HomeMy WebLinkAboutDDW-2024-012288Sanitary Survey - Deficiency Report
PWS Number:UTAH22006 Deficiency Points:110 Survey Date:09/19/2024
Survey Name:HOYTSVILLE PIPE WATER
CO
Surveyor:Rocky Pace
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS003 | SPRING CANYON SPRING #3
68. Is a spring box vent present? ... if yes, answer the following question(s)
Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect
to venting. Therefore, a junction or collection box requires a vent to be fitted with #14
mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or
covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Notes:
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS004 | HOYTSVILLE WELL
83. Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the
wellhead).
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a
check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth
nosed sampling tap being the first item from the well head and the shut-off valve as the
last item)
Notes:Has a sampling point, but it does have hose threads.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S023 NO SMOOTH NOSED SAMPLING TAP ON DISCHARGE PIPING
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST001 | EAST TANK
99. Roof or wall penetrations sealed
Rule: R309-545-6(1) and 545-9 Rule requires openings in a storage tank roof or top, designed to accommodate control
apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have
additional proper shielding to prevent vandalism. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
Notes:Cord going into the tank for the scada system has a large gap and needs to be filled/sealed
Deficiency Points: 100
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V017 STORAGE TANK SUBJECT TO CONTAMINATION DUE TO UNSEALED OPENINGS
ON TANK ROOF OR SIDEWALLS