Loading...
HomeMy WebLinkAboutDDW-2024-012097Utah Department Of Environmental Quality Division Of Drinking Water Sanitary Survey Sanitary Survey General System Information Exception Granted: R309-510-11(3) | The original exception to rules R309-550-11(3), R309-540-5(4)(c), and R309-105-9(3) for Lots 146A and 146B in the Colony Subdivision was originally requested in August 2018. The project was placed on hold in October 2018. The project was reopened and an exception was granted on January 18, 2022 for only Lot 146A. At this time Mountain Regional is requesting the exception to Lot 146B. These are the only two lots which will require individual home booster pumps, Mountain Regional Water SSD does not anticipate any other similar facilities needing exceptions in the future. Lot 146A is still unconstructed at the time of this letter. However, the exception is due for a renewal at the end of this year. The renewal is also included in this letter. The original exception details are included in the later Dated January 18, 2022. Both lots share a similar design for the home booster pump. Except for the Lot 146A is located in a room attached to the main building and Lot 146B is located in a separate building. Further, Lot 146A has two 5,000-gallon tanks where Lot 146B has one 5,000-gallon tank. The properties are located within Mountain Regional Water SSD’s service area and pressure zone, however after hydraulic analysis it was found that the minimum pressures required per rule R309-105-9(2) cannot be met due to the lots’ high elevation. Fire protection can be provided by a fire hydrant and is approved by the Park City Fire District. Exception Granted: R309-550-11(3), R309-540-5(4)(c), and R309-105-9(3) | Mountain Regional Water SSD (the District) previously requested an exception for Rule R309-550-11(3), R309-540-5(4)(c), and R309-105-9(3) for two lots, Lots 146A and 146B on August 21, 2018. The Division provided review comments for the request at the time for the two lots on August 28, 2021. The District placed then placed the exception request on hold on October 11, 2018. These lots are located within Mountain Regional Water SSD’s service area and pressure zone. The water system conducted a hydraulic analysis showing that the service pressure at this base elevation would be below the required minimum pressures per R309- 105-9(2). The District is currently looking for the exception of Lost 146A at this time. With these properties being located within the water system’s service area and pressure zone, an individual home booster pump is necessary to provide the required minimum pressures to this residence. Fire protection can be provided by a fire hydrant located at the end of the cul-de-sac near the properties. The homeowners are willing to provide the means necessary to show that installation of an individual home booster pump will not jeopardize public health. The proposed design calls for installation of an interim tank downstream of the service meter, where the individual home booster pump draws water from, and an approved backflow prevention assembly downstream of the service meter prior to the inlet of the interim tank. Exception Granted: R309-550-7(1) | There are two points of exception to the minimum separation rules associated with this project. There are two points of crossing where the water must cross under existing sewer and approximately 130 linear feet where only a horizontal distance of 6 feet can met. The two crossings are located on Cedar Lane Drive in Park City, UT where the new waterline must cross under existing gravity sewer. For 130 linear feet of water line located on Red Pine Road, between Comanche Trail and Chalet Drive where the minimum horizontal distance of 6 feet and a minimum vertical clearance of 18 inches will be met due to smaller utility Right of Ways in the area. Exception Granted: R309-550-7 | The request for an exception to R 309-550-7 is for two locations within The Colony at White Pine Phase 48 project where the sewer and water mains are less than ten feet apart horizontally. The first instance is due to the close proximity to a 12-foot diameter culvert under Road l. The water Site Visit Date Surveyor Name 09/12/2024 Hunter Payne MOUNTAIN REGIONAL WATER SSD PWS ID: UTAH22137 Rating: Approved 03/28/2005 Active DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 1 of 196 and sewer main are closer together to maintain the sufficient clearance both above the culvert, to lessen freezing potential, and below the road, to allow adequate cover over the pipe. In the second instance, the water and sewer mains are on very steep terrain and in the attempt to limit the bending radius of tlle HDPE pipe to cross a 48-inch diameter creek, a lack of horizontal separation resulted. 1 Admin Contact (AC) [ eMail address is REQUIRED ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: ANDY *Last Name: GARLAND *Organization: *Address: Redacted *City: PARK CITY *State: UT *Zip: 84098 *Email: agarland@mtregional.org *Phone: 435-940-1916 2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: ANDY *Last Name: GARLAND *Organization: *Address: PO BOX 982320 *City: PARK CITY *State: UT *Zip: 84098 *Email: agarland@mtregional.org *Phone: 435-940-1916 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 2 of 196 3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: MOUNTAIN REGIONAL WATER SSD *Address: PO BOX 982320 *City: PARK CITY *State: UT *Zip: 84098 *Email: agarland@mtregional.org *Phone: 435-940-1916 Emergency Phone: 435-645-2555 4 Direct Operator in Charge (DO) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: BRIAN *Last Name: DAVENPORT *Organization: *Address: PO BOX 982320 *City: PARK CITY *State: UT *Zip: 84092 *Email: brian@mtregional.org *Phone: 435-940-1916 5 Does the system serve a Residential population?Y 5A Population - Residential 8245 5B Operating Period (Start Date) - Residential 01/01 5C Operating Period (End Date) - Residential 12/31 6 Does the system serve a Transient population? (A transient population is a rotating population that is served by a water system that does not remain in the jurisdiction of the water system for long periods of time. Examples of a transient population include, but are not limited to, campers at a campground, users of a highway rest stop, skiers at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.) N 7 Does the system serve a Non-Transient population? (A non-transient population is a population served by a water system that is the same population being served by the system for at least six months of the year, but is not a resident in the system. Examples of a non-transient population include, but are not limited to, employees of a restaurant, shop, or ski resort; teachers and students at a school, day-care center, or church; doctors, nurses, and other employees at a hospital or healthcare clinic.) N 8 Population - Wholesale :0 9 Residential Connections:5540 10 Commercial Connections:317 11 Industrial Connections:0 12 Agricultural Connections:0 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 3 of 196 Site Visit Info Management and Operations 13 Date of Survey (First Day of Field Work)09/11/2024 14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the header ** 09/12/2024 15 Date final report sent to system (questionnaire, deficiency report and capacity spreadsheet) 10/11/2024 16 Water system representative present during the survey:Brian Davenport 17 How much time was spent to prepare survey documents prior to field survey? (Round up to nearest quarter hour) 2 18 How much time was spent to complete the field survey (arrival to completion; include travel time between water system facilities)? (Round up to nearest quarter hour) 22 (Notes: Total hours between three DDW surveyors over the course of two days.) 19 How much time was spent traveling from the office to system and back again at the end of the field survey? (Round up to nearest quarter hour) 4 (Notes: Over two days.) 20 How much time did it take to finish the Survey Report? (Round up to nearest quarter hour) 6 21 Did you survey multiple water systems in one trip? ... if yes, answer the following question(s) N 22 For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power option. SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system without naturally flowing water sources, such as springs or flowing wells, to have one or more of the system's sources equipped for operation during power outages. To ensure continuous service when the primary power has been interrupted, a redundant power supply is required. A redundant power supply may include a transfer switch for auxiliary power such as a generator or a power supply service with coverage from two independent substations. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 23 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a different question] SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 4 of 196 24 Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? Exception Granted: R309-510-11(3) | The original exception to rules R309-550-11(3), R309-540-5(4)(c), and R309-105-9(3) for Lots 146A and 146B in the Colony Subdivision was originally requested in August 2018. The project was placed on hold in October 2018. The project was reopened and an exception was granted on January 18, 2022 for only Lot 146A. At this time Mountain Regional is requesting the exception to Lot 146B. These are the only two lots which will require individual home booster pumps, Mountain Regional Water SSD does not anticipate any other similar facilities needing exceptions in the future. Lot 146A is still unconstructed at the time of this letter. However, the exception is due for a renewal at the end of this year. The renewal is also included in this letter. The original exception details are included in the later Dated January 18, 2022. Both lots share a similar design for the home booster pump. Except for the Lot 146A is located in a room attached to the main building and Lot 146B is located in a separate building. Further, Lot 146A has two 5,000-gallon tanks where Lot 146B has one 5,000-gallon tank. The properties are located within Mountain Regional Water SSD’s service area and pressure zone, however after hydraulic analysis it was found that the minimum pressures required per rule R309-105-9(2) cannot be met due to the lots’ high elevation. Fire protection can be provided by a fire hydrant and is approved by the Park City Fire District. SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3) C (Notes: System has exceptions from DDW for home booster pumps.) 25 Does the system haul water?N 26 For a community system serving 100 or more connections, at least 2 water sources are available. SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems serving more than 100 connections to have a minimum of two sources except where served by a water treatment plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 27 Does system have a consecutive connection to another water system not listed in the SOURCE section of Waterlink Report? If yes, answer the following question(s) N 28 Does the system have a deficiency meeting the required source capacity? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 29 Does the system have a deficiency meeting the required storage capacity DUE SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 30 Does the system have a deficiency meeting the required equalization storage capacity for indoor/outdoor demands (but not because of fire suppression needs)? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 31 Does your water system have an Emergency Response Plan? REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 5 of 196 Cross Connection and Operator Certification 32 Does your Emergency Response Plan address cybersecurity? (required for systems over 3,300 population) MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. Y 33 Does your water system use any computers, laptops, phones, tablets, or any other computer systems to manage, operate, or maintain the PWS (SCADA or Industrial Control Systems)? This includes any water sources, treatment, distribution or any process related to operation function Y 34 Does your water system use any computer systems in regular business operations such as accounting, billing, payroll, human resources, or management? Y 35 Legally adopted authority statement MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). C 36 Documentation of annual public awareness and/or employee training MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. C 37 Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. C 38 Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. C 39 Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. C 40 Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every community and NTNC water system and public water systems that utilize treatment/filtration to have at least one operator certified at the classified grade of the water system. Certification must be appropriate for the type of system operated (treatment and/or distribution). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 6 of 196 General Maintenance and Environment Distribution 41 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1 hour travel time, under normal work and home conditions, of each drinking water system for which he is considered in direct responsible charge. C 42 Are there any visual indications of unsanitary conditions? SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The Secondary Maximum Contaminant Levels for public water systems deals with substances which affect the aesthetic quality of drinking water. They are presented here as recommended limits or ranges and are not grounds for rejection. The taste of water may be unpleasant and the usefulness of the water may be impaired if these standards are significantly exceeded. R309-105-18 The Director or the local health department shall be informed by telephone by a water supplier of any "emergency situation". The term "emergency situation... R309-215-4(3) If the water fails to meet minimum standards, then certain public notification procedures shall be carried out, as outlined in R309-220. Water suppliers shall also keep analytical records in their possession, for a required length of time, as outlined in R309-105-17. C 43 No unprotected connection between the distribution system and a source of contamination. (If there is an unprotected connection, describe the location in detail.) SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11) C 44 Are air release/vacuum valves in the distribution system? ... if yes, answer the following question(s) Y 44A Open end of vent line covered with #14 mesh screen SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 44B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or one foot above distribution line in a chamber that does not flood. SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 7 of 196 44C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or sump pump. SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be provided with a drain to daylight, if possible. Where this is not possible, underground gravel-filled absorption pits may be used if the site is not subject to flooding and conditions will assure adequate drainage. Sump pumps may also be considered if a drain to daylight or absorption pit is not feasible. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 44D Open end of vent line down-turned. SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 45 Water system has a program to maintain, operate, or control the use of fire hydrants. REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the distribution system. In order to protect the quality and integrity of the water, fire hydrant access should be controlled. C 46 Blow offs or air release valves are not directly connected to a sanitary sewer line. SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states blow-offs or air relief valves shall not be connected directly to a sewer. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 47 Blow offs or air release valves do not discharge below flood level in ditches or streams. SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3) C 48 All water mains installed after 1995 that provide fire flow are at least 8 inches in diameter. MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis indicates that required flow and pressures can be maintained by 6-inch lines. C 49 Distribution system capable of providing minimum pressure of 20 psi at all service connections. SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution system shall maintain minimum pressures as required by R309-105-9 at all points of connection under all flow conditions. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 50 Was the water system constructed or new portions added after January 1, 2007? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 8 of 196 General Disinfection ST001 - SUMMIT PARK TANK 1 - Inactive (RL - REPLACED) ST005 - TIMBERLINE STORAGE #1 (ABANDONED) - Inactive (AB - ABANDONED) ST025 - AIR BREAK TANK - Inactive (AB - ABANDONED) TP002 - AVAILABLE FOR FUTURE CHLORINATOR ENTRY - Inactive (AB - ABANDONED) WS006 - GRAYHAWK WELL 2 - Inactive (AB - ABANDONED) WS007 - SPRING CREEK WELL 1 - Inactive (AB - ABANDONED) WS011 - BLACKHAWK WELL 1R - Inactive (AB - ABANDONED) 50A Distribution system capable of maintaining the following pressures at all service connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless otherwise specifically approved by the Director, public water systems constructed after January 1, 2007, shall be designed and shall meet the following minimum water pressures at points of connection: (a) 20 psi during conditions of fire flow and fire demand experienced during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 51 Water system follows AWWA disinfection procedures for new, repaired, or seasonal water mains and tanks. SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and appurtenances shall be disinfected in accordance with AWWA Standard C651. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 52 How often do you periodically disinfect any or all parts of your water system (i.e. batch disinfection) other than for repairs or maintenance? SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of Engineering Plans and Specifications R309-500-6 Plan Approval Procedure. C 53 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 54 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 55 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 56 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 57 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 58 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 9 of 196 WS017 - SUMMIT PARK WELL 4 - Inactive (AB - ABANDONED) WS020 - SUMMIT PARK WELL 8 - Inactive (AB - ABANDONED) WS023 - SIGNAL HILL WELL - Inactive (AB - ABANDONED) TP019 - WELL 7 AND 8 GAS CHLORINATOR - Proposed WS032 - AVAILABLE FOR FUTURE SOURCE ENTRY - Proposed Source WS012 - SPRING CREEK SPRING - 59 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 60 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 61 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 62 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N 64 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 64A When is the anticipated date to request an Operating Permit? Explain in comments...Project has been cancelled. 