HomeMy WebLinkAboutDDW-2024-012101Sanitary Survey - Deficiency Report
PWS Number:UTAH21010 Deficiency Points:60 Survey Date:10/11/2024
Survey Name:KOOSHAREM Surveyor:Jason Bagley
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH21010 DISTRIBUTION SYSTEM
38. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps
installed within the system)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes written records of cross connection control activities.
Notes:no detailed records
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH21010 DISTRIBUTION SYSTEM
39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:no detailed records
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | BROWNS SPRING
65B. Spring box lid is gasketed
Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished
with a gasket between the lid and frame. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:Needs new gasket
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | BROWNS SPRING
66. Is a spring box vent present? ... if yes, answer the following question(s)
Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect
to venting. Therefore, a junction or collection box requires a vent to be fitted with #14
mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or
covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Notes:Spring box doesn't have a vent
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING