HomeMy WebLinkAboutDAQ-2024-010900
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-1001-24
Site ID 10645 (B1)
Christopher Rose
Staker Parson Companies dba Hales Sand & Gravel
89 West 13490 South, Suite 100
Draper, UT 84020
Dear Mr. Rose:
Re: Staker Parson Companies dba Hales Sand & Gravel – Temporary Relocation/Operation,
Notice of Intent – Sanpete County
Your Notice of Intent dated October 1, 2024, to relocate portable aggregate equipment to the
temporary project for the former Cox/Hales Sand and Gravel Pit, located at 350 East 400 North,
Centerfield, UT, was received by the Utah Division of Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
Astec HSI Crusher and associated 496 hp generator
This equipment has been permitted for operation in the State of Utah by the portable Wheeler
Machinery Approval Order (AO) DAQE-AN142390014-18, dated August 1, 2018. The above
location is a permanent aggregate processing site with established hourly operation and rolling
total production limits. All equipment operating at this site must be in accordance with the current
AO for this facility DAQE-278-94, dated April 11, 1994. A modeling analysis submitted by
Trinity Consultants on October 12, 2015, demonstrated that the ton per hour production rate can
exceed the Condition 11 limit of 400 tons per hour, provided that the total production rate of all
the operating equipment does not exceed 550 tons per hour, and that the total site’s aggregate
production does not exceed the 24-hour limit of 4,800 tons. The 12-month rolling total limit
cannot exceed 500,000 tons.
The owner/operator shall maintain records of the actual operation days, hours, and production
rate, of the above referenced equipment at this relocation site and have the ability to submit the
information to the DAQ upon the request of representatives of the director. Please make certain
that the plant operator is aware of all the location specific requirements for this site and the
conditions of the aforementioned AO.
1 , " / â Û Ù Û Ý
DAQC-1001-24
Page 2
Federal New Source Performance Standards Subpart OOO requires that initial Method 9
observations be performed for all applicable portable crushers, screens, and attached conveyors.
Subpart OOO also mandates that all crushers constructed, modified, or reconstructed on or after
April 22, 2008, which are not enclosed, must install spray bars on the equipment and keep
maintenance records to ensure proper spray bar operations.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction
requirements for additional information.
This approval for relocation in no way releases the owner or operator from any liability for
compliance with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation
process please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SW:jl
Enclosure: Submitted Temporary Relocation Form
cc: Central Utah Public Health Department
4 * - - $ . — / F v A ? A C @ C w C F ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Tue, Oct 1, 2024 at 2:15 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Staker Parson d.b.a. Hales Sand & Gravel has requested a Temporary Relocation. Please see the information
below. Any attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-10-01 14:15:17 MDT
IP: 165.225.10.119
ResponseID: R_5HSkMKXywFKedRY
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/
yMzwnWwwQlUBCxL0rwFJVEDHqUhIyq6nKfkZqQnylWnrjvP2hgnTEQrJ%2ErDeX0-3v7cqh3%2E5J7kaAAUMMvg7w-
btMqO7k7dpdNfudiX3g2ws2FHEVAqsxJr8Uk0mtL52apQWrgRrLtyA1X3wcBGzP4Vfyhx1T8wHR-
3SwPYW3hykVbmqpZ1DNJBDMbS9rzVHj7Qr5U-yykzp79hmsJXP6A5eFqqsqkPEahBf1
jlUMHeYEK1A7GORLfdg3PsXcTn442ioh4blsIhyp%2E3xJ%2EdFxBLF-6N1Xklj-3cRDVdePaB%2ExSV-
A84lHgWn5vWi5d59X7wgqqqwN26echF3hDn-Sw
Response Summary:
Please fill out the information below:
Contact Person: Christopher Rose
Company Name: Staker Parson d.b.a. Hales Sand & Gravel
Mailing Address: 89 W 13490 S
City: Draper
Zip: 84020
Phone Number: 3854002119
Email: chris.rose@stakerparson.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
No
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
E7E48AD4A6
Briefly give directions to the site and/or physical address:
350 E 400 N, Centerfield, UT 84622
Proposed Relocation Information:
Closest City Centerfield
County Sanpete
UTM X Coordinates 430632.97 m E
UTM Y Coordinates 4331912.03 m N
Approximate distance to the nearest house/business 1,450 Ft.
UTM X Coordinates to nearest house/business 430688.67 m E
UTM Y Coordinates to nearest house/business 4332343.14 m N
Does this site currently have a permit with DAQ?
10/2/24, 10:14 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1811741915241608170%7Cmsg-f:1811744004546424201&s…1/2
Yes
If yes, what is the Permit (DAQ-AN) # ?
DAQ-390-89
If yes, what is the Permit Holder's Name?
Cox Rock Products
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
EQUIPMENT LEASED FROM WHEELER
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type HSI Crusher and associated diesel generator
Make/Model Astec 4250
Serial or ID# 419935
Manufactured Date 2022
Design Capacity 400 TPH/496 HP
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1FOIpLV5McDSEcJ
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 6 AM
Ending time of operation (am/pm) 10 PM
Maximum hourly production rate for project 400 TPH
Expected startup date 11/15/2024
Expected completion date 11/01/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_3eli869e5yyFOAC
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2cdbpZfv5XmAWr0
10/2/24, 10:14 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1811741915241608170%7Cmsg-f:1811744004546424201&s…2/2