63 Is this source in operation without an Operating Permit? SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 63A When is the anticipated date to request an Operating Permit? Explain in comments...This facility was created in SDWIS by mistake in 2020 and is not being held for use as the next source the system develops. 65 Is this facility Active or Inactive? (Active status means used on a routine/seasonal basis without long periods of inactivity and water quality samples are routinely collected)) I 65A Explain why this facility is Inactive (Is this facility in stand-by mode and not used regularly, has not been used for multiple years, does it have known water quality concerns?) Spring was determined to be UDI and has been turned out for the time being. 66 Operating Period (Start Date)01/01 67 Operating Period (End Date)12/31 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 10 of 196 68 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 69 Area of equal or higher elevation within 50 feet of spring collection devices is fenced. MIN | 15pts | SO | SS02 | R309-515-7(7)(e) | Rule requires a stock-tight fence around the spring collection area. C 70 Surface water runoff diverted away from spring by diversion channel or berm. MIN | 15pts | SO | SS03 | R309-515-7(7)(g) | Rule requires a diversion channel or berm, constructed immediately inside the fenced area, capable of diverting all anticipated surface water runoff away from the spring collection area. C 71 Spring box has a means to release overflow? MIN | 15pts | SO | SS23 | R309-515-7(7)(d), R309-545-13(1) | All junction boxes and collection boxes, must comply with R309-545 with respect to access openings, venting, and tank overflow. Lids for these spring boxes shall be gasketed and the box adequately vented. Y 71A Overflow screened with #4 mesh screen SIG | 25pts | SO | SS04 | R309-515-7(7)(d), R309-545-13(3) | Overflow pipes on junction and collection boxes shall comply with R309-545 and be screened with No. 4 mesh non-corrodible screens. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 71B Overflow has a minimum of 12 inch clearance above flood rim of receiving basin SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction and collection boxes shall comply with R309-545 and discharge a minimum of 12 inches above the ground surface or rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72 Drain has minimum of 12 inch clearance above flood rim of receiving basin SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction and collection boxes shall comply with R309-545 and discharge a minimum of 12 inches above the ground surface or rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 73 Spring collection area graded and no evidence of water ponding or flow on surface? SIG | 25pts | SO | SS06 | R309-515-7(7)(i) | Rule requires the spring to be developed as thoroughly as possible to minimize the possibility of excess water ponding within the collection area. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 11 of 196 74 If a liner is present, spring liner integrity is maintained. SIG | 50pts | SO | SS19 | R309-515-7(7)(b)(iv) | If a liner is present, it shall be installed to assure its integrity. No sharp-edged stones or stones two inches or larger shall be located within two inches of the liner. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 75 No deep-rooted vegetation is within the 50 ft collection area. SIG | 25pts | SO | SS07 | R309-515-7(7)(f) | All deep-rooted vegetation within the fenced collection area shall be removed by a means not negatively affecting water quality. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 76 No roots seen in collection boxes and junctions. SIG | 25pts | SO | SS08 | R309-105-10(4)(a), R309-515-8(1)(a) | Spring collection areas shall be periodically (preferably annually) cleared of deep-rooted vegetation to prevent root growth from clogging collection lines. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 77 Is a spring collection box present? ... if yes, answer the following question(s) MIN | 5pts | SO | L014 | R309-515-7(7)(c) | Rule requires each spring collection area to be provided with at least one collection box to permit spring inspection and testing. Y 77A Spring box has shoe box type lid with 2 inch overlap around frame SIG | 25pts | SO | SS09 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall comply with R309-545 and be provided with a close-fitting, solid shoebox-type cover that extends down around the frame at least 2 inches. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 77B Spring box lid is gasketed SIG | 25pts | SO | SS10 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall comply with R309-545 and be provided with a cover furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 77C Spring box lid does not show evidence of a vacuum. MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. C 77D Spring box opening is at least 4 inches above the surface of the box or 18 inches above an earthen cover if the box is buried. MIN | 15pts | SO | SS12 | R309-515-7(7)(d), R309-545-14 (1), | Access openings shall comply with R309-545 and be framed at least 4 inches above the surface of the spring box roof at the opening or 18 inches above the ground surface on a buried spring box. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 12 of 196 77E Spring box lid is locked SIG | 25pts | SO | SS13 | R309-515-7(7)(d), R309-545-14 (3) | Access openings shall comply with R309-545 and the lids to the openings shall be locked. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 77F All openings/penetrations in the spring collection box are sealed. SIG | 50pts | SO | SS20 | R309-515-7(7)(d), R309-545-9(1) and (2) | All junction and collection boxes shall comply with R309-545 and shall have suitable watertight roofs and sidewalls that exclude birds, animals, insects, and excessive dust. All openings shall be kept to a minimum and be watertight. Pipes that may contain water of lesser quality than drinking water shall not penetrate the spring box. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 78 Is a spring box vent present? ... if yes, answer the following question(s) MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Y 78A Vent is down-turned. SIG | 25pts | SO | SS16 | R309-515-7(7)(d), R309-545-15(1) | All vents on junction and collection boxes shall comply with R309-545 and be downturned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 78B Vent has #14 or finer non-corrodible mesh screen and a protective screen/covering if 6-inch diameter or greater. SIG | 25pts | SO | SS17 | R309-515-7(7)(d), R309-545-15(4) and (5) | All vents on junction and collection boxes shall comply with R309-545 and be fitted with No. 14 or finer non-corrodible mesh screen. Vents 6-inch diameter or larger shall be fitted with additional heavy gage screen or substantial covering to protect the No. 14 mesh screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 78C End of vent has sufficient clearance to prevent ice/snow blockage or is at least 24 inches above the earthen cover SIG | 25pts | SO | SS18 | R309-515-7(7)(d), R309-545-15(2) and (3) | All vents on junction and collection boxes shall comply with R309-545 and shall be located and sized to avoid blockage during winter. The end of a vent on a buried spring box shall discharge a minimum of 24 inches above the ground. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 13 of 196 WS001 - ATKINSON WELL 2 - Active 79 Spring has a permanent flow-measuring device. MIN | 5pts | SO | SS01 | R309-515-7(7)(h) | Rule requires a spring to have a permanent flow measuring device. C 80 Is this facility Active or Inactive?A 81 Operating Period (Start Date)01/01 82 Operating Period (Ending Date)12/31 83 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 84 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 85 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 86 Is the well casing vented? ... if yes, answer the following question(s)N 87 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 87A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 87B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 14 of 196 87C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 88 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 89 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 90 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 91 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 92 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 93 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 94 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 15 of 196 WS002 - JAILHOUSE WELL 3 - Active 95 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 96 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 97 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 98 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 99 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 100 Does well require oil-lubrication?N 101 Is this facility Active or Inactive?A 102 Operating Period (Start Date)01/01 103 Operating Period (Ending Date)12/31 104 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 105 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 16 of 196 106 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 107 Is the well casing vented? ... if yes, answer the following question(s)Y 107A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 107B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 107C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 108 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 108A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 108B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 108C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 109 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 110 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 17 of 196 111 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 112 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 113 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 114 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 115 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 116 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 117 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 118 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 119 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 18 of 196 WS003 - SILVER CREEK WELL 10 - Active 119A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 119B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 119C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 120 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 121 Does well require oil-lubrication?N 122 Is this facility Active or Inactive?A 123 Operating Period (Start Date)01/01 124 Operating Period (Ending Date)12/31 125 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 19 of 196 126 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 127 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 128 Is the well casing vented? ... if yes, answer the following question(s)N 129 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 129A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 129B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 129C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 130 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 131 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 20 of 196 132 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 133 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 134 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 135 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 136 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 137 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 138 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 139 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 140 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 21 of 196 WS004 - STAR POINTE WELL 15B - Active Exception Granted: R309-540-6(7) Air Volume | Air compressors used at the following facilites to charge surge tanks utilize food grade oil and have inline filters: Old Ranch Road Booster Station (PF010), White Pine Booster Station (PF0013), Starpoint Well 15B (WS004), Dutch Draw Booster Station (PF014), McDonalds Booster Station (PF015), and Signal Hill Treatment Plant (TP022) 140A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 140B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 140C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 141 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 142 Does well require oil-lubrication?N 143 Is this facility Active or Inactive?A 144 Operating Period (Start Date)01/01 145 Operating Period (Ending Date)12/31 146 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 22 of 196 147 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 148 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 149 Is the well casing vented? ... if yes, answer the following question(s)Y 149A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 149B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 149C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 150 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 150A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 150B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 23 of 196 150C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 151 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 152 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 153 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 154 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 155 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 156 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 157 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 24 of 196 WS005 - 3 MILE WELL - Active 158 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 159 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 160 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 161 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 161A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 161B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 161C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 162 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 163 Does well require oil-lubrication?N 164 Is this facility Active or Inactive?A 165 Operating Period (Start Date)01/01 166 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 25 of 196 167 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 168 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 169 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 170 Is the well casing vented? ... if yes, answer the following question(s)Y 170A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 170B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 170C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 171 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 171A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 26 of 196 171B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 171C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 172 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 173 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 174 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 175 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 176 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 177 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) D (Notes: The air vac is upstream of the sample tap.) DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 27 of 196 WS008 - BLACKHAWK WELL 2R - Active 178 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 179 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 180 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 181 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 182 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 182A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 182B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 182C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 183 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 184 Does well require oil-lubrication?N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 28 of 196 185 Is this facility Active or Inactive?A 186 Operating Period (Start Date)01/01 187 Operating Period (Ending Date)12/31 188 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 189 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 190 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 191 Is the well casing vented? ... if yes, answer the following question(s)Y 191A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 191B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 191C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 192 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 29 of 196 192A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 192B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 192C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 193 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 194 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 195 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 196 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 197 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 30 of 196 198 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 199 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 200 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 201 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 202 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 203 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 203A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 203B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 203C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 31 of 196 WS009 - GORGOZA WELL 6 - Active 204 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 205 Does