HomeMy WebLinkAboutDDW-2024-012526Sanitary Survey - Deficiency Report
PWS Number:UTAH03125 Deficiency Points:250 Survey Date:10/03/2024
Survey Name:USU FORESTRY FIELD
CAMP SPRING
Surveyor:Brian Pattee
Sanitary Survey Category: SM
SDWIS Severity Code: Significant Deficiency
Management and Operations | DS001 | UTAH03125 DISTRIBUTION SYSTEM
23. There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not
gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE]
[undocumented sources are covered in a different question]
Rule: R309-100-5(2), R309-500-6, R309-500-9,
R309-500-9(2) and (3)
Rule requires complete plans & specification for all public drinking water projects to
be approved in writing by the Director. Any facility found that has not started DDW
review shall be considered unapproved. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:NSO,s get this standard deficiency , which will go away when operating permits are issued
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: G001 UNAPPROVED FACILITY IN SERVICE
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH03125 DISTRIBUTION SYSTEM
35. Legally adopted authority statement
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes a legally adopted and functional local authority to enforce the program
(i.e., ordinance, bylaw, or policy).
Notes:None
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M003 CCC-LACKS LOCAL AUTHORITY
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH03125 DISTRIBUTION SYSTEM
36. Documentation of annual public awareness and/or employee training
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes providing public education or awareness material or presentations.
Notes:None
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH03125 DISTRIBUTION SYSTEM
37. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/
GREATER CCC TRAINING)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes an operator with adequate training in the area of cross connection control
or backflow prevention.
Notes:None
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH03125 DISTRIBUTION SYSTEM
38. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps
installed within the system)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes written records of cross connection control activities.
Notes:None
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH03125 DISTRIBUTION SYSTEM
39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:none
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: DS
SDWIS Severity Code: Significant Deficiency
Distribution | DS001 | UTAH03125 DISTRIBUTION SYSTEM
44A. Open end of vent line covered with #14 mesh screen
Rule: R309-550-6(6)(b)Rule states the open end of the air relief vent pipe from automatic valves shall be
provided with a #14 mesh, non-corrodible screen and a downward elbow, and where
possible, be extended to at least one foot above grade. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
Notes:No screen
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: D004 AIR RELIEF VALVE PIPE LACKS NO. 14 SCREEN
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | LITTLE BEAR SPRING
57. Area of equal or higher elevation within 50 feet of spring collection devices is fenced.
Rule: R309-515-7(7)(e)Rule requires a stock-tight fence around the spring collection area.
Notes:Extremely steep , Fencing not possible,
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS02 SPRING COLLECTION AREA NOT FENCED
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | LITTLE BEAR SPRING
59B. Overflow has a minimum of 12 inch clearance above flood rim of receiving basin
Rule: R309-515-7(7)(d), R309-545 Overflow pipes on junction and collection boxes shall comply with R309-545 and
discharge a minimum of 12 inches above the ground surface or rim of the receiving
basin. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
Notes:Overflow Pipes are screened on the inside of spring box and are not visible on the outside of
box due to large rocks surrounding said box , in steep ravine.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS14 SPRING BOX OVERFLOW OR DRAIN LACKS FREE FALL OF 12 TO 24 INCHES
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | LITTLE BEAR SPRING
65B. Spring box lid is gasketed
Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished
with a gasket between the lid and frame. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:No Gasket present
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | LITTLE BEAR SPRING
65E. Spring box lid is locked
Rule: R309-515-7(7)(d), R309-545-14 (3)Access openings shall comply with R309-545 and the lids to the openings shall be
locked. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
Notes:Lid was able to be removed , Needs lock on 2 sides
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS13 SPRING BOX LID IS NOT LOCKED
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | LITTLE BEAR SPRING
66. Is a spring box vent present? ... if yes, answer the following question(s)
Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect
to venting. Therefore, a junction or collection box requires a vent to be fitted with #14
mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or
covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Notes:No Vent, No evidence of vacuuming, Vent in this heavy snow area would be adding risk of
compromise and contamination.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | LITTLE BEAR SPRING
67. Spring has a permanent flow-measuring device.
Rule: R309-515-7(7)(h)Rule requires a spring to have a permanent flow measuring device.
Notes:No means to measure flow other than bucket/timing method
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS01 LACKS A PERMANENT DEVICE FOR MEASURING SPRING FLOW