Loading...
HomeMy WebLinkAboutDDW-2024-012396 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper State of Utah SPENCER J. COX Governor DEIDRE HENDERSON Lieutenant Governor Department of Environmental Quality Kimberly D. Shelley Executive Director DIVISION OF DRINKING WATER Nathan Lunstad, Ph.D., P.E. Director of Drinking Water October 1, 2024 Zachary Lowe Devils Canyon Campground USFS-Manti Lasal 599 West Price Dr. Price, UT 84501 Subject: Corrective Action Plan for Devils Canyon Campground, UTAH19018 (2024-01) Dear Zachary Lowe: The Division of Drinking Water (the Division) has received your request for a Corrective Action Plan to address the significant deficiencies associated with the Devils Canyon Campground water system. A copy of the Corrective Action Plan is enclosed with this letter. Please review the agreement and sign a copy if you agree with the terms and return the signed copy to the Division within 14 days of receipt of this agreement. A copy of the fully executed document will be returned to you. Please contact Brandi Smith at (385) 515-1650 or brandismith@utah.gov if you have any questions regarding this letter or the enclosed copy of Corrective Action Plan. Sincerely, Helen Lau Compliance and Operations Manager Division of Drinking Water Enclosures –Devils Canyon Campground Corrective Action Plan 2024-01 cc: Dennis Shumway, San Juan County Health Department, dshumway@sanjuancounty.org Curtis Page, P.E. Division District Engineer, cmpage@utah.gov Zachary Lowe, Devils Canyon Campground, Zachary.lowe2@usda.gov ' ) 0 — / C v A ? A C @ C w ? C ˜ Corrective Action Plan (2024-01) Devils Canyon Campground – UTAH19018 The purpose of this Corrective Action Plan (“CAP”) is to establish terms and conditions of compliance for Devils Canyon Campground (“System”), system number UTAH19018, to take actions and correct significant deficiencies identified in Exhibit A. The Corrective Action Plan terms and conditions are described in detail in Exhibit A. As long as the System complies with every one of the requirements in Exhibit A, the Division will: • Temporarily allow the extended deadlines for correcting the identified significant deficiencies, • Temporarily hold off assessing additional points for failure to fix violations, and • Temporarily silence the significant deficiencies and hold off reporting those to US EPA. Nothing in this Corrective Action Plan prohibits the Division from taking further enforcement actions if the System fails to comply with any of the requirements in Exhibit A or if an imminent public risk exists in the System. We the undersigned parties agree to the terms, conditions and deadlines set forth in the Corrective Action Plan (see Exhibit A). ___________________________________ ___________________________________ Helen Lau Zachary Lowe Compliance & Operations Manager Devils Canyon Campground _______________________, 2024 _______________________, 2024 # - 4 u * 2 Helen Lau (Oct 11, 2024 14:57 MDT) CAP Page 1 Exhibit A Corrective Action Plan UTAH19018, 2024-01 System Name: Devils Canyon Campground System Number: UTAH19018 Administrative Contact: Zachary Lowe Email: Zachary.lowe2@usda.gov Phone Number: Corrective Action Plan Requirements and Due Dates Distribution System (DS001) Item #1 Deficiency Code Facility ID Significant Deficiency Rule Citation M017 DS001 Water stagnation, biofilm or sediments contributes to drinking water contamination R309-200-6, R309105-18, R309215-4(3) Corrective Action Requirements Due Date Ensure that there is no water stagnation, biofilm or sediments contributes to drinking water contamination 06/01/2025 Item #2 Deficiency Code Facility ID Significant Deficiency Rule Citation V012 DS001 End of storage tank overflow pipe lacks a No.4 Screen R309-545-13(3) Corrective Action Requirements Due Date Ensure that the storage tank overflow pipe has a no.4 screen 05/01/2025 Item #3 Deficiency Code Facility ID Significant Deficiency Rule Citation V009 ST002 Storage tank lid lacks a functioning gasket between the lid and frame R309-545-14(2) Corrective Action Requirements Due Date Ensure that the storage tank lid has a proper gasket between the lid and frame 05/01/2025 CAP Page 2 Item #4 Deficiency Code Facility ID Significant Deficiency Rule Citation SS10 WS001 Spring box lid lacks a gasket R309-515-7(7)(d), R309- 545-14(2) Corrective Action Requirements Due Date Ensure that the spring box lid has a proper gasket 05/01/2025 Item #5 Deficiency Code Facility ID Significant Deficiency Rule Citation SS20 WS001 Unsealed openings in the spring collection box R309-515-7(7)(d), R309545- 9(1) and (2) Corrective Action Requirements Due Date Ensure that the openings in the spring box have been properly repaired 06/01/2025 Signature: Email:zachary.lowe2@usda.gov