well require oil-lubrication?N 206 Is this facility Active or Inactive?A 207 Operating Period (Start Date)01/01 208 Operating Period (Ending Date)12/31 209 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 210 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 211 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 212 Is the well casing vented? ... if yes, answer the following question(s)Y 212A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 32 of 196 212B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 212C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 213 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 213A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 213B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 213C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 214 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 215 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 216 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 33 of 196 217 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 218 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 219 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 220 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 221 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 222 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 223 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 224 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 224A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 224B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 34 of 196 WS010 - NUGGETT WELL - Active 224C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 225 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 226 Does well require oil-lubrication?N 227 Is this facility Active or Inactive?A 228 Operating Period (Start Date)01/01 229 Operating Period (Ending Date)12/31 230 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 231 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 232 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 233 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 35 of 196 233A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 233B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 233C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 234 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 234A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 234B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 234C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 235 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 236 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 36 of 196 237 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 238 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 239 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 240 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 241 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 242 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 243 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 244 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 245 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 37 of 196 WS013 - LAKE WELL 1 - Active 246 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 247 Does well require oil-lubrication?N 248 Is this facility Active or Inactive?A 249 Operating Period (Start Date)01/01 250 Operating Period (Ending Date)12/31 251 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 252 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 253 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 254 Is the well casing vented? ... if yes, answer the following question(s)Y 254A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 38 of 196 254B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 254C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 255 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 255A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 255B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 255C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 256 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 257 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 258 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 39 of 196 259 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 260 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 261 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 262 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 263 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 264 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 265 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 266 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 266A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 266B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: The air vac vent was not screened.) DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 40 of 196 WS014 - SUN PEAK WELL 2 - Active 266C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 267 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 268 Does well require oil-lubrication?N 269 Is this facility Active or Inactive?A 270 Operating Period (Start Date)01/01 271 Operating Period (Ending Date)12/31 272 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 273 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 274 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 275 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 41 of 196 275A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 275B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 275C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 276 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 276A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 276B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 276C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 277 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 278 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 42 of 196 279 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 280 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 281 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 282 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 283 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 284 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 285 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 286 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 287 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 43 of 196 WS015 - SUN PEAK WELL 3 - Active 288 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 289 Does well require oil-lubrication?N 290 Is this facility Active or Inactive?A 291 Operating Period (Start Date)01/01 292 Operating Period (Ending Date)12/31 293 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 294 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 295 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 296 Is the well casing vented? ... if yes, answer the following question(s)Y 296A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 44 of 196 296B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 296C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 297 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 297A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 297B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 297C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 298 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 299 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 300 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 45 of 196 301 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 302 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 303 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 304 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 305 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 306 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 307 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 308 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 308A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 308B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 46 of 196 WS016 - SUMMIT PARK WELL 2 - Active 308C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 309 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 310 Does well require oil-lubrication?N 311 Is this facility Active or Inactive?A 312 Operating Period (Start Date)01/01 313 Operating Period (Ending Date)12/31 314 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 315 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 316 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 317 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 47 of 196 317A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 317B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 317C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 318 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 318A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 318B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 318C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 319 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 320 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 48 of 196 321 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 322 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 323 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 324 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 325 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 326 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 327 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 328 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 329 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 49 of 196 WS018 - SUMMIT PARK WELL 5 - Active 329A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 329B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 329C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 330 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 331 Does well require oil-lubrication?N 332 Is this facility Active or Inactive?A 333 Operating Period (Start Date)01/01 334 Operating Period (Ending Date)12/31 335 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 50 of 196 336 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 337 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 338 Is the well casing vented? ... if yes, answer the following question(s)Y 338A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 338B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. D (Notes: Vent not downturned.) 338C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 339 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 339A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 339B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 51 of 196 339C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 340 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 341 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 342 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 343 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 344 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 345 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 346 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 52 of 196 WS019 - SUMMIT PARK WELL 7 - Active 347 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 348 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 349 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 350 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 350A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 350B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 350C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 351 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 352 Does well require oil-lubrication?N 353 Is this facility Active or Inactive?A 354 Operating Period (Start Date)01/01 355 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 53 of 196 356 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 357 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 358 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 359 Is the well casing vented? ... if yes, answer the following question(s)Y 359A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 359B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 359C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 360 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 360A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 54 of 196 360B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 360C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 361 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 362 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 363 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 364 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 365 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 366 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 55 of 196 WS024 - BISON BLUFFS WELL 15C - Active 367 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 368 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 369 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 370 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 371 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 372 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 373 Does well require oil-lubrication?N 374 Is this facility Active or Inactive?A 375 Operating Period (Start Date)01/01 376 Operating Period (Ending Date)12/31 377 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 56 of 196 378 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 379 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 380 Is the well casing vented? ... if yes, answer the following question(s)Y 380A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 380B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 380C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 381 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 381A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 381B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 57 of 196 381C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 382 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 383 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 384 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 385 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 386 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 387 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 388 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 58 of 196 WS027 - TANK WELL NO. 16 - Active 389 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 390 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 391 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 392 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 392A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 392B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 392C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 393 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 394 Does well require oil-lubrication?N 395 Is this facility Active or Inactive?A 396 Operating Period (Start Date)01/01 397 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 59 of 196 398 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 399 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 400 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 401 Is the well casing vented? ... if yes, answer the following question(s)Y 401A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 401B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 401C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 402 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 402A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 60 of 196 402B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 402C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 403 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 404 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 405 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 406 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 407 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 408 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 61 of 196 409 Well discharge line has a check valve. Exception Granted: R309-515-6(12)(d)(iv | The basis for your request for an exception to R309-515-6(12)(d)(iv) is due to the unique configuration of this well’s discharge piping. The system pressures in the operational setup prevent a check valve from functioning as the rule intends. The Tank Well No. 16 discharges into the suction header of the Silver Creek Pump Station (PF019), which is directly connected to the Silver Creek Tank (ST023). The pressure in the discharge header is determined by water surface elevation in the adjacent Silver Creek Tank (ST023). The pressure at the tank is very low and Mountain Regional’s experience is a check valve will not operate properly under these lower pressure conditions. Additional details can be found in the plans previously submitted as part of the Well Equipping Plan Approval for the Tank Well No. 16. