Loading...
HomeMy WebLinkAboutDDW-2024-012011Utah Department Of Environmental Quality Division Of Drinking Water Sanitary Survey Sanitary Survey General System Information Site Visit Date Surveyor Name 09/11/2024 Angela Jones CENTERVILLE CITY WATER SYSTEM PWS ID: UTAH06001 Rating: Approved 10/31/2019 Active 1 Admin Contact (AC) [ eMail address is REQUIRED ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: DAVID OWEN *Last Name: WALKER *Organization: *Address: Redacted *City: CLINTON *State: UT *Zip: 84015 *Email: dave.walker@centervilleutah.gov *Phone: 801-292-8232 Emergency Phone: 801-677-6099 2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: CENTERVILLE CITY *Address: 1250 W 655 N *City: CENTERVILLE *State: UT *Zip: 84014 *Email: *Phone: 801-292-8232 DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 1 of 105 Site Visit Info 3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: CENTERVILLE CITY *Address: 1250 W 655 N *City: CENTERVILLE *State: UT *Zip: 84014 *Email: *Phone: 801-292-8232 4 Direct Operator in Charge (DO) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: MICHAEL SCOT *Last Name: CARLSON *Organization: *Address: 71 E PARK DR *City: KAYSVILLE *State: UT *Zip: 84037 *Email: mcarlson@centervilleut.com *Phone: 801-292-8232 5 Does the system serve a Residential population?Y 5A Population - Residential 17155 5B Operating Period (Start Date) - Residential 01/01 5C Operating Period (End Date) - Residential 12/31 6 Does the system serve a Transient population? (A transient population is a rotating population that is served by a water system that does not remain in the jurisdiction of the water system for long periods of time. Examples of a transient population include, but are not limited to, campers at a campground, users of a highway rest stop, skiers at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.) N 7 Does the system serve a Non-Transient population? (A non-transient population is a population served by a water system that is the same population being served by the system for at least six months of the year, but is not a resident in the system. Examples of a non-transient population include, but are not limited to, employees of a restaurant, shop, or ski resort; teachers and students at a school, day-care center, or church; doctors, nurses, and other employees at a hospital or healthcare clinic.) N 8 Population - Wholesale :0 9 Residential Connections:5051 10 Commercial Connections:213 11 Industrial Connections:3 12 Agricultural Connections:0 DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 2 of 105 Management and Operations 13 Date of Survey (First Day of Field Work)09/11/2024 14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the header ** 09/11/2024 15 Date final report sent to system (questionnaire, deficiency report and capacity spreadsheet) 10/10/2024 16 Water system representative present during the survey:Steven Hunt 17 How much time was spent to prepare survey documents prior to field survey? (Round up to nearest quarter hour) 1.5 18 How much time was spent to complete the field survey (arrival to completion; include travel time between water system facilities)? (Round up to nearest quarter hour) 7 19 How much time was spent traveling from the office to system and back again at the end of the field survey? (Round up to nearest quarter hour) 0.75 20 How much time did it take to finish the Survey Report? (Round up to nearest quarter hour) 7 21 Did you survey multiple water systems in one trip? ... if yes, answer the following question(s) N 22 For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power option. SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system without naturally flowing water sources, such as springs or flowing wells, to have one or more of the system's sources equipped for operation during power outages. To ensure continuous service when the primary power has been interrupted, a redundant power supply is required. A redundant power supply may include a transfer switch for auxiliary power such as a generator or a power supply service with coverage from two independent substations. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: The system is gravity fed. Each well also has a generator.) 23 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a different question] SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 24 Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3) C 25 Does the system haul water?N 26 For a community system serving 100 or more connections, at least 2 water sources are available. SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems serving more than 100 connections to have a minimum of two sources except where served by a water treatment plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 3 of 105 Cross Connection and Operator Certification 27 Does system have a consecutive connection to another water system not listed in the SOURCE section of Waterlink Report? If yes, answer the following question(s) N 28 Does the system have a deficiency meeting the required source capacity? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 29 Does the system have a deficiency meeting the required storage capacity DUE SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 30 Does the system have a deficiency meeting the required equalization storage capacity for indoor/outdoor demands (but not because of fire suppression needs)? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 31 Does your water system have an Emergency Response Plan? REC | 0pts | SM | M001 | R309-105-18 | All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Y 32 Does your Emergency Response Plan address cybersecurity? (required for systems over 3,300 population) MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. Y 33 Does your water system use any computers, laptops, phones, tablets, or any other computer systems to manage, operate, or maintain the PWS (SCADA or Industrial Control Systems)? This includes any water sources, treatment, distribution or any process related to operation function Y 34 Does your water system use any computer systems in regular business operations such as accounting, billing, payroll, human resources, or management? Y 35 Legally adopted authority statement MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). C 36 Documentation of annual public awareness and/or employee training MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. C 37 Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. C 38 Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 4 of 105 General Maintenance and Environment Distribution 39 Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. C 40 Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every community and NTNC water system and public water systems that utilize treatment/filtration to have at least one operator certified at the classified grade of the water system. Certification must be appropriate for the type of system operated (treatment and/or distribution). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 41 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1 hour travel time, under normal work and home conditions, of each drinking water system for which he is considered in direct responsible charge. C 42 Are there any visual indications of unsanitary conditions? SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The Secondary Maximum Contaminant Levels for public water systems deals with substances which affect the aesthetic quality of drinking water. They are presented here as recommended limits or ranges and are not grounds for rejection. The taste of water may be unpleasant and the usefulness of the water may be impaired if these standards are significantly exceeded. R309-105-18 The Director or the local health department shall be informed by telephone by a water supplier of any "emergency situation". The term "emergency situation... R309-215-4(3) If the water fails to meet minimum standards, then certain public notification procedures shall be carried out, as outlined in R309-220. Water suppliers shall also keep analytical records in their possession, for a required length of time, as outlined in R309-105-17. C 43 No unprotected connection between the distribution system and a source of contamination. (If there is an unprotected connection, describe the location in detail.) SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11) C 44 Are air release/vacuum valves in the distribution system? ... if yes, answer the following question(s) Y 44A Open end of vent line covered with #14 mesh screen SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 5 of 105 44B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or one foot above distribution line in a chamber that does not flood. SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: All air relief valves are above ground.) 44C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or sump pump. SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be provided with a drain to daylight, if possible. Where this is not possible, underground gravel-filled absorption pits may be used if the site is not subject to flooding and conditions will assure adequate drainage. Sump pumps may also be considered if a drain to daylight or absorption pit is not feasible. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: All air relief valves are above ground.) 44D Open end of vent line down-turned. SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 45 Water system has a program to maintain, operate, or control the use of fire hydrants. REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the distribution system. In order to protect the quality and integrity of the water, fire hydrant access should be controlled. C 46 Blow offs or air release valves are not directly connected to a sanitary sewer line. SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states blow-offs or air relief valves shall not be connected directly to a sewer. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 47 Blow offs or air release valves do not discharge below flood level in ditches or streams. SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3) C 48 All water mains installed after 1995 that provide fire flow are at least 8 inches in diameter. MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis indicates that required flow and pressures can be maintained by 6-inch lines. C 49 Distribution system capable of providing minimum pressure of 20 psi at all service connections. SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution system shall maintain minimum pressures as required by R309-105-9 at all points of connection under all flow conditions. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 6 of 105 General Disinfection ST007 - OAKRIDGE DRIVE TANK - Proposed WS010 - CITY HALL WELL DUPL WS007 - Inactive (AB - ABANDONED) WS001 - CHURCH WELL 210 E 200 S - Active 50 Was the water system constructed or new portions added after January 1, 2007? ... if yes, answer the following question(s) Y 50A Distribution system capