HomeMy WebLinkAboutDAQ-2024-011139DEPA,RTMENT OF TI{E AIR FORCE
75TH CIVIL ENGINEER GROUP (AFMC)
HILL AIR FORCE BASE UTAH
30luly 2024
Amanda Burton
Chief, Environmental Branch
7290Weiner Street, Building 383
Hill AFB UT 84056-5003
Director
Utah Division of Air Quality
Attention: Compliance Section
P.O. Box 144820
salt Lake ciry uT 84114-4920
Dear Director
UTAH DEPARTMENT OF
ENVIRONMENTAL QUALITY
AUG 21 2A24
\{and
DIVISION
c\e\r lqre)
OF AIR QUALTV
Enclosed is the Semiannual Monitoring Report for Hill Air Force Base. The report is
submitted in accordance with 40 CFR Part 70 and summarizes the compliance status of Title V
Permit #1100007004. The reporting period covered is I June 2023 through 30 November 2023.
If you have any questions regarding this matter, please contact Dr. Erik Dettenmaier,
75 CEG/CEIEA, at (801) 777-0888 or erik.dettenmaier.l@us.af.mil.
Sincerely
Signed by: BURTON.AMANDA.CHRtSTtNE.l 270023068
AMANDA BURTON, NH-III, DAF
Chief, Environmental Branch
Attachment:
Semiannual Monitoring Report
cc:
U.S. Environmental Protection Agency, Region VIII
Air Permitting and Monitoring Branch (mail code 8ARD-PM)
1595 Wynkoop Street
Denver CO 80202-1129
REVIEWEDInitials: Date: September 9, 2024Compliance Status: OKFile #: 10121 (B2)Comment: Wrong report period date on cover letter.
Title v compliance Monitoring Report - Main Base, permit #l 100007004
TO:
FROM:
RE:
DATE:
srgnature of a Responsible Official for the Source
DANIEL L. CORNELIUS, Colonel, USAF
Installation Commander, 75th Air Base Wing
7981 Georgia Street
HiltAFB UT 84056-5824
Executive Secretary, Utah Division of Air euality
Hill Air Force Base, Main Base
Semiannual Monitoring Report for permit #f 100007004
Ausust 15.2024
In accordance with operating Permit provision I.S.2.a, and Utah Administrative Code (UAC) R307-415-6a(3)(c)(i), the following monitoring report is submitted.
This report covers the period from 0l December 2023 to 3l May 2024.
For the indicated reporting period:
There were no deviations from any permit requirements.
Attached is a list of permit requirements for which there were deviations. The listincludes the information required by operating permit provision I.S.2.a, and UACR307-4l s-6a(3)(cXi).
In lieu of attaching the above list, deviation reports submitted in accordance with
permit provision I.S.2.c, and UAC R307-415-6a(3)(cXii) are referenced below.
Deviation report for 7 October 2023 through 3l May 2024 (deviation of conditionII.B.53.g), for 28 october 2023 through 3l May 2024 (deviation of conditionI.S.2.c), for 01 April 2024 through 0l August 2024 (deviation of condition
ll.B.47 .a'2) and for 22 April 2024 through I 5 August 2024 (deviation of condition
I.S.2.c).
In accordance with operating Permit provision I.K and uAC R307-415-5d, and based on information andbelief formed after reasonable inquiry, I certifu that the statements and information in this document aretrue, accurate, and complete.
tr
D
V
l.r rteat 2q
Date /
LJTA Hr)T=J'ARI-TV1 F NT OF
E NV r R O t!!.4 E t{l-At 9g4L I TY
AUG ?', 2024
Hand betiv
NI\/ISION OF AIR OUALITY
Signature of a Responsible Official