Loading...
HomeMy WebLinkAboutDDW-2024-012165 September 27, 2024 Alan Packard Jordan Valley WCD 8215 S 1300 W West Jordan, Utah 84088 Dear Alan Packard: Subject: Public Drinking Water Requirements for Jordan Valley WCD,UTAH18027 According to the Division of Drinking Water’s records, Jordan Valley WCD is a Community water system that now serves a population of about 105,194 people. This population change results in the following changes to your systems sampling requirements as follows: Bacteriological Sampling The total number of bacteriological samples this system is now required to take has increased to 100 each month. It is still your responsibility to send a copy of all results to our office by the 10th of the following month. In the event of a coliform positive result, you are required to take three repeat samples and a triggered source E.coli sample for each ground water source in service at the time of the original positive sample. The system is required to submit an updated written sample site plan that identifies sampling sites and sample collection schedules that are representative of water throughout the distribution system. For any questions regarding the Total Coliform rule or Groundwater rule, contact Sitara Federico at (385) 515-1459 or sfederico@utah.gov. This new sample schedule will take effect on November 1st, 2024. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144830 • Salt Lake City, UT 84114-4830 Telephone (801) 536-4200 • Fax (801) 536-4211 • T.D.D. (801) 536-4284 www.deq.utah.gov Alan Packard Page 2 of 2 A current monitoring schedule for your system has been enclosed. If this letter is in error please contact me at (801) 641-6457 or mberger@utah.gov within 30 days. Thank you for your efforts in maintaining a safe drinking water system. Sincerely, Mark Berger Monitoring and Standards Section Manager Enclosure: Monitoring Schedule Revised Total Coliform Rule (RTCR) Sample Site Plan cc: Alan Packard, alanp@jvwcd.org Matthias Neville, Salt Lake County Health Department Sitara Federico Contacts Type: Administrative Contact Name: ALAN PACKARD Office: 801-565-4300 Emergency: Email: alanp@jvwcd.org shazellet@jvwcd.org Site Information Legal Contact: STRATFORD, MARK Address: 8215 S 1300 W , WEST JORDAN, UT 84088 Phone: 801-565-4300 County: SALT LAKE COUNTY System Type: Community Certification Required: D4 T4 Total Population: 105194 Local Health District: Salt Lake Valley Health Department Site Updates Last Inventory Update: 09/02/2024 Last Surveyor Update: 08/13/2024 Surveyor: DANIELLE ZEBELEAN Operating Period: 1/1 - 12/31 Last IPS Update: 09/09/2024 01:10:00 Political Districts Legislative District Map Water Usage Information per ERC Total Ips Points: 0 Public Water System Water Monitoring ReportDEQ | Drinking Water Jordan Valley Wcd PWS ID: UTAH18027 Rating: Approved 11/08/2018 Status: Active BACTERIOLOGICAL MONITORING Sample Count Type Frequency Schedule Begin Schedule End Analyte Name 80 Routine Monthly 04/01/2006 COLIFORM (TCR) DISINFECTION BYPRODUCT STAGE 2 MONITORING Sample Count Type Frequency Sample Label 8 Routine Quarterly UTAH18027 DS001 Sample ID below Sample ID Site Last Sampled Next Sample Due MD019 DS-13800 S PONY EXPR 07/09/2024 10/01/2024-12/31/2024 MD022 DS-6000 W 4700 S 07/09/2024 10/01/2024-12/31/2024 MD010 DS-3610 S 1000 W 07/09/2024 10/01/2024-12/31/2024 MD011 DS-10730 S 1300 E 07/09/2024 10/01/2024-12/31/2024 MR002 DS-13953 LOOKOUT PK 07/09/2024 10/01/2024-12/31/2024 MD018 DS-5700 W 10200 S BS 07/09/2024 10/01/2024-12/31/2024 MR001 DS-3700 W 2100 S 07/09/2024 10/01/2024-12/31/2024 MR004 DS-700 W 11400 S 07/09/2024 10/01/2024-12/31/2024 Sample during the following months: November, February, May, August OTHER DISTRIBUTION MONITORING Analyte Name ID Sample Count Type Frequency Last Sampled Next Sample Due LEAD AND COPPER DS001 30 Routine 3 Years 08/2022 06/01/2025-09/30/2025 ASBESTOS DS001 1 Routine 9 Years 08/2020 01/01/2029 - 12/31/2037 https://waterlink.utah.gov/reports.html?systemId=347 1/8 CHLORINE RESIDUAL MONITORING ID Facility Name Sample Count Type Frequency Last Sampled Next Sample Due DS001 UTAH18027 DISTRIBUTION SYSTEM 80 Routine Monthly -- https://waterlink.utah.gov/reports.html?systemId=347 2/8 MONITORING REQUIREMENTS BY FACILITY ID Name Facility Details RW002 COMBINED RAW WATER ENTERING JVWTP TP002 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due TOC AND ALKALINITY 1 Routine Monthly 06/20/2024 07/01/2024 - 07/31/2024 RW023 RAW WATER ENTERING SERWTP (TP023)Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due TOC AND ALKALINITY 1 Routine Monthly 06/20/2024 07/01/2024 - 07/31/2024 SS001 SAMPLING STATION - 3 22 27 28 30 45 53 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 01/07/2020 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 06/18/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 04/03/2023 01/01/2026-12/31/2028 RADS - COMPLIANCE 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 01/07/2020 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 SS002 SAMPLING STATION -10 31 36 38 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 NITRATE 1 Routine Yearly 07/10/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 07/10/2024 10/01/2024-12/31/2024 RADS - COMPLIANCE 1 Routine 9 Years 01/03/2017 01/01/2020 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 VOLATILE ORGANICS 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 SS003 SAMPLING STATION - 07 09 15 18 34 35 52 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 01/05/2021 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 06/18/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 07/08/2024 01/01/2026-12/31/2028 RADS - COMPLIANCE 1 Routine 6 Years 01/09/2023 01/01/2026 - 12/31/2031 SULFATE,SODIUM,TDS 1 Routine 9 Years 01/05/2021 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 05/17/2022 01/01/2023 - 12/31/2025 SS004 SAMPLING STATION -4 5 6 8 33 43 44 46 47 Hide Details https://waterlink.utah.gov/reports.html?systemId=347 3/8 ID Name Facility Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 02/25/2016 01/01/2020 - 12/31/2028 NITRATE 1 Routine Yearly 06/11/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 07/10/2023 07/01/2024-09/30/2024 RADS - COMPLIANCE 1 Routine 6 Years 01/09/2023 01/01/2029 - 12/31/2034 SULFATE,SODIUM,TDS 1 Routine 9 Years 02/25/2016 01/01/2020 - 12/31/2028 VOLATILE ORGANICS 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 SS005 SAMPLING STATION - 19 40 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 01/07/2020 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 07/10/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 04/04/2022 01/01/2023-12/31/2025 RADS - COMPLIANCE 1 Routine 6 Years 01/08/2019 01/01/2023 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 01/07/2020 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 01/09/2023 01/01/2026 - 12/31/2028 SS006 SAMPLING STATION - 11 32 39 42 69 Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 9 Years 07/10/2019 01/01/2020 - 12/31/2028 NITRATE 1 Routine Yearly 01/02/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 06/12/2023 01/01/2026-12/31/2028 RADS - COMPLIANCE 1 Routine 3 Years 01/12/2023 01/01/2026 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 07/10/2019 01/01/2020 - 12/31/2028 VOLATILE ORGANICS 1 Routine 3 Years 06/12/2023 01/01/2026 - 12/31/2028 TP001 SWGWTP Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine Yearly 01/17/2024 01/01/2025 - 12/31/2025 NITRATE 1 Routine Yearly 01/17/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 04/04/2023 01/01/2026-12/31/2028 RADS - COMPLIANCE 1 Routine 6 Years 01/05/2021 01/01/2026 - 12/31/2031 SULFATE,SODIUM,TDS 1 Routine Yearly 01/17/2024 01/01/2025 - 12/31/2025 VOLATILE ORGANICS 1 Routine 3 Years 01/04/2023 01/01/2024 - 12/31/2026 TP002 JVWTP Hide Details https://waterlink.utah.gov/reports.html?systemId=347 4/8 ¹To fulfill the two pesticide sample requirements, systems are to submit the second pesticide sample in the quarter following the quarter in which the first sample was collected. ID Name Facility Details Name Sample Required Type Frequency Last Sample Next Sample Due CARBON, TOTAL 1 Routine Monthly 06/20/2024 07/01/2024 - 07/31/2024 CHLORINE DIOXIDE 1 Routine Daily 05/01/2023 - 05/01/2023 INORGANICS & METALS 1 Routine 9 Years 03/17/2020 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 01/10/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 04/04/2023 01/01/2026-12/31/2028 RADS - COMPLIANCE 1 Routine 9 Years 04/09/2018 01/01/2020 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 03/17/2020 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 01/05/2022 01/01/2023 - 12/31/2025 TP023 SERWTP Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due CARBON, TOTAL 1 Routine Monthly 06/20/2024 07/01/2024 - 07/31/2024 INORGANICS & METALS 1 Routine 9 Years 01/07/2020 01/01/2029 - 12/31/2037 NITRATE 1 Routine Yearly 01/10/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 04/04/2023 01/01/2026-12/31/2028 RADS - COMPLIANCE 1 Routine 9 Years 01/03/2018 01/01/2020 - 12/31/2028 SULFATE,SODIUM,TDS 1 Routine 9 Years 01/07/2020 01/01/2029 - 12/31/2037 VOLATILE ORGANICS 1 Routine 3 Years 01/05/2022 01/01/2023 - 12/31/2025 WS025 1510 W 14600 S WELL Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due INORGANICS & METALS 1 Routine 3 Years 07/22/2019 01/01/2020 - 12/31/2022 NITRATE 1 Routine Yearly 07/15/2024 01/01/2025 - 12/31/2025 PESTICIDES¹2 Routine 3 Years 12/15/2022 01/01/2023-12/31/2025 RADS - COMPLIANCE 1 Routine 3 Years 12/15/2022 01/01/2023 - 12/31/2025 SULFATE,SODIUM,TDS 1 Routine 3 Years 12/15/2022 01/01/2023 - 12/31/2025 VOLATILE ORGANICS 1 Routine 3 Years 12/15/2022 01/01/2023 - 12/31/2025 WS032 1100 E 4500 S WELL Hide Details Name Sample Required Type Frequency Last Sample Next Sample Due VOLATILE ORGANICS 1 Routine Yearly 01/02/2024 01/01/2025 - 12/31/2025 https://waterlink.utah.gov/reports.html?systemId=347 5/8 GROUPED SOURCE SAMPLING STATIONS Sample Group ID Sample Group Facility Details 8166.0 UTAH SAMPLING STATION SS001 View Details 8031.0 UTAH SAMPLING STATION SS002 View Details 8032.0 UTAH SAMPLING STATION SS003 View Details 8331.0 UTAH SAMPLING STATION SS004 View Details 8220.0 UTAH SAMPLING STATION SS005 View Details 8332.0 UTAH SAMPLING STATION SS006 View Details https://waterlink.utah.gov/reports.html?systemId=347 6/8 OPEN COMPLIANCE SCHEDULES Type Required Activities Severity Created Due Lead Copper Rule Revisions COMPLETE INITIAL LSL INVENTORY 12/16/2021 10/16/2024 Lead Copper Rule Revisions SUBMIT LEAD SERVICE LINE INVENTORY 12/16/2021 10/16/2024 Physical deficiency schedule END OF AIR RELEASE VACUUM RELIEF VALVE PIPING LACKS NO. 14 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule END OF AIR RELEASE VACUUM RELIEF VALVE PIPING LACKS NO. 14 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule END OF WELL PUMP-TO-WASTE LINE LACKS NO. 4 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule WELL LACKS THE REQUIRED WELL SEAL SIG 08/21/2024 12/19/2024 Physical deficiency schedule WELL CASING VENT IS NOT DOWNTURNED SIG 08/21/2024 12/19/2024 Physical deficiency schedule END OF WELL PUMP-TO-WASTE LINE LACKS NO. 4 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule PUMP STATION OR HYDROPNEUMATIC TANK A/V VALVE RELIEF PIPING LACKS NO. 14 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule PUMP STATION OR HYDROPNEUMATIC TANK A/V VALVE RELIEF PIPING LACKS NO. 14 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule A/V VALVE RELIEF PIPING OF PUMP STATION OR HYDROPNEUMATIC TANK NOT PROTECTED FROM CONTAMINATION OR NOT AT LEAST 6 INCHES ABOVE FLOOR SIG 08/21/2024 12/19/2024 https://waterlink.utah.gov/reports.html?systemId=347 7/8 Type Required Activities Severity Created Due Physical deficiency schedule PUMP STATION OR HYDROPNEUMATIC TANK A/V VALVE RELIEF PIPING LACKS NO. 14 SCREEN SIG 08/21/2024 12/19/2024 Physical deficiency schedule MEDIA DEPTHS NOT MEETING REQUIREMENTS SIG 08/21/2024 12/19/2024 https://waterlink.utah.gov/reports.html?systemId=347 8/8 Utah Division of Drinking Water Bacteriological Sample Site Plan All public water systems are required under the Revised Total Coliform Rule (RTCR) to submit a Bacteriological Sample Site Plan. The purpose of the wrien sample site plan is to ensure the collecon of samples from points in the distribuon system that best represent the quality of water served to customers, to idenfy repeat sampling locaons, and to establish a sampling schedule. What to include in the plan: 1. The following should be submied for the Bacteriological Sample Site Plan: a. The plan must include a MAP of the distribuon system. Excepons are small systems such as restaurants, schools, office buildings, and some small industries. b. Bacteriological Sample Site Plan form. 2. The map should show locaons of all distribuon lines, sources, treatment, storage tanks and sampling sites. Idenfy each sampling site by street address and a numeric point code. Give a brief descripon of the site. For example: 201 Main Street, 1. DS001, outside house tap, or Maintenance Facility, 1. DS001, men’s restroom sink. The sampling site Numeric Point Code should begin with the number 1 and then connue in sequenal numeric order. Use the numeric point code, along with DS001, when subming samples to the laboratory. 3. Locate sample sites so they represent all areas of the distribuon system. You may wish to include comments on your plan showing the reason(s) for selecng each site. Such as populaon density, industrial areas, pressures zones, areas vulnerable to potenal contaminaon, dead-end lines, and purchased source entry points. Alternate sampling locaons through different locaons of the water system. 4. Do NOT indicate the raw water tap or sources as sampling sites for roune or repeat coliform samples. These are “triggered source” sampling locaons under the Groundwater Rule (GWR). Indicate the associated source (by DDW assigned source codes) for each sample locaon. For example: “WS001”, “WS002 and WS004”, or “All Sources” supply this specific locaon. 5. Include the locaon for “Repeat” sample sites. Repeat samples must be collected at the following locaons within 24 hours of a total coliform or E coli posive sample: - The tap where the original posive coliform sample was collected, - A tap within five (5) service connecons upstream, and - A tap within five (5) service connecons downstream. 6. Alternave fixed repeat locaons may be idenfied at locaons that best verify and determine the extent of potenal contaminaon in the distribuon system based on a specific situaon. 7. For system with only one or two service connecons (suitable sampling taps), collect all three repeat samples in one day from the limited number of sampling taps. The sample site plan should show which taps(s) are in use for mulple samples. 8. The number of roune coliform samples collected each month is based on the populaon of the water system. For a table indicang the number of samples required see Secon R309-210-5. 9. Include a schedule for selecon of the samples. Systems using only groundwater and serving less than 4,900 people (five samples required per month or fewer) may collect all required sample on a single day. Systems with greater than five samples per month must collect a poron of the samples at regular intervals throughout the month with the total number being the number required. revised 2/3/2021 S UBMITTAL Mail the completed form to: Or Email: Division of Drinking water An: Sitara Federico 195 N 1950 W PO BOX 144830 Salt lake City, UT 84114 DDWREPORTS@UTAH.GOV This applicaon and related environmental informaon are available online: DrinkingWater.utah.gov revised 2/3/2021 Bacteriological Sample Site Plan B ASIC W ATER S YSTEM I NFO Water System Name: Water System #: S ITE S ELECTION I NFO Monthly Roune Sample Sites (mark an “X” in boxes below): Follow-up/Repeat Sample (range or specific address) DDW Assigned # for Associated Roune Sample Point Descripon (horse bib, sink faucet, etc.) Address Point ID JA N FE B MA R AP R MA Y JU N JU L AU G SE P OC T NO V DE C 1-DS00 1 Down Up 2-DS00 1 Down Up 3-DS00 1 Down Up 4-DS00 1 Down Up 5-DS00 1 Down Up 6-DS00 1 Down Up S OURCE INFO C ERTIFICATION Samples Collected by: Plan Submitted by: Date Submitted: revised 2/3/2021 Source(s) Name: DDW Source or Group # Bacteria Sampling Laboratory Information: Laboratory: Address: City: Zip Code: Phone Number: Contact Name: _______________________________________ ____ _______________________________________ ____ _______________________________________ ____ _______________________________________ ____ _______________________________________ ____ _______________________________________ ____ _______________________________________ ____