PWS Number:UTAH10033 Deficiency Points:295 Survey Date:10/15/2024
Survey Name:SORREL RIVER RANCH
WATER
Surveyor:Danielle Zebelean
Sanitary Survey Category: SM
SDWIS Severity Code: Significant Deficiency
Management and Operations | DS001 | UTAH10033 DISTRIBUTION SYSTEM
23. There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not
gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE]
[undocumented sources are covered in a different question]
Rule: R309-100-5(2), R309-500-6, R309-500-9,
R309-500-9(2) and (3)
Rule requires complete plans & specification for all public drinking water projects to
be approved in writing by the Director. Any facility found that has not started DDW
review shall be considered unapproved. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:Three facilities are in service without operating permits: CT Tank, CT Booster Pump, and
the Water Softener.
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: G001 UNAPPROVED FACILITY IN SERVICE
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH10033 DISTRIBUTION SYSTEM
37. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/
GREATER CCC TRAINING)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes an operator with adequate training in the area of cross connection control
or backflow prevention.
Notes:Needs a cross connection administrator
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST001 | 15000 GALLON NORTH TANK - CLEARWELL
59C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:Gasket is not sufficient
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST002 | 15000 GALLON SOUTH TANK
73C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:Gasket not sufficient
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST003 | CT CLEARWELL TANK
87C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:Missing Gasket
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST003 | CT CLEARWELL TANK
93. Is a tank overflow present? ... if yes, answer the following question(s)
Rule: R309-545-13 Rule requires all storage tanks to be provided with an overflow that discharges at an an
elevation between 12 and 24 inches above the ground surface or the rim of the receiving
basin. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
Notes:Needs an exception that was not included in the PA
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: VL01 STORAGE TANK LACKS AN OVERFLOW
Sanitary Survey Category: TR
SDWIS Severity Code: Minor Deficiency
Treatment - General | TP001 | SORREL RANCH WTP
125B. There are adequate spill containment provisions for acid and caustic liquids.
Rule: R309-525-11(6)(a)(iv)(B), R309-525-
11(8)(b)(viii)
Rule requires liquid chemical storage tanks to have an overflow and receiving basin or
drain capable of receiving accidental spills or overflows, and meeting all the
requirements of R309-525-23.
Notes:Missing secondary containment for chemicals
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: TG59 LACKS CONTAINMENT PROVISIONS TO HANDLE SOLUTION TANK SPILLS OR
OVERFLOWS
Sanitary Survey Category: MR
SDWIS Severity Code: Significant Deficiency
Treatment - General | TP001 | SORREL RANCH WTP
130. Daily operating records reflect chemical dosages and total quantities used
Rule: R309-105-14(3)(a)Rule requires all water system using chemical addition or specialized equipment for the
treatment of drinking water to regularly complete operational reports. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Notes:Need to be able to prove that they can know the dose of the chemicals.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: TG20 DAILY RECORDS DO NOT REFLECT DOSAGES ACCURATELY
Sanitary Survey Category: TR
SDWIS Severity Code: Significant Deficiency
Dual-Media (also called Rapid Sand) - Filtration | TP001 | SORREL RANCH WTP
210. Filter media is evaluated to verify it meets the manufacturer's specifications for depth and effective media size?
Rule: R309-525-15(4)R309-525-15(4)
Notes:Need a sieve analysis
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: T033 MEDIA DEPTHS NOT MEETING REQUIREMENTS
Sanitary Survey Category: TR
SDWIS Severity Code: Minor Deficiency
Dual-Media (also called Rapid Sand) - Filtration | TP001 | SORREL RANCH WTP
211. What is the depth of media required for this filtration system? Explain in comments...
Rule: R309-105-7, 8 & 18, R309-100 through
605
Trigger for regulatory followup to address concerns.
Notes:Need to check the depth of the anthracite
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS
Sanitary Survey Category: TR
SDWIS Severity Code: Significant Deficiency
Ion Exchange | TP002 | SORREL WATER SOFTENER
214. Overflows are protected with corrosion resistant screens and terminate with a down turned discharge with at least 6 inches of clearance from
the floor
Rule: R309-525-11(8)(b)(v), R309-525-
11(9)(b)(iii)
R309-525-11(9)(b) For an ion exchange facility where the overflow discharge piping is
not protected with a corrosion resistant screen or is not terminated with a downturned
bend with adequate clearance to prevent cross connection 10 points shall be assess
Notes:Missing a screen on the overflow from the brine tank
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: TX08 SOLUTION TANK OVERFLW PIPE NOT DOWNTURNED OR LACKING A
CLEARANCE OF 6 INCHES OR MORE