Loading...
HomeMy WebLinkAboutDAQ-2024-0109731 DAQC-CI117930001-24 Site ID 11793 (B1) MEMORANDUM TO: FILE – SAVAGE SERVICES CORPORATION – Savage Energy Terminal THROUGH: Rik Ombach, Minor Source Oil and Gas Compliance Section Manager FROM: Kyle Greenberg, Environmental Scientist DATE: September 25, 2024 SUBJECT: FULL COMPLIANCE EVALUATION, Minor, Carbon County INSPECTION DATE: August 27, 2024 SOURCE LOCATION: 2025 East 5000 South Price, UT 84501 SOURCE CONTACTS: Butch Hansen, Operations Manager: 435-749-2458 LuAnn Koch, Coordinator: 435-637-5664 records OPERATING STATUS: Operating PROCESS DESCRIPTION: Coal transfer station. Coal, crushed to 6" minus size and screened at various coal mines in Carbon and Emery Counties, is transported in 40-ton haul trucks to this site. The haul trucks dump the coal into one of the underground hoppers where it is taken by conveyor to the concrete stacking tubes which stack the coal into stockpiles. The coal is then recovered from the stockpiles by underground reclaim systems. Finally, the coal is either loaded into haul trucks for delivery to area power plants or into a 10,000-ton load out silo. The coal silo is used to load railcars for domestic and over-seas deliveries. Coal with high ash content is washed in the on-site wash plant that consists of a fully enclosed crusher and screen. This process and equipment are operated by a contracting company. The company has also transloaded crude oil and M-I WATE into rail cars. APPLICABLE REGULATIONS: Approval Order (AO) DAQE-AN117930013-24, dated July 3, 2024 40 CFR Part 60 Subpart Y RO RO 2 SOURCE EVALUATION: Name of Permittee: Permitted Location: Savage Services Corporation Savage Energy Terminal 901 West Legacy Center Way 2025 East 5000 South Midvale, UT 84047 Price, UT 84501 SIC Code: ORA-01422: exact fetch returns more than requested number of rows Section I: GENERAL PROVISIONS I.1 All definitions, terms, abbreviations, and references used in this AO conform to those used in the UAC R307 and 40 CFR. Unless noted otherwise, references cited in these AO conditions refer to those rules. [R307-101] I.2 The limits set forth in this AO shall not be exceeded without prior approval. [R307-401] I.3 Modifications to the equipment or processes approved by this AO that could affect the emissions covered by this AO must be reviewed and approved. [R307-401-1] I.4 All records referenced in this AO or in other applicable rules, which are required to be kept by the owner/operator, shall be made available to the Director or Director's representative upon request, and the records shall include the two-year period prior to the date of the request. Unless otherwise specified in this AO or in other applicable state and federal rules, records shall be kept for a minimum of two (2) years. [R307-401-8] I.5 At all times, including periods of startup, shutdown, and malfunction, owners and operators shall, to the extent practicable, maintain and operate any equipment approved under this AO, including associated air pollution control equipment, in a manner consistent with good air pollution control practice for minimizing emissions. Determination of whether acceptable operating and maintenance procedures are being used will be based on information available to the Director which may include, but is not limited to, monitoring results, opacity observations, review of operating and maintenance procedures, and inspection of the source. All maintenance performed on equipment authorized by this AO shall be recorded. [R307-401-4] I.6 The owner/operator shall comply with UAC R307-107. General Requirements: Breakdowns. [R307-107] I.7 The owner/operator shall comply with UAC R307-150 Series. Emission Inventories. [R307-150] Status: Out of Compliance. The source is out of compliance with Condition I.3; an exceedance of the rolling 12-month transloading throughput limit of M-I WATE (barite) was observed during the time of inspection. Records were made available upon request. During the time of inspection, all equipment appeared to be well maintained and operated in a manner consistent with good air pollution control. Savage Services Corporation stated that there were no known breakdowns that have caused excess emissions and a 2023 emissions inventory has been submitted. 