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 410 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 411 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 412 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 413 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 413A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 413B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 62 of 196 WS030 - WAGON TRAIL#2 WELL - Active 413C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 414 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 415 Does well require oil-lubrication?N 416 Is this facility Active or Inactive?A 417 Operating Period (Start Date)01/01 418 Operating Period (Ending Date)12/31 419 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 420 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 421 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 422 Is the well casing vented? ... if yes, answer the following question(s)N 423 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 63 of 196 423A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 423B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 423C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 424 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 425 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 426 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 427 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 428 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 64 of 196 429 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 430 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 431 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 432 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 433 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 434 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 434A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 434B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 434C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 65 of 196 WS031 - GULCH NO 1 WELL - Active 435 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 436 Does well require oil-lubrication?N 437 Is this facility Active or Inactive?A 438 Operating Period (Start Date)01/01 439 Operating Period (Ending Date)12/31 440 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 441 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 442 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 443 Is the well casing vented? ... if yes, answer the following question(s)Y 443A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 66 of 196 443B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 443C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 444 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 444A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 444B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 444C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 445 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 446 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 447 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 67 of 196 448 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 449 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 450 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 451 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 452 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 453 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 454 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 455 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 455A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 455B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 68 of 196 ST002 - SUMMIT PARK TANK 2 - Active 455C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 456 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 457 Does well require oil-lubrication?N 458 Is this facility Active or Inactive?A 459 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 100000 460 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 461 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 462 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 463 Are air vents present? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 69 of 196 463A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 463B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 463C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 463D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 464 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 464A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 464B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 464C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 70 of 196 465 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 466 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 467 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 468 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 469 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 470 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 470A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 470B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 470C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 471 Are the drain line and overflow combined?Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 71 of 196 ST003 - SUMMIT PARK TANK 3 - Active 472 Is this facility Active or Inactive?A 473 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 700000 474 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 475 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 476 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 477 Are air vents present? ... if yes, answer the following question(s)Y 477A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 477B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 477C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 72 of 196 477D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 478 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 478A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 478B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 478C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 479 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 480 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 481 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 73 of 196 ST004 - TIMBERLINE TANK - Active 482 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 483 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 484 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 484A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 484B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 484C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 485 Are the drain line and overflow combined?Y 486 Is this facility Active or Inactive?A 487 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 120000 488 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 74 of 196 489 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 490 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 491 Are air vents present? ... if yes, answer the following question(s)Y 491A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 491B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 491C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 491D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 492 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 492A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 75 of 196 492B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 492C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 493 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 494 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 495 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 496 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 497 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 498 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 498A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 76 of 196 ST006 - BLACKHAWK TANK - Active 498B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Not screened with #4 mesh) 498C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 499 Are the drain line and overflow combined?N 499A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 500 Is this facility Active or Inactive?A 501 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 350000 502 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 503 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 504 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 505 Are air vents present? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 77 of 196 505A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 505B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 505C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 505D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 506 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 506A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 506B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 506C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 78 of 196 507 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 508 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 509 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 510 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 511 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 512 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 512A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 512B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 512C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 513 Are the drain line and overflow combined?Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 79 of 196 ST007 - GLENWILD TANK - Active 514 Is this facility Active or Inactive?A 515 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 650000 516 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 517 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 518 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 519 Are air vents present? ... if yes, answer the following question(s)Y 519A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 519B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 519C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 80 of 196 519D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 520 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 520A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 520B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 520C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 521 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 522 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 523 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 81 of 196 ST008 - RED HAWK TANK - Active 524 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 525 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 525A Mild deterioration or spalling? MIN | 15pts | FW | V021 | R309-545-6(1) and 545-9(1) | Rule requires all water storage tanks to have suitable watertight roofs and sidewalls that shall also exclude birds, animals, insects, and excessive dust. N 525B Severe deterioration or spalling? SIG | 50pts | FW | V022 | R309-545-6(1) and 545-9(1) | Rule requires all water storage tanks to have suitable watertight roofs and sidewalls that shall also exclude birds, animals, insects, and excessive dust. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 526 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 526A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 526B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 526C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 527 Are the drain line and overflow combined?Y 528 Is this facility Active or Inactive?A 529 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 400000 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 82 of 196 530 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 531 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 532 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 533 Are air vents present? ... if yes, answer the following question(s)Y 533A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 533B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 533C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 533D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 83 of 196 534 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 534A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 534B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 534C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 535 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 536 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 537 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 538 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 539 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 84 of 196 ST009 - ATKINSON TANK - Active 540 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 540A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 540B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 540C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 541 Are the drain line and overflow combined?Y 542 Is this facility Active or Inactive?A 543 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 700000 544 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 545 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 85 of 196 546 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 547 Are air vents present? ... if yes, answer the following question(s)Y 547A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 547B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 547C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 547D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 548 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 548A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 548B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 86 of 196 548C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 549 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 550 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 551 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 552 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 553 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 554 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 554A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 554B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 87 of 196 ST010 - SPORTS PARK TANK - Active 554C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 555 Are the drain line and overflow combined?Y 556 Is this facility Active or Inactive?A 557 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1000000 558 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 559 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 560 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 561 Are air vents present? ... if yes, answer the following question(s)Y 561A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 561B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 88 of 196 561C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 561D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 562 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 562A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 562B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 562C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 563 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 564 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 89 of 196 ST011 - BEAR HOLLOW TANK - Active 565 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 566 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 567 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 568 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 568A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 568B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 568C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 569 Are the drain line and overflow combined?N 569A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 570 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 90 of 196 571 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 160000 572 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 573 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 574 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 575 Are air vents present? ... if yes, answer the following question(s)Y 575A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 575B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 575C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 575D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 91 of 196 576 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 576A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 576B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 576C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 577 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 578 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 579 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 580 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 581 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 92 of 196 ST012 - SPRING TANK - Active 582 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 582A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 582B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 582C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 583 Are the drain line and overflow combined?Y 584 Is this facility Active or Inactive?A 585 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 144600 586 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 587 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 93 of 196 588 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 589 Are air vents present? ... if yes, answer the following question(s)Y 589A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 589B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 589C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 589D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 590 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 590A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 590B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 94 of 196 590C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 591 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 592 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 593 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 594 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 595 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 596 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 596A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 596B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 95 of 196 ST013 - MCDONALD DRAW TANK - Active 596C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 597 Are the drain line and overflow combined?N 597A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 598 Is this facility Active or Inactive?A 599 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 250000 600 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 601 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 602 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 603 Are air vents present? ... if yes, answer the following question(s)Y 603A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 96 of 196 603B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 603C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 603D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 604 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 604A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 604B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 604C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 605 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 97 of 196 606 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 607 