Loading...
HomeMy WebLinkAboutDDW-2024-012101Sanitary Survey - Deficiency Report PWS Number:UTAH21010 Deficiency Points:60 Survey Date:10/11/2024 Survey Name:KOOSHAREM Surveyor:Jason Bagley Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH21010 DISTRIBUTION SYSTEM 38. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. Notes:no detailed records Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH21010 DISTRIBUTION SYSTEM 39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:no detailed records Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: SO SDWIS Severity Code: Significant Deficiency Springs | WS001 | BROWNS SPRING 65B. Spring box lid is gasketed Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Needs new gasket Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | BROWNS SPRING 66. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes:Spring box doesn't have a vent Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING