Loading...
HomeMy WebLinkAboutDDW-2024-012141Sanitary Survey - Deficiency Report PWS Number:UTAH18183 Deficiency Points:55 Survey Date:09/30/2024 Survey Name:MUIRHOUSE HOMEOWNERS ASSOCIATION Surveyor:Ryan Taggart Sanitary Survey Category: TR SDWIS Severity Code: Minor Deficiency Management and Operations | DS001 | UTAH18183 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-7, 8 & 18, R309-100 through 605 Trigger for regulatory followup to address concerns. Notes: Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: TGR9 TRIGGER FOR REGULATORY FOLLOWUP TO ADDRESS CONCERNS Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH18183 DISTRIBUTION SYSTEM 32. Legally adopted authority statement Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). Notes:Follow up needed Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M003 CCC-LACKS LOCAL AUTHORITY Sanitary Survey Category: DS SDWIS Severity Code: Recommendation Distribution | DS001 | UTAH18183 DISTRIBUTION SYSTEM 42. Water system has a program to maintain, operate, or control the use of fire hydrants. Rule: N/A Fire hydrants provide a direct access to the water in the distribution system. In order to protect the quality and integrity of the water, fire hydrant access should be controlled. Notes:Follow up needed Deficiency Points: 0 Days until points become effective on IPS: 0 SDWIS Deficiency Description: D012 FIRE HYDRANT USE POLICY INADEQUATE Sanitary Survey Category: MR SDWIS Severity Code: Significant Deficiency General Disinfection | DS001 | UTAH18183 DISTRIBUTION SYSTEM 48. Water system follows AWWA disinfection procedures for new, repaired, or seasonal water mains and tanks. Rule: R309-550-8(10)All new and repaired water mains and appurtenances shall be disinfected in accordance with AWWA Standard C651. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Follow up needed Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: D018 FAIL TO FOLLOW AWWA C651 FOR WATER LINE DISINFECTION