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 608 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 609 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 610 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 610A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 610B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 610C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 611 Are the drain line and overflow combined?N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 98 of 196 ST014 - WHITE PINE TANK - Active 611A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 612 Is this facility Active or Inactive?A 613 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 500000 614 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 615 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 616 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 617 Are air vents present? ... if yes, answer the following question(s)Y 617A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 617B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 99 of 196 617C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 617D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 618 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 618A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 618B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 618C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 619 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 620 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 100 of 196 ST015 - DUTCH DRAW TANK - Active 621 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 622 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 623 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 624 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 624A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 624B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 624C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 625 Are the drain line and overflow combined?N 625A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 626 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 101 of 196 627 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 250000 628 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 629 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 630 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 631 Are air vents present? ... if yes, answer the following question(s)Y 631A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 631B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 631C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 631D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 102 of 196 632 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 632A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 632B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 632C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: There is a gap in the gasket.) 633 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 634 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 635 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 636 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 637 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 103 of 196 ST016 - SNOWSLIDE TANK - Active 638 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 638A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 638B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 638C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 639 Are the drain line and overflow combined?N 639A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 640 Is this facility Active or Inactive?A 641 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1000000 642 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 104 of 196 643 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 644 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 645 Are air vents present? ... if yes, answer the following question(s)Y 645A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 645B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 645C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 645D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 646 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 646A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 105 of 196 646B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 646C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 647 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 648 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 649 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 650 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 651 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 652 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 652A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 106 of 196 ST017 - WEST HILLS TANK - Active 652B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 652C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 653 Are the drain line and overflow combined?N 653A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 654 Is this facility Active or Inactive?A 655 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 800000 656 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 657 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 658 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 659 Are air vents present? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 107 of 196 659A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 659B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 659C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 659D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 660 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 660A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 660B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 660C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 108 of 196 661 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 662 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 663 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 664 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 665 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 666 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 666A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 666B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 666C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 667 Are the drain line and overflow combined?N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 109 of 196 ST018 - SIGNAL HILL TANK - Active 667A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 668 Is this facility Active or Inactive?A 669 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 447512 670 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 671 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 672 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 673 Are air vents present? ... if yes, answer the following question(s)Y 673A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 673B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 110 of 196 673C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 673D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 674 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 674A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 674B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 674C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 675 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 676 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 111 of 196 ST019 - PRESERVE TANK - Active 677 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 678 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 679 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 680 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 680A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 680B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 680C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 681 Are the drain line and overflow combined?Y 682 Is this facility Active or Inactive?A 683 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 350000 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 112 of 196 684 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 685 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 686 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 687 Are air vents present? ... if yes, answer the following question(s)Y 687A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 687B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 687C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 687D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 113 of 196 688 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 688A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 688B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 688C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 689 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 690 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 691 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 692 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 693 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 114 of 196 ST020 - MIDDLE VALLEY TANK - Active 694 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 694A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 694B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 694C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 695 Are the drain line and overflow combined?N 695A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 696 Is this facility Active or Inactive?A 697 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1050000 698 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 115 of 196 699 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 700 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 701 Are air vents present? ... if yes, answer the following question(s)Y 701A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 701B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 701C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 701D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 702 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 702A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 116 of 196 702B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 702C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: The gaskets on both hatches have gaps.) 703 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 704 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 705 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 706 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 707 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 708 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 708A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 117 of 196 ST021 - STAGECOACH TANK NORTH - Active 708B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 708C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 709 Are the drain line and overflow combined?Y 710 Is this facility Active or Inactive?A 711 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 100000 712 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 713 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 714 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 715 Are air vents present? ... if yes, answer the following question(s)Y 715A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 118 of 196 715B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 715C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 715D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 716 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 716A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 716B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 716C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 717 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 119 of 196 ST022 - STAGECOACH TANK SOUTH - Active 718 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 719 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 720 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 721 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 722 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 722A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. D (Notes: The overflow discharge does not have a 12 inch air gap.) 722B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 722C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 723 Are the drain line and overflow combined?Y 724 Is this facility Active or Inactive?A 725 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 80000 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 120 of 196 726 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 727 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 728 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 729 Are air vents present? ... if yes, answer the following question(s)Y 729A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 729B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 729C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 729D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 121 of 196 730 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 730A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 730B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 730C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 731 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 732 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 733 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 734 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 735 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 122 of 196 ST023 - SILVER CREEK TANK - Active 736 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 736A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 736B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 736C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 737 Are the drain line and overflow combined?Y 738 Is this facility Active or Inactive?A 739 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 2000000 740 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 741 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 123 of 196 742 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 743 Are air vents present? ... if yes, answer the following question(s)Y 743A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 743B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 743C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 743D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 744 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 744A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 744B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 124 of 196 744C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: There are gaps in the gaskets on both hatches.) 745 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 746 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 747 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 748 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 749 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 750 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 750A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 750B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Overflow not properly screened) DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 125 of 196 ST024 - COLONY PHASE 5 TANK - Active 750C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 751 Are the drain line and overflow combined?Y 752 Is this facility Active or Inactive?A 753 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 300000 754 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 755 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 756 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 757 Are air vents present? ... if yes, answer the following question(s)Y 757A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 757B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 126 of 196 757C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 757D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 758 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 758A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 758B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 758C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Gasket does not provide a complete seal.) 759 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 760 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 127 of 196 ST026 - CANYONS TANK 1 - Active 761 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 762 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 763 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 764 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 764A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 764B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 764C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 765 Are the drain line and overflow combined?Y 766 Is this facility Active or Inactive?A 767 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 240000 DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 128 of 196 768 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 769 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 770 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 771 Are air vents present? ... if yes, answer the following question(s)Y 771A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 771B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 771C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 771D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 129 of 196 772 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 772A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 772B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 772C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 773 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 774 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 775 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 776 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 777 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 130 of 196 ST027 - SUMMIT PARK TANK 1 - RPL - Active 778 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 778A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 778B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 778C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 779 Are the drain line and overflow combined?Y 780 Is this facility Active or Inactive?A 781 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 250000 782 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 783 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 131 of 196 784 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 785 Are air vents present? ... if yes, answer the following question(s)Y 785A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 785B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 785C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 785D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 786 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 786A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 786B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 132 of 196 786C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 787 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 788 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 789 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 790 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 791 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 792 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 792A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 792B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: Overflow line not completely covered with #4 mesh.) DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 133 of 196 HD001 - SUMMIT BOOSTER HYDRO -- Hydropneumatic Tanks - Active PF001 - PRESERVE PUMP STATION -- Pump Stations - Active 792C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 793 Are the drain line and overflow combined?Y 794 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 795 A tank located below ground allows for adequate drainage, ventilation, maintenance, and flood protection. MIN | 15pts | PU | PT14 | R309-540-6(2) | Rule requires diaphragm or air tanks and appurtenances located below ground to have adequate provisions for drainage, ventilation, maintenance, and flood protection. C 796 Is there a means to measure pressure to verify the tank is pressurizing properly? MIN | 15pts | PU | PT08 | R309-540-6(3) | A pressure gauge shall be installed on the pressure tank inlet line. C 797 Pump station/Hydropneumatic tank and controls not protected against hazard? SIG | 25pts | PU | PT13 | R309-540-5(1)(a)(i) | The pump station site meets the requirements for sanitary protection of water quality, hydraulics of the system, and protection against interruption of service by fire, flood, or any other hazard. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 798 Is this facility Active or Inactive?A 799 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 800 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 134 of 196 801 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 801A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 802 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 803 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 804 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 805 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 805A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 805B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 805C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 806 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 135 of 196 PF003 - CRESTVIEW BOOSTER STATION -- Pump Stations - Active 807 Is this facility Active or Inactive?A 808 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 809 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 810 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 810A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 811 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 812 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 813 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 814 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 136 of 196 PF004 - INNSBROOK BOOSTER STATION -- Pump Stations - Active 814A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 814B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 814C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 815 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 816 Is this facility Active or Inactive?A 817 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 818 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 819 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 819A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 137 of 196 PF005 - KILBY BOOSTER STATION -- Pump Stations - Active 820 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 821 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 822 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 823 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 823A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 823B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 823C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 824 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 825 Is this facility Active or Inactive?A 826 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 827 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 138 of 196 828 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 828A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 829 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 830 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 831 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 832 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 832A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 832B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 832C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 833 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 139 of 196 PF006 - BLACK HAWK BOOSTER STATION -- Pump Stations - Active 834 Is this facility Active or Inactive?A 835 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 836 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 837 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 837A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 838 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 839 There are no unprotected cross-connections in the pump station. Exception Granted: R309-550-9(2) Recycled Water | null SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 840 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 841 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 140 of 196 PF007 - GLENWILD BOOSTER STATION -- Pump Stations - Active 841A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 841B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 841C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 842 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 843 Is this facility Active or Inactive?A 844 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 845 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 846 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 846A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 141 of 196 PF008 - SIGNAL HILL BOOSTER STATION -- Pump Stations - Active 847 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 848 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 849 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 850 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 850A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 850B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 850C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 851 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 852 Is this facility Active or Inactive?A 853 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 854 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 142 of 196 855 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 855A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 856 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 857 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 858 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 859 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 859A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 859B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 859C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 860 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 143 of 196 PF009 - SPINE ROAD BOOSTER STATION -- Pump Stations - Active 861 Is this facility Active or Inactive?A 862 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 863 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 864 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 864A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 865 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 866 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 867 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 868 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 144 of 196 PF010 - OLD RANCH BOOSTER STATION -- Pump Stations - Active Exception Granted: R309-540-6(7) Air Volume | Air compressors used at the following facilites to charge surge tanks utilize food grade oil and have inline filters: Old Ranch Road Booster Station (PF010), White Pine Booster Station (PF0013), Starpoint Well 15B (WS004), Dutch Draw Booster Station (PF014), McDonalds Booster Station (PF015), and Signal Hill Treatment Plant (TP022) 868A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 868B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 868C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 869 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 870 Is this facility Active or Inactive?A 871 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 872 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 873 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 145 of 196 PF011 - BEAR HOLLOW BOOSTER STATION -- Pump Stations - Active 873A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 874 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 875 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 876 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 877 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 877A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 877B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 877C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 878 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 879 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 146 of 196 880 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 881 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 882 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 882A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 883 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 884 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 885 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 886 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 886A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 147 of 196 PF012 - SILVER SPRINGS BOOSTER STATION -- Pump Stations - Active 886B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 886C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 887 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 888 Is this facility Active or Inactive?A 889 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 890 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 891 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 891A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 892 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 148 of 196 PF013 - WHITE PINE BOOSTER STATION -- Pump Stations - Active Exception Granted: R309-540-6(7) Air Volume | Air compressors used at the following facilites to charge surge tanks utilize food grade oil and have inline filters: Old Ranch Road Booster Station (PF010), White Pine Booster Station (PF0013), Starpoint Well 15B (WS004), Dutch Draw Booster Station (PF014), McDonalds Booster Station (PF015), and Signal Hill Treatment Plant (TP022) 893 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 894 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 895 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 895A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 895B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 895C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 896 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 897 Is this facility Active or Inactive?A 898 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 899 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 149 of 196 900 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 900A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 901 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 902 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 903 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 904 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 904A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 904B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 904C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 905 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 150 of 196 PF014 - DUTCH DRAW BOOSTER STATION -- Pump Stations - Active Exception Granted: R309-540-6(7) Air Volume | Air compressors used at the following facilites to charge surge tanks utilize food grade oil and have inline filters: Old Ranch Road Booster Station (PF010), White Pine Booster Station (PF0013), Starpoint Well 15B (WS004), Dutch Draw Booster Station (PF014), McDonalds Booster Station (PF015), and Signal Hill Treatment Plant (TP022) 906 Is this facility Active or Inactive?A 907 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 908 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 909 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 909A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 910 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 911 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 912 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 151 of 196 PF015 - MACDONALD DRAW BOOSTER STATION -- Pump Stations - Active Exception Granted: R309-540-6(7) Air Volume | Air compressors used at the following facilites to charge surge tanks utilize food grade oil and have inline filters: Old Ranch Road Booster Station (PF010), White Pine Booster Station (PF0013), Starpoint Well 15B (WS004), Dutch Draw Booster Station (PF014), McDonalds Booster Station (PF015), and Signal Hill Treatment Plant (TP022) 913 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 913A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 913B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 913C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 914 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 915 Is this facility Active or Inactive?A 916 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 917 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 918 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 152 of 196 PF016 - RED HAWK BOOSTER STATION -- Pump Stations - Active 918A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 919 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 920 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 921 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 922 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 922A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 922B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 922C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 923 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 924 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 153 of 196 925 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 926 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 927 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 927A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 928 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 929 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 930 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 931 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 931A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 154 of 196 PF017 - SUMMIT BOOSTER PUMP STATION -- Pump Stations - Active 931B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 931C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 932 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 933 Is this facility Active or Inactive?A 934 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 935 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 936 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 936A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 937 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 155 of 196 PF018 - MIDDLE VALLEY BOOSTER PUMP STATION -- Pump Stations - Active 938 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 939 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 940 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 940A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 940B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 940C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 941 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 942 Is this facility Active or Inactive?A 943 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 944 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 156 of 196 945 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 945A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 946 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 947 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 948 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 949 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 949A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 949B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 949C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 950 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 157 of 196 PF019 - SILVER CREEK PUMP STATION -- Pump Stations - Active 951 Is this facility Active or Inactive?A 952 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 953 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 954 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 954A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 955 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 956 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 957 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 958 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 158 of 196 PF020 - HIDDEN CREEK BOOSTER PUMP STATION -- Pump Stations - Active 958A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 958B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 958C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 959 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 960 Is this facility Active or Inactive?A 961 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 962 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Vertical turbine 963 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 963A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 159 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Treatment General - Active Exception Granted: R309-540-6(7) Air Volume | Air compressors used at the following facilites to charge surge tanks utilize food grade oil and have inline filters: Old Ranch Road Booster Station (PF010), White Pine Booster Station (PF0013), Starpoint Well 15B (WS004), Dutch Draw Booster Station (PF014), McDonalds Booster Station (PF015), and Signal Hill Treatment Plant (TP022) 964 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 965 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 966 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 967 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 967A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 967B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 967C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 968 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 969 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 160 of 196 970 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 971 Operating Period (Start Date)01/01 972 Operating Period (Ending Date)12/31 973 What is the objective of the treatment process and how do you know it is working? (e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.) Surface water treatment 974 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how you determine you are meeting your Treatment Requirements. Listed in comments (Notes: Dose ACH, flow through flocculation basin, then through the clarifier, through membrane skids, then through GAC system and into the storage tank where the water is chlorinated.) 