3 Section II: SPECIAL PROVISIONS II.A The approved installations shall consist of the following equipment: II.A.1 Savage Energy Terminal (Price) II.A.2 Four (4) Coal Truck Unloading Facilities Control: Enclosed receiving hoppers equipped with water sprays II.A.3 Five (5) Stacking Tubes With associated coal stockpiles II.A.4 Two (2) Radial Stackers Control: Covered II.A.5 One (1) Sampling Crusher Capacity: 2 tph Control: Enclosed in the building II.A.6 Two (2) Underpile Reclaim Systems II.A.7 One (1) Underground Reclaim II.A.8 One (1) Wash Plant With associated conveyor II.A.9 One (1) Radial Conveyor 36" X 100' Radial stock conveyor Control: Covered II.A.10 One (1) Belt Conveyor 36" X 150' conveyor to load out belt Control: Covered II.A.11 One (1) Silo Capacity: 10,000 tons Control: Enclosed extendable chute for railcar loading II.A.12 Three (3) Diesel Fuel Tanks Capacity: Less than 42,000 gallons each II.A.13 Three (3) Storage Tanks Capacity: One (1) 10,000 gal; Two (2) 20,000 gal Contents: Antifreeze -Listed for informational purposes only- II.A.14 One (1) Gasoline Fuel Dispensing Station Gravity Fed Capacity: 500 gallons MACT Applicability: Subpart CCCCCC 4 II.A.15 Four (4) Oil Transloading Racks Rating: 260 bbl/hr II.A.16 Four (4) Condensate Collectors Capacity: 5 gal (each) II.A.17 Four (4) Vapor Capture Systems Activated-Carbon (55 gal each) II.A.18 One (1) Emergency Generator Rating: 350 hp Fuel: Diesel MACT Applicability: Subpart ZZZZ II.A.19 One (1) Boiler Capacity: 10.5 MMBtu/hr Fuel: Natural Gas NSPS Applicability: Subpart Dc II.A.20 Haul Roads Control: Water sprayed and chemically treated II.A.21 Mobile Loading Conveyors *Listed for informational purposes II.A.22 Magnesium Hydroxide/M-I WATE Transloading One (1) electric blower (for information only) and (1) baghouse Status: In Compliance. No unapproved equipment was noted during the time of inspection. There was one radial stacker onsite and the emergency generator and boiler have been removed from site. II.B Requirements and Limitations II.B.1 Site-Wide Requirements II.B.1.a The owner/operator shall not allow visible emissions from the following emission points to exceed the following values: A. All crushers - 15% opacity B. All screens - 10% opacity C. All conveyor transfer points - 10% opacity D. All diesel engines - 20% opacity E. Conveyor drop points - 10% opacity F. Silo - 10% opacity 5 G. All baghouses - 10% opacity H. All other points - 20% opacity [R307-401-8] II.B.1.b Opacity observations of emissions from stationary sources shall be conducted while in operation in accordance with 40 CFR 60, Appendix A, Method 9. [R307-401-8] Status: In Compliance. During the time of inspection, no visible emissions were observed in exceedance of the applicable opacity limits. All coal material onsite appeared to be properly controlled with water to keep the dust within limits. The diesel engine is no longer onsite. II.B.2 Coal Transloading Requirements II.B.2.a The owner/operator shall not exceed the following: A. 7,000,000 tons of total coal throughput per rolling 12-month period B 1,000,000 tons of coal processed (crushed and screened) per rolling 12-month period [R307-401-8] II.B.2.a.1 The owner/operator shall: A. Determine the coal throughput with truck scales B. Determine the coal processed (crushed and screened) by supervisor monitoring of an operations log C. Record the coal throughput and coal processed (crushed and screened) each day D. Calculate a new rolling 12-month total by the 20th day of each month using data from the previous 12 months E. Keep all the records for all periods when the plant is in operation [R307-401-8] Status: In Compliance. The coal throughput limits have not been exceeded during a rolling 12-month. Throughput records were reviewed since