HomeMy WebLinkAboutDERR-2024-011526Recommended Pra ct ices for the Test ing and Ver ification of Spill , Overfill , Leak Detection and Secondary Contai nment Equipment at UST Facilities
APPENDIX C-9
MECHANICAL AND ELECTRONIC LINE LEAK DETECTORS
PERFORMANCE TESTS
Faci lit y Name: Owner:
Address: Add res s :
Cit y, Stat e, Zi p Co de: Cit y, Stat e, Zi p Cod e :
Facility I.D . #: Pho ne#:
Testing Company: Phone#: Date:
Th is data s heet ca n be used to test mechan ical line leak d et ectors (MLLD ) a nd electro nic li ne leak detectors (ELLD ) with s u bme rs ib le
turbi ne pump (STP) systems . See PE I/RP 1200 Sect io ns 9.1 a nd 9 .2 f o r t est pro cedu res.
Li ne Nu mber
Prod uct Stored
Leak Det ector M anuf acturer
Leak Detect o r Mode l
Type of Leak Det ecto r DMLLD DMLLD DMLLD DMLLD DMLLD D M LLD
DELLD DELLD DELLD D ELLD DELLD D ELLD
MLLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG)
ST P Full Opera t ing Pressure
Check Valve Hold in g Pressu re
Li ne Resi liency (m l) (lin e bleed back vol-
ume as measured f rom check va lve hold-
ing press ure to 0 psig)
Step Th ro ugh Ti me in Sec onds (ti me the
MLLD hesitates at metering pressure
before go ing to full operating pres s ure
as measured from 0 psig with no leak
ind uced on t he li ne)
Metering Pressure (STP pressu re whe n
simu lated lea k rate 3 gph at 10 psig)
Ope ning Time in Seconds (the ti me t he
M LL D op ens t o a ll ow fu ll pressure after
simu lat ed leak is stop ped)
Does t he STP press ure rema in at or
below the metering pressure for at least D Yes D No D Yes D No D Yes DNo D Yes D No DYes D No D Yes D No 60 seco nds when t he simu lated leak is
induced?
Does the leak detector reset (trip) when D Yes D No D Yes D No DYes D No D Yes D No D Yes DNo D Yes DNo t he line press ure is bled off to zero psig?
Do es the STP prop erly cyc le on /off under D Yes D No D Yes D No D Yes D No D Yes D No D Yes D No DYes D No normal fue l system ope ration conditions?
A "No" answe r to eithe r of t he a bove quest io ns ind icates th e MLLD fai ls the test.
ELLD (ALL PRESSURE MEASUREMENTS ARE MADE IN PSIG)
STP Full Op erati ng Pr ess ure
How ma ny test cyc les are observed
before a lar m/shu tdow n occurs?
Does t he s imul ated leak ca use an alarm? D Yes D No D Yes D No D Yes D No D Yes D No D Yes D No D Yes D No
A "No" answer t o t he ab ove qu estion indi-
cates the ELLD fa il s t he test.
Does the simu lated leak cause an STP D Yes D No D Yes D No D Yes D No D Yes D No D Yes DNo D Yes D No
s hutdown? D NA D NA D NA D NA D NA D NA
Test Results DPass DFail DPass DFail DPass DFail DPass DFail DPass DFail DPass DFail
Comments:
Tester 's Name (pri nt) ________________ Tester 's Signatu re---------------
pei.org •
:::: n
" " [
~
" 0
"'
Recommended Practices for the Testing and Verification of Spill, Overfill, Leak Detection and Secondary Containment Equipment at UST Facilities
APPENDIX C-7
AUTOMATIC TANK GAUGE
OPERATION INSPECTION
Facility Name: Owner:
Address: Address:
City, State, Zip Code: City, State, Zip Code:
Facility I.D . #: Phone#:
Testing Company: Phone#: I Date:
This procedure is to determine whether the automatic tank guage (ATG) is operating properly. See PEI/RP1200 Section 8 .2 for the
inspection procedure. This procedure is applicable to tank level monitor stems that touch the bottom of the tank when in place.
Tank Number
Product Stored
ATG Brand and Model
1. Tank Volume, gallons
2. Tank Diameter, inches
3. After removing the ATG from the tank, it has
been inspected and any damaged or missing DYes DNo DYes DNo DYes DNo DYes DNo
parts replaced?
4. Float moves freely on the stem without DYes DNo DYes DNo DYes DNo DYes DNo binding?
5. Fuel float level agrees with the value pro-DYes DNo DYes DNo DYes DNa DYes DNa grammed into the console?
6. Water float level agrees with the value pro-DYes DNo DYes DNo DYes DNa DYes DNo grammed into the console?
7. Inch level from bottom of stem when 90%
alarm is triggered.
8.1nch level at which the overfill alarm activates
corresponds with value programmed in the DYes DNo DYes DNo DYes DNo DYes DNo
gauge?
9 . Inch level from the bottom when the water
float first triggers an alarm.
10. Inch level at which the water float alarm acti-
vates corresponds with value programmed in DYes DNo DYes DNo DYes DNo DYes DNo
the gauge?
If any answers in Lines 3 , 4, 5, or 6 are "No," the system has failed the test.
Test Results DPass DFail DPass DFail DPass DFail DPass DFail
Comments:
Tester's Name (print) _______________ _ Tester's Signature---------------
pei.org.
~ PEI/RP1200 -19
APPENDIX C-6
OVERFILL ALARM
OPERATION INSPECTION
Facility Name: Owner:
Address: Address:
City, State, Zip Code: City, State , Zip Code:
Facility I.D . #: Phone#:
Testing Company: Phone#: I Date :
This procedure is to determine whether the high level alarm is operational and will trigger when the tank is no more than 90% full.
See PEijRP1200 Section 7.3 for the inspection procedure . This procedure is applicable to tank level monitor stems that touch the
bottom of the tank when in place .
Tank Number
Product Stored
Tank Level Monitor Brand and Model
1 . Tank Volume, gallons
2 . Tank Diameter, inches
3. Overfill alarm activates in the test mode at the DYes DNo DYes DNo DYes DNo DYes DNo console?
4. When activated , overfill a larm can be heard or DYes DNo DYes DNo DYes DNo DYes DNo seen while delivering to the tank?
5. After removing the probe from the tank , it has
been inspected and any damaged or missing DYes DNo DYes DNo DYes DNo DYes DNo
parts replaced?
6 . Float moves freely on the stem without binding? DYes DNo DYes DNo DYes DNo DYes DNo
7. Moving product level float up the stem trigger DYes DNo DYes DNo DYes DNo DYes DNo alarm?
8. Inch level from bottom of stem when 90% alarm
is triggered.
9. Tank volume at inch level in Line 8 .
10. Calculate (Line 9 1 Line 1 ) x 100
11. Is Line 10 less than 90%? DYes DNo DYes DNo DYes DNo DYes DNo
12. Fuel float level on the console agrees with the DYes DNo DYes DNo DYes DNo DYes No gauge stick reading?
13. Overfill alarm activates at any product level DYes DNo DYes DNo DYes DNo DYes DNo above 90% tank capacity?
If any answers in Lines 3 , 4, 5, 6 , 7 or 11 are "No ," or Line 13 is "Yes ," the system has fa iled the test.
Test Results DPass DFail DPass DFail DPass DFail DPass DFail
Comments:
Tester 's Name (print) ______________ _ Tester's Signature---------------
• pei.org
r r n