HomeMy WebLinkAboutDAQ-2024-010887
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144820 • Salt Lake City, UT 84114-4820
Telephone (801) 536-4000 • Fax (801) 536-4099 • T.D.D. (801) 903-3978
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF AIR QUALITY
Bryce C. Bird
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
DAQC-980-24
Site ID 10885 (B1)
Christopher Rose
Staker Parson Companies
89 West 13490 South, Suite 100
Draper, UT 84020-7209
Dear Mr. Rose:
Re: Staker Parson Companies – Temporary Relocation/Operation, Notice of Intent – Wasatch
County
Your Notice of Intent dated September 29, 2024, to relocate portable aggregate equipment to the
temporary project for Staker Parson Materials and Construction’s Binggeli Pit, located 3 miles south
of Heber City, UT, was received by the Utah Division of Air Quality (DAQ) and has been reviewed.
The following equipment has been approved for operation for this temporary project:
Remco impact crusher
8x20 screen
745 kW generator
The above equipment has been permitted for operation in the State of Utah by the portable Approval
Order (AO) DAQE-AN115180014-15, dated July 6, 2015. The relocation address is a permitted
facility with established conditions. All equipment operating at this site must be in accordance with the
current AO for this site DAQE-AN108850010-19, dated December 10, 2019. The total production of
aggregate from all temporary projects when combined with the permanent equipment’s production
cannot exceed the 12-month rolling limits as per Condition II.B.1.a.A of this AO. The generator
engines shall use Ultra-Low Sulfur diesel and be operated with an opacity limit of 20%.
Approval is granted to relocate and operate this equipment at the new location for a period not to
exceed 180 operational days. As per Utah Administrative Code (UAC) R307-401-17, the operation of
equipment at this temporary site may be for up to 180 working days in any calendar year not to exceed
365 consecutive days, starting from the initial relocation date. The operational days per site cannot be
extended beyond the stipulated 365 consecutive day period.
1 , " / Û Û Ù Û Ý
DAQC-980-24
Page 2
The owner/operator shall maintain records of the actual operation hours, days, and production rate of
the above referenced equipment at this relocation site and have the ability to submit the information to
the DAQ upon the request of representatives of the Director. Please make certain that the plant
operator is aware of all the location specific requirements for this site and the conditions of the
aforementioned AO.
Utah Division of Water Quality Storm Water Permits and regulations may apply to this temporary
project. Please refer to Utah DEQ Water Quality’s current Storm Water Construction requirements for
additional information.
This approval for relocation in no way releases the owner or operator from any liability for compliance
with all other applicable federal, state, and local regulations including the UAC.
If you have any questions regarding this relocation authorization or the temporary relocation process
please contact Susan Weisenberg at (385) 306-6512.
Sincerely,
Jay P. Morris
Assistant Director
JPM:SPW:jl
Enclosure: Submitted Temporary Relocation Form
cc: Wasatch County Health Department
4 * - - $ . — / @ v A ? A C @ @ w D C ˜
Susan Weisenberg <sweisenberg@utah.gov>
Portable/Temporary Relocation Form
1 message
noreply@qemailserver.com <noreply@qemailserver.com>Sun, Sep 29, 2024 at 1:37 PM
Reply-To: trigger@qemailserver.com
To: sweisenberg@utah.gov
Susan/Chad:
Site # -- Staker Parson Companies has requested a Temporary Relocation. Please see the information below. Any
attachments can be access by clicking on the links.
Recipient Data:
Time Finished: 2024-09-29 13:37:29 MDT
IP: 165.225.10.88
ResponseID: R_7FOFaouFvGFwyAx
Link to View Results: Click Here
URL to View Results: https://utahgov.iad1.qualtrics.com/apps/single-response-reports/reports/zFTxUfO%2ETuxtvFJ2j-
W3%2EutXWcaDF4XkfsY9olzkpohcERbIDb14em72ZDOF3z8oug7NmmrRXkxQUW095-
90d4M22Cw%2EqoAH0Ol9ipmp%2E-xszdy4%2Eu3mLndW6H5WCtXcVMSCCFJr0f7PA
6RvBkWU7LP1LdBEqyZcJE87NyW0I-IUhBqLbOjtn0td%2Er3YUc2bBXpU%2ENVgv45%2E%2ERDdP8b1uQj%
2EALLQHwfHfIENDk4iGctQUIQfz4s-ODtRDiiLprdnLNqIrietWed5JMiscqUXNaXJTI%
2E9O3C3V8vC35bm7Yn5phmmyjJxpAZQDYvh5dtR7P4ltjj5ulIQ7svUD2gQVQ
Response Summary:
Please fill out the information below:
Contact Person: Christopher Rose
Company Name: Staker Parson Companies
Mailing Address: 89 W 13490 S
City: Draper
Zip: 84020
Phone Number: 3854002119
Email: chris.rose@stakerparson.com
Is the site located within a PM2.5 non-attainment and maintenance plan areas on cleared land grea...
No
All temporary relocation projects are required to submit a Fugitive Dust Control Plan (FDCP). Lo...
662F33FBC2
Briefly give directions to the site and/or physical address:
3 Miles South of Heber on Hwy 189, Charleston, UT
Proposed Relocation Information:
Closest City Charleston
County Wasatch
UTM X Coordinates 461567.66 m E
UTM Y Coordinates 4479183.27 m N
Approximate distance to the nearest house/business 1,494 Ft
UTM X Coordinates to nearest house/business 461110.36 m E
UTM Y Coordinates to nearest house/business 4479205.99 m N
Does this site currently have a permit with DAQ?
9/30/24, 9:10 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1811560431859054936%7Cmsg-f:1811560431859054936&s…1/2
Yes
If yes, what is the Permit (DAQ-AN) # ?
DAQE-AN108850010-19
If yes, what is the Permit Holder's Name?
Staker Parson Materials & Construction
Please provide the permit ID for the equipment? (DAQE-XXXXXXXXX-XX)
DAQE-AN115180014-15
Please list all the Equipment on Site:Note: It is important to identify ALL diesel powered engine...
1
Equipment Type Impact Crusher
Make/Model Remco 5056 HSI
Serial or ID# II.A.5
Design Capacity 500 TPH
2
Equipment Type Screen
Make/Model 8x20
Serial or ID# II.A.134
3
Equipment Type Generator
Serial or ID# II.A.774
Design Capacity 745kW
Please attach a site diagram showing the equipment layout and general site dimensions for this re...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_2yjwB0M6NHPhC2j
Have any other state or local regulatory agencies issued any other "Conditional Use Permits" for...
No
Operational Information: (Please note: Operating time over 16 hours in a 24 hour period will re...
Total Hours of operation per 24 hr period 16
Starting time of operation (am/pm) 6 AM
Ending time of operation (am/pm) 10 PM
Maximum hourly production rate for project 250-500 TPH depending on material
Expected startup date 10/11/2024
Expected completion date 10/01/2025
What type of application is this for?
New Application
In accordance with the fee schedule approved by the Utah State Legislature, the Division of Air Q...
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_x4unMd5QUKYHzyx
Owner/Operator Representative:
https://utahgov.co1.qualtrics.com/WRQualtricsControlPanel/File.php?F=F_1CwrO1nGcDbBODM
9/30/24, 9:10 AM State of Utah Mail - Portable/Temporary Relocation Form
https://mail.google.com/mail/u/0/?ik=bffac613d3&view=pt&search=all&permthid=thread-f:1811560431859054936%7Cmsg-f:1811560431859054936&s…2/2