharge with at least 6 inches of clearance from the floor SIG | 50pts | TR | TX08 | R309-525-11(8)(b)(v), R309-525-11(9)(b)(iii) | R309-525- 11(9)(b) For an ion exchange facility where the overflow discharge piping is not protected with a corrosion resistant screen or is not terminated with a downturned bend with adequate clearance to prevent cross connection 10 points shall be assess D (Notes: Missing a screen on the overflow from the brine tank) 215 There is a brine measuring tank or a means of metering proper dilution MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 216 Does media type require regeneration or periodic replacement?Y 216A If yes, what criteria is used to determine when to regenerate or replace the media?Amount of water treated through the IX tanks 216B If yes, what is the time interval between media regeneration/replacement?Based on flow of water flowed. 217 Operational differential pressure is monitored and recorded? SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/23/2024 20:04:13 | Rating: Approved UTAH10033 SORREL RIVER RANCH WATER page 26 of 26