January of 2023, see attached records. II.B.3 Coal Transfer and Crushing Requirements II.B.3.a The owner/operator shall enclose the following transfer points: A. Each conveyor transfer or drop point B. Reclaim conveyor from the primary coal stockpile to the stacking tube 6 C. All wash plants with associated screens, crushers, and conveyors [R307-401] II.B.3.b The owner/operator shall cover all above-ground conveyors. All reclaim points for the primary coal storage shall be beneath the stockpile. [R307-401] II.B.3.c The owner/operator shall operate water sprays and/or chemical treatment to control fugitive dust emissions from storage piles. Water sprays and/or chemical treatment shall operate as necessary to prevent visible emissions from exceeding the opacity limits listed in this AO. [R307-401] II.B.3.c.1 Records of water or chemical treatment shall be kept for all periods when the plant is in operation. [R307-401-8] II.B.3.d The owner/operator shall install and operate water sprays or chemical dust suppression sprays at the following points to control fugitive emissions: A. All crushers B. All screens The sprays shall operate as necessary to prevent visible emissions from exceeding the opacity limits listed in this AO. [R307-401-8] II.B.3.e The owner/operator shall control the disturbed or stripped areas at all times (24 hours per day every day) for the duration of the project/operation until the area is reclaimed. Areas disturbed during construction of the facility and not subjected to repeated disturbance shall be revegetated. Repeatedly disturbed areas shall be chemically treated or water sprayed as necessary to prevent visible emissions from exceeding the opacity limits listed in this AO. [R307-401-8] II.B.3.f In addition to the requirements of this AO, all applicable provisions of 40 CFR 60, New Source Performance Standards (NSPS) Subpart A, 40 CFR 60.1 to 60.18 and Subpart Y, 40 CFR 60.250 to 60.254 (Standards of Performance for Coal Preparation Plants) apply to this installation. The owner/operator must operate in accordance with the most current version of 40 CFR 60 applicable to this source. The following emission points are subject to Subpart Y: A. All crushers (above ground) B. All screens (above ground) C. All conveyors (above ground) D. Storage silo stack. [40 CFR 60 Subpart Y] Status: In Compliance. All required equipment with transfer points is enclosed. All crushers, screens, disturbed or stripped area, storage silo stack, and haul roads appeared to be treated with water sprayed to prevent visible emissions from exceeding the applicable opacity limits. 7 II.B.4 Petroleum Products Transloading Requirements II.B.4.a The owner/operator shall not conduct any liquid petroleum product transloading operations after January 1, 2026. [R307-401-8] II.B.4.b The owner/operator shall not transload more than 4,380,000 barrels of all petroleum products combined per rolling 12-month period. [R307-401-8] II.B.4.b.1 The owner/operator shall: A. Determine the petroleum products throughput with truck scales B. Record the throughput of petroleum products each day C. Calculate a new 12-month total by the 20th day of each month using data from the previous 12 months D. Keep the petroleum products throughput records for all periods when the facility is in operation. [R307-401-8] II.B.4.c The owner/operator shall not transload any petroleum products with a true vapor pressure greater than 2.0 psia. [R307-401-8] II.B.4.c.1 The owner/operator shall keep and maintain records of true vapor pressures of all petroleum products transloaded on site. The records shall be kept for all periods when the facility is in operation. [R307-401-8] Status: In Compliance. This site has not transloaded crude oil since 2018, where 158,990 BBLs was transloaded. II.B.5 Vapor Balance and Carbon Capture Requirements II.B.5.a During rail car loading of petroleum products, the owner/operator shall rout vapors from the pressure balance lines to the vapor capture systems equipped with carbon capture