975 What Chemicals are used? Why?ACH 3 ppm and 0.8% hypochlorite 976 How is the chemical dose adjusted with flow and water quality? Prompts: What flow rate is used for the adjustment (influent, effluent, CFE)? What water quality parameters would make you change dose rate? Influent flow 977 Does influent flow rate vary?Y 977A If yes, why does influent flow rate vary?Based on demand 977B If yes, does chemical dose rate adjust to remain compliant at different flow conditions?Yes 978 Process control testing is consistent with the specific treatment process MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 979 There is a means to accurately measure the quantities of chemicals used. SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for measuring the quantities of chemicals used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 980 Treatment plant properly secured to protect the quality of the treated water, R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 981 Are liquid chemicals used? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 161 of 196 981A Proper cross-connection control is provided on the service water lines that feed the solution tanks SIG | 50pts | TR | TG53 | R309-525-11(9)(b)(i) | Rule requires cross connection control to be provided to assure that the make-up waterlines discharging to solution tanks shall be properly protected from backflow as required by the Utah Plumbing Code. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 981B There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C 981C If there is a day tank, the bulk tank and day tanks have separate screened vents. MIN | 15pts | TR | TG60 | R309-525-11(8)(b)(vi) | Rule requires acid storage tanks to be vented to the outside atmosphere, but not through vents in common with day tanks. C 981D Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals or liquids MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 981E No direct connections exist between a sewer and drain or overflow from the feeder, solution chamber, or tank. SIG | 50pts | DS | M020 | R309-105-12(1) | Rule states that a water supplier shall not allow a connection to his system which may jeopardize its quality and integrity. Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 981F Chemical storage tank access opening properly covered? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 982 Treatment chemicals meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 983 Are all chemical feeders properly verified for accuracy? SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the necessary amounts of chemicals at an accurately controlled rate, throughout the anticipated range of feed. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 162 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Treatment General 984 Spare parts are available for all chemical feeders MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 985 Incompatible chemicals stored separately SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are incompatible from being fed, stored, or handled together. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 986 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 987 Raw water compliance samples are collected before any treatment. R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) Y 987A If yes, was location shown?Yes 988 Where are finished water quality monitoring samples collected?Within the treatment plant 989 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the proper disposal of treatment plant waste to land or water? MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 990 Which parameters are watched when running treatment plant?Chlorine residual and turbidity 991 What type of alarm system is used?SCADA 992 Does treatment plant have a SCADA system?Y 992A Can operators respond to all alarms in a normal day, or do they have to silence legitimate alarms? Yes 992B How are alarm set points adjusted and how are changes recorded?Through SCADA program 993 Proper lab equipment on site to support required operations & maintenance of the plant? SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be provided to assure proper operation and monitoring of the water plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 994 Pre- and post-chlorination systems for surface water plants shall be independent to prevent siphoning of raw or partially treated water into the clear well. SIG | 50pts | TR | TG35 | R309-520-7(1)(h), R309-525-11(9)(a) and (b) | Pre- and post-chlorination systems must be independent to prevent possible siphoning of partially treated water into the clear well. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 163 of 196 995 For a surface water plant serving more than 3,300 persons, chlorine residual of water entering the distribution system shall be continuously measured. SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 996 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how treatment requirements for Giardia, Virus and Cryptosporidium removal/inactivation determine are determined? See comment on this question in 997 Is a gas chlorination facility located inside of a water treatment plant with multiple processes and operating areas? ... if yes, answer the following question(s) N 998 Do you treat recycled water?Y 998A Do you maintain records of the percent of influent flow that is recycled backwash water? Yes 998B If backwash water is recycled, where does the recycle water re-enter the treatment plant? At the head of the plant 998C Are raw water compliance samples collected after recycled water enters the plant? R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) C 999 Are finished water storage (clearwell and/or backwash tank) access openings present? ... if yes, answer the following question(s) Y 999A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 999B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 999C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 999D Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1000 Primary disinfection to complete surface water treatment requirements is achieved prior to the first connection at peak flow conditions SIG | 25pts | TR | T096 | R309-525-16(b) and (b)(i) | R309-525-16(b) and (b)(i) C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 164 of 196 TP001 - KILBY BOOSTER STATION CHLORINATOR -- Treatment - Chlorination General - 1001 Disinfection compliance monitoring location demonstrates adequate CT has been achieved SIG | 25pts | TR | T099 | R309-215 | R309-215 C 1002 Is this facility Active or Inactive?I 1002 A Explain why this facility is Inactive (Is this facility in stand-by mode?)The system has found they don't need this station to be active to maintain their chlorine residuals. The tanks have been removed for the time being. 1003 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 1004 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1005 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1006 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1007 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1008 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1009 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 165 of 196 TP004 - STARPOINT WELL #15B GAS CHLORINATOR -- Treatment - Chlorination General - Active 1010 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1011 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1011 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 1012 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1013 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1014 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1014 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1014 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1014 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1014 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1014 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1015 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1016 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 166 of 196 1017 Is this facility Active or Inactive?A 1018 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 1019 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1020 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1021 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1022 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1023 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1024 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1025 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1026 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 167 of 196 TP012 - SPRING CREEK SPRING CHLORINATOR -- Treatment - Chlorination General - Active 1026 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1027 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1028 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1029 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1029 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1029 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1029 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1029 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1029 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1030 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1031 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1032 Is this facility Active or Inactive?A 1033 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 168 of 196 1034 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1035 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1036 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1037 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1038 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1039 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1040 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1041 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1041 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1042 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 169 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Treatment - Chlorination General - Active 1043 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1044 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1044 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1044 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1044 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1044 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1044 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1045 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1046 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1047 Is this facility Active or Inactive?A 1048 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. Y 1048 A If yes, no new connections have been added prior to approved first connection that would change the disinfection CT calculation. SIG | 50pts | TR | TD26 | R309-505-7(2), R309-520-4 and 6(4) | Point of application of disinfectants shall be at a location that will achieve the required disinfection CT prior to the first service connection. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 170 of 196 1049 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1050 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1051 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1052 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1053 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1054 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1055 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1056 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1056 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1057 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 171 of 196 TP024 - BISON BLUFF WELL GAS CHLORINATOR -- Treatment - Chlorination General - Active 1058 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1059 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1059 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1059 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1059 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1059 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1059 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1060 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1061 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1062 Is this facility Active or Inactive?A 1063 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 1064 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 172 of 196 1065 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1066 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1067 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1068 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1069 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1070 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1071 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1071 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1072 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1073 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1074 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 173 of 196 TP025 - COLONY PHASE 5 CHLORINATOR -- Treatment - Chlorination General - Active 1074 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1074 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1074 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1074 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1074 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1075 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1076 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1077 Is this facility Active or Inactive?A 1078 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 1079 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1080 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 174 of 196 1081 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1082 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1083 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1084 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1085 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1086 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1086 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1087 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1088 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1089 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1089 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1089 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 175 of 196 TP026 - HIDDEN CREEK CHLORINATOR -- Treatment - Chlorination General - Active 1089 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1089 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1089 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1090 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1091 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1092 Is this facility Active or Inactive?A 1093 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 1094 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1095 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1096 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 176 of 196 1097 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1098 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1099 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1100 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1101 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1101 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1102 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1103 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1104 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1104 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1104 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1104 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1104 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 177 of 196 TP027 - SUMMIT PARK TANK 1 - RPL CHLORINATOR -- Treatment - Chlorination General - Active 1104 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1105 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1106 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1107 Is this facility Active or Inactive?A 1108 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 1109 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1110 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1111 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1112 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 178 of 196 1113 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 1114 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 1115 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 1116 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 1116 A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent 1117 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1118 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1119 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 1119 A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1119 B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 1119 C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1119 D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1119 E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 179 of 196 TP001 - KILBY BOOSTER STATION CHLORINATOR -- Gaseous Chlorination - 1120 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 1121 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1122 Is this facility Active or Inactive?I 1122 A Explain why this facility is Inactive (Is this facility in stand-by mode?)The system has removed the chlorine gas tanks as this chlorinator is not currently needed. 1123 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1124 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1125 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1126 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1127 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 180 of 196 1128 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1129 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 1130 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1131 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1132 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1133 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 1133 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1133 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1133 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No chlorine gas tanks currently on site. If tanks are ever installed, a respirator will be required.) 1134 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 181 of 196 TP004 - STARPOINT WELL #15B GAS CHLORINATOR -- Gaseous Chlorination - Active 1135 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1136 Is this facility Active or Inactive?A 1137 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1138 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1139 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1140 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1141 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 1142 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1143 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 182 of 196 TP012 - SPRING CREEK SPRING CHLORINATOR -- Gaseous Chlorination - Active 1144 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1145 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1146 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1147 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 1147 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1147 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1147 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: No NIOSH respirator on site.) 1148 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 1149 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1150 Is this facility Active or Inactive?A 1151 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 183 of 196 1152 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1153 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1154 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1155 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 1156 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1157 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 1158 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1159 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1160 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1161 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 184 of 196 TP024 - BISON BLUFF WELL GAS CHLORINATOR -- Gaseous Chlorination - Active 1161 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1161 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1161 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: No NIOSH respirator on site.) 1162 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 1163 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1164 Is this facility Active or Inactive?A 1165 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1166 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1167 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1168 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1169 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 185 of 196 1170 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1171 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 1172 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1173 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1174 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1175 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 1175 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1175 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1175 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: No NIOSH respirator on site.) 1176 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 186 of 196 TP025 - COLONY PHASE 5 CHLORINATOR -- Gaseous Chlorination - Active 1177 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1178 Is this facility Active or Inactive?A 1179 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1180 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1181 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1182 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1183 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 1184 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1185 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 187 of 196 TP026 - HIDDEN CREEK CHLORINATOR -- Gaseous Chlorination - Active 1186 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1187 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1188 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1189 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 1189 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1189 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1189 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: No NIOSH respirator on site.) 1190 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 1191 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1192 Is this facility Active or Inactive?A 1193 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 188 of 196 1194 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1195 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1196 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1197 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 1198 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1199 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 1200 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1201 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1202 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1203 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 189 of 196 TP027 - SUMMIT PARK TANK 1 - RPL CHLORINATOR -- Gaseous Chlorination - Active 1203 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1203 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1203 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: No NIOSH respirator on site.) 1204 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 1205 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1206 Is this facility Active or Inactive?A 1207 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1208 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 1209 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 1210 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 1211 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 190 of 196 1212 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1213 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 1214 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1215 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1216 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1217 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 1217 A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1217 B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 1217 C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. D (Notes: No NIOSH respirator on site.) 1218 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 191 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Liquid Hypochlorination - Active TP022 - SIGNAL HILL FILTER PLANT -- Coagulation 1219 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1220 Is this facility Active or Inactive?A 1221 Operational means provided to avoid injection of significantly decayed hypochlorite, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 1222 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 1223 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: System uses 0.8% hypochlorite) 1224 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (a full eyewash station and shower is not required) SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: System uses 0.8% hypochlorite) 1225 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C 1226 Records are kept to minimize the use of decayed hypochlorite solution MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 1227 There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 192 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Flocculation TP022 - SIGNAL HILL FILTER PLANT -- Filtration - General 1228 Primary coagulant used at all times the plant is in operation Y 1229 What primary coagulant is being used?A 1230 Is a coagulant aid or filter aid being added?N 1231 Is there a means to determine coagulant dosage? MIN | 15pts | TR | T083 | R309-525-11(2)(a) and (d) | R309-525-11(2)(a) and (d) C 1232 There is a standard operating procedure (SOP) available for adjusting flocculator speed. C 1233 Does the flocculation process produce visible floc? MIN | 15pts | TR | T082 | R309-525-12(2)(g) | The flocculation unit shall be capable of producing a visible, settleable flow. C 1234 Instrumentation and controls for the process are operational, and in service SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1235 Is turbidity monitoring required? ... if yes, answer the following question(s)Y 1235 A How often is the turbidity meter calibrated?Monthly 1235 B How often is the flow of turbidity meter verified?Monthly 1235 C Is continuous turbidity monitoring in operation. SIG | 50pts | TR | T005 | R309-525-15(4)(b)(vi), R309-525-15(4)(c)(vii) | Each dual media and tri-media filter must be provided with equipment which shall continuously monitor turbidity in the filtered water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1236 What is the maximum filtration rate throughout the year (in gpm/sf)?800 gpm per skid 1237 What criteria are used to determine when a filter backwash is needed?C 1238 What criteria are used to determine filtration is functioning properly? (PSI, Turbidity, Headloss, Flow rate, water quality parameter) Turbidity 1239 Criteria is used to determine filter loading rate meets the manufacturers recommendations? R309-525-15(2) Explain in comments... MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 1240 What criteria are used to determine if filter media needs to be replaced?Head loss 1241 Is backwash flow rate verified to determine it meets minimum requirements? MIN | 15pts | TR | T076 | R309-525-15(7) | Rule requires that backwash systems be designed and operated to provide for adequate backwash with minimum media loss. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 193 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Microfiltration 1242 If system filters by Direct Filtration, the plant is configured to shut down automatically when a source water exceeds 20 NTU for longer than 3 hours, or when the source water turbidity exceeds 30 NTU at any time? R309-530-5(3)(g) SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: System does not filter by direct filtration) 1243 Type of membrane filtration process?UF 1244 What is the typical turbidity of the filter influent water (in NTU)?5 1245 What is the typical turbidity of the filter effluent (in NTU)?0.03 1246 Is there pretreatment prior to the membranes? ... if yes, answer the following question(s) Y 1246 A Describe pretreatment Flocculation 1247 Is there a way to release trapped air from the membrane skid (i.e. air release or manual valves)? Y 1248 Water used for backwashing or cleaning of membranes is of equal or greater quality than water produced by membranes SIG | 25pts | TR | T043 | R309-105-10, R309-525-19, R309-525-15(4)(a), R309-525- 15(4)(b)(ii to v), R309-525-15(4)(c)(ii to vi) | R309-530-7 Y 1249 Is the plant equipped with a clean-in-place (CIP) function? ... if yes, answer the following question(s) Y 1249 A What criteria are used for initiating a clean-in-place (CIP) sequence?Time 1249 B Chemical concentrations are checked at the end of clean-in-place (CIP) cycle to confirm there is remaining active chemical cleaning solution? Prompt: this confirms starting dose rates are valid. Should be undertaken once or twice a year? Yes 1249 C Written records are maintained to help troubleshoot future cleaning procedures?Yes 1249 D How is the CIP sequence initiated?M 1249 E What chemicals are used for a CIP sequence?Caustic soda, then a rinse, then citric acid 1249 F Clean-in-place (CIP) chemicals are ANSI/NSF 60 certified SIG | 25pts | TR | T080 | R309-525-11(5), R309-525-25(1), R309-535-11(5)(d) | Rule requires that all chemicals added to water being treated for use in a public water system for human consumption comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 1249 G Where does the CIP waste discharge to?To a secondary clarifier, then a sludge basin DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 194 of 196 1249 H Membrane system has engineered design to prevent the accidental release of cleaning fluids into the filtered water system. e.g. Double-block and bleed valving, a filter to waste line, a removable spool piece inserted during cleaning. SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1250 Membrane fiber repairs are performed with an ANSI/NSF 60 approved materials SIG | 25pts | TR | T080 | R309-525-11(5), R309-525-25(1), R309-535-11(5)(d) | Rule requires that all chemicals added to water being treated for use in a public water system for human consumption comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 1251 What is the procedure used for membrane repairs?Pin 1252 Water system conducts daily direct integrity test (DIT)? SIG | 50pts | TR | T091 | R309-215-15(18)(b)(iii) | R309-215-15(18)(b)(iii) Y 1252 A DIT is conducted using a valid method to calculate pass/fail of the DIT? SIG | 50pts | TR | T091 | R309-215-15(18)(b)(iii) | R309-215-15(18)(b)(iii) C 1252 B Water system has a minimum start pressure for daily DIT. Explain in comments... SIG | 50pts | TR | T093 | R309-215-15(18)(b)(iii)(D) | R309-215-15(18)(b)(iii)(D) C 1253 Does the system conduct continuous indirect integrity testing? SIG | 50pts | TR | T092 | R309-215-15(18)(b)(iv) | Systems must conduct continuous indirect integrity monitoring on each membrane unit. Unless the director approves an alternative parameter, continuous indirect integrity monitoring must include continuous filtrate turbidity monitoring. Continuous monitoring must be separately conducted on each membrane unit. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 1253 A If yes, is continuous filtrate turbidity measurements are used to conduct continuous indirect integrity testing? Or DDW Director approved alternative is used. SIG | 50pts | TR | T092 | R309-215-15(18)(b)(iv) | Systems must conduct continuous indirect integrity monitoring on each membrane unit. Unless the director approves an alternative parameter, continuous indirect integrity monitoring must include continuous filtrate turbidity monitoring. Continuous monitoring must be separately conducted on each membrane unit. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1253 B If using turbidity monitoring for continuous indirect monitoring, there is a turbidity meter on each individual membrane monitoring finished water? SIG | 50pts | TR | T092 | R309-215-15(18)(b)(iv) | Systems must conduct continuous indirect integrity monitoring on each membrane unit. Unless the director approves an alternative parameter, continuous indirect integrity monitoring must include continuous filtrate turbidity monitoring. Continuous monitoring must be separately conducted on each membrane unit. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 195 of 196 TP022 - SIGNAL HILL FILTER PLANT -- Activated Carbon - Granular 1253 C If using turbidity monitoring for continuous indirect monitoring, there is a turbidity control limit to trigger a Direct Integrity test SIG | 50pts | TR | T094 | R309-215-15(18)(b)(iv) | If indirect integrity monitoring includes turbidity and if the filtrate turbidity readings are above 0.15 NTU for a period greater than 15 minutes (i.e., two consecutive 15-minute readings above 0.15 NTU), direct integrity testing must immediately be performed on the associated membrane unit. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1253 D Turbidity control limit used is below 0.15 NTU or higher with Director approval? Guidance - confirm this is captured as a critical control point. If no value, default is 0.15 NTU SIG | 50pts | TR | T094 | R309-215-15(18)(b)(iv) | If indirect integrity monitoring includes turbidity and if the filtrate turbidity readings are above 0.15 NTU for a period greater than 15 minutes (i.e., two consecutive 15-minute readings above 0.15 NTU), direct integrity testing must immediately be performed on the associated membrane unit. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 1254 Does the turbidity ever reach this control limit?N 1255 Granular activated carbon (GAC) filters used for removal of organic material that may be available as DBP precursors Y 1256 When was the last time the filters were evaluated to determine the condition of the media? 04/01/2024 (Notes: System did not have an exact date but said it was in the spring of 2024.) 1257 What is the typical filter run time throughout the year?20 hours per day 1258 What criteria are used to determine when a filter backwash is needed?H 1259 Are the filters equipped with surface wash or air scour to enhance the backwash?N 1260 Has there been any violation in turbidity in the past 12 months?N DEQ | Drinking Water Run Date: 10/11/2024 15:55:39 | Rating: Approved UTAH22137 MOUNTAIN REGIONAL WATER SSD page 196 of 196