barrels prior to venting to the atmosphere. [R307-401-8] II.B.5.b The owner/operator shall maintain the carbon canisters per the manufacture specifications and replace the carbon canisters using the colorimetric breakthrough detector in accordance with the manufacturer's recommendations. [R307-401-8] II.B.5.b.1 Records of each carbon canister replacement shall be kept on site for all times the plant is in operation. Canister replacement records shall record the date of replacement and the reason, and shall be kept in an operations log maintained by the operator. [R307-401-8] Status: In Compliance. Records were observed onsite showing that the carbon canisters were maintained and replaced as needed when crude oil was transloaded through the facility in 2018. The vapor capture system routed these emissions to the carbon canisters. 8 II.B.6 II.B.6.a II.B.6.a.1 II.B.6.b Magnesium Hydroxide and M-I WATE Transloading Requirements The owner/operator shall not transload more than the following: A. 12,000 tons of magnesium hydroxide per rolling 12-month period. B. 18,000 tons of M-I WATE per rolling 12-month period. The owner/operator shall: A. Determine the amount of magnesium hydroxide and M-I WATE transloaded with truck scales. B. Record the amount of magnesium hydroxide and M-I WATE transloaded each day. C. Calculate a new 12-month total by the 20th day of each month using data from the previous 12 months. D. Keep all records when the plant is in operation. The owner/operator shall use a baghouse to control air streams from the magnesium hydroxide and M-I WATE transloading operations. All air streams from these processes shall vent to the baghouse before being vented to the atmosphere. Status: Out of Compliance. Records reviewed revealed the following rolling 12-month throughput of M-I WATE (barite) to exceed the 18,000-ton limit: March 2023 - February 2024: 18,301.87 tons April 2023 - March 2024: 18,876.06 tons May 2023 - April 2024: 18,977.56 tons June 2023 - May 2024: 20,063.05 tons July 2023 - June 2024: 19,487.13 tons August 2023 - July 2024: 20,080.13 tons September 2023 - August 2024: 19,586.90 tons Magnesium hydroxide is currently not transloaded through this facility. II.B.7 Haul Road Requirements II.B.7.a The owner/operator shall prevent visible fugitive dust emissions from haul-road traffic and mobile equipment in operational areas from exceeding 20% opacity. [R307-205] II.B.7.a.1 Visible emissions determinations for fugitive sources shall use procedures similar to Method 9. The normal requirement for observations to be made at 15-second intervals over a six-minute period, however, shall not apply. Six points, distributed along the length of the haul road or in the operational area, shall be chosen by the Director or the Director's representative. An opacity reading shall be made at each point when a vehicle passes the selected points. Opacity readings shall be made at a point not less than one half the vehicle length behind the vehicle and not less than one half the height of the vehicle. The accumulated six readings shall be averaged for the compliance value. [R307-205] II.B.7.b The owner/operator shall water flush or broom sweep the paved haul roads as necessary to prevent visible emissions from exceeding the opacity limits listed in this AO. [R307-401-8] II.B.7.b.1 Records of water flushing and/or sweeping shall be kept for all periods when the plant is in operation. The records shall include the following items: 9 A. Date of water flushing and/or sweeping B. Number of sweeping and quantity of water used C. Rainfall received, if any, and approximate amount D. Time of day water flushing and/or sweeping were made E. Records of temperature if the temperature is below freezing. [R307-401-8] II.B.7.c The owner/operator shall water spray or chemically treat all unpaved roads and other unpaved operational areas that are used by mobile equipment to control fugitive dust. Water spray and chemical treatment shall be of sufficient frequency and quantity to prevent visible emissions from exceeding the opacity limits in this AO unless it is below freezing (32 degrees F). [R307-401-8] II.B.7.c.1 Records of water or chemical treatment shall be kept for all periods when the plant is in operation. The records shall include the following items: A. Date of treatment B. Number of treatments made, dilution ratio, and quantity C. Rainfall received, if any, and approximate amount D. Time of day treatments were made E. Records of temperature if the temperature is below freezing [R307-401-8] Status: In Compliance. During the time of inspection all haul roads appeared to be properly watered. No visible emissions were observed during the time of inspection. See attached haul road watering records. II.B.8 Emergency Generator Engine Requirements II.B.8.a The owner/operator shall only use diesel fuel (e.g. fuel oil #1, #2, or diesel fuel oil additives) as fuel in the emergency engine. [R307-401-8] II.B.8.a.1 The owner/operator shall only combust diesel fuel that meets the definition of ultra-low sulfur diesel (ULSD), which has a sulfur content of 15 ppm or less. [R307-401-8] II.B.8.b The owner/operator shall not operate the emergency generator engine on site for more than 100 hours per calendar year for maintenance checks and readiness testing. The emergency generator engine on site may be operated for up to 50 hours per calendrer year in non-emergency situations. Any operation in non-emergency situations shall be counted as part of the 100 hours per calendar year for maintenance and testing. There is no time limit on the use of the engine during emergencies. [40 CFR 63 Subpart ZZZZ, R307-401-8] 10 II.B.8.b.1 To determine compliance with a rolling 12-month total, the owner/operator shall calculate a new 12-month total by the 20th day of each month using data from the previous 12 months. Records documenting the operation of the emergency engine shall be kept in a log and shall include the following: A. The date the emergency engine was used B. The duration of operation in hours C. The reason for the emergency engine usage [40 CFR 63 Subpart ZZZZ, R307-401-8] II.B.8.b.2 To determine the duration of operation, the owner/operator shall install a non-resettable hour meter for the emergency engine. [40 CFR 63 Subpart ZZZZ, R307-401-8] II.B.8.b.3 To demonstrate compliance with the ULSD fuel requirement, the owner/operator shall maintain records of diesel fuel purchase invoices or obtain certification of sulfur content from the diesel fuel supplier. The diesel fuel purchase invoices shall indicate that the diesel fuel meets the ULSD requirements. [R307-401-8] Status: Not Applicable. The emergency diesel generator engine is no longer onsite. Section III: APPLICABLE FEDERAL REQUIREMENTS In addition to the requirements of this AO, all applicable provisions of the following federal programs have been found to apply to this installation. This AO in no way releases the owner or operator from any liability for compliance with all other applicable federal, state, and local regulations including UAC R307. 40 CFR Part 60 Subpart Y: Status: In Compliance. Records reviewed onsite show that Method 22 is conducted daily and if visible emissions are determined, Savage Energy Terminal has a policy to attempt to fix the source of the visible emissions and conduct a Method 9 observation that same day. This is in compliance with this subpart requiring a Method 9 to be conducted within 45 days if visible emissions are observed. Savage Energy Terminal stated that monthly visible observations of process and control equipment are conducted and that Method 9 is conducted at least once every 5 years. No visible emissions exceeding applicable limits were observed during the time of inspection. AREA SOURCE RULES EVALUATION: The following Area Source Rules were evaluated during this inspection: EMISSION INVENTORY: Listed below are the Actual Emissions Inventory provided from Savage Services Corporation – Savage Energy Terminal. A comparison of the estimated total potential emissions (PTE) on AO: DAQE-AN117930013-24, dated July 3, 2024, is provided. PTE are supplied for supplemental purposes only. 11 Criteria Pollutant PTE tons/yr Actuals tons/yr CO2 Equivalent 6305.00 Carbon Monoxide 3.88 .00001 Nitrogen Oxides 7.07 .00001 Particulate Matter - PM10 45.30 22.68 Particulate Matter - PM2.5 5.70 12 3. Sulfur Dioxide 0.28 .00001 Volatile Organic Compounds 70.23 .005 Hazardous Air Pollutant PTE lbs/yr Actuals lbs/yr Benzene (Including Benzene From Gasoline) (CAS #71432) 580 Hexane (CAS #110543) 10120 Toluene (CAS #108883) 200 Xylenes (Isomers And Mixture) (CAS #1330207) 50 PREVIOUS ENFORCEMENT ACTIONS: Compliance Advisory (DAQC-927-24) – September 17, 2024 COMPLIANCE STATUS & RECOMMENDATIONS: In regards to Approval Order (AO) DAQE-AN117930013-24, dated July 3, 2024, the overall status is: Out of Compliance. The M-I WATE (barite) throughput limit has been exceeded. A Compliance Advisory (DAQC-927-24) has been issued. HPV STATUS: Not Applicable. RECOMMENDATION FOR NEXT INSPECTION: None. NSR RECOMMENDATIONS: Savage Energy Terminal is currently reviewing if operations can operate within the M-I WATE limits or if a NOI will be submitted to increase the M-I WATE limits in the AO. ATTACHMENTS: Coal throughput records; M-I WATE (Barite) throughput records; Haul Road Water log Records June 2024 - August 2024 r Tons Shipped 2023 January February March April May June July August September October November December Stockpiling 2023 January February March April May June July August September October November December Monthly Total Cumulative Total 96,578.40 96,578.40 112,795.60 209,374.00 200,509.90 409,883.90 120,832.70 530,716.60 100.759.56 631,476.16 112,502.30 743,978.46 106,929.40 850,907.86 145,730.70 996,638.56 109,148.84 1,105,787.40 166,860.95 1,272,648.35 229,190.10 1,501,838.45 160,684.64 1,662,523.09 Monthly Total YTD Owed 147,079.64 80,339.79 82,332.12 23,806.87 47,817.97 68,193.20 187,494.69 173,919.58 227,021.63 273,429.78 229,248.51 305,680.77 _____ _ $ Payments Due 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 Payments Due $ $ $ $ $ $ $ $ $ $ $ $ ~ Tons Shipped 2024 January February March April May June July August September October November December Stockpiling 2024 January February March April May June July August September October November December Monthly Total Cumulative Total 76,172.70 76,172.70 200,438.88 276,611.58 87,877.48 364,489.06 97,077.87 461,566.93 57,231.60 518,798.53 171,822.40 690,620.93 690,620.93 690,620.93 690,620.93 690,620.93 690,620.93 690,620.93 Monthly Total YTD Owed 131,900.03 294,537.50 229,193.13 222,766.62 124,648.87 184,429.71 ~ I ~ Shipper productName Month Sum of Tons Shipper productNaMonth transfer Order Id Sum of Tons Average Tons Schlumberger Technology Corporation Barite March 650.02 Schlumberger Technology Corporation Barite March 650.02 32.50 April 1,409.36 April 1,409.36 28.19 May 1,107.34 May 1,107.34 29.93 June 2,750.62 June 2,750.62 30.23 July 1,679.41 July 1,679.41 27.99 August 2,277.41 August 2,277.41 27.44 September 1,250.45 September 1,250.45 29.77 October 1,496.37 October 1,496.37 29.93 November 1,329.37 November 1,329.37 29.54 December 1,569.42 December 1,569.42 29.61 Barite Total 15,519.76 Schlumberger Technology Corporation Total 15,519.76 29.23 Schlumberger Technology Corporation Total 15,519.76 Grand Total 15,519.76 29.23 Grand Total 15,519.76 Shipper productName Month Sum of Tons Shipper productNaMonth transfer Order Id Sum of Tons Average Tons Schlumberger Technology Corporation Barite January 1,921.94 Schlumberger Technology Corporation Barite January 1,921.94 27.46 February 860.17 February 860.17 29.66 March 1,224.21 March 1,224.21 29.15 April 1,510.86 April 1,510.86 29.62 May 2,192.83 May 2,192.83 29.24 June 2,174.69 June 2,174.69 28.24 July 2,272.42 July 2,272.42 29.51 August 1,784.18 August 1,784.18 29.74 Barite Total 13,941.29 Schlumberger Technology Corporation Total 13,941.29 28.98 Schlumberger Technology Corporation Total 13,941.29 Grand Total 13,941.29 28.98 Grand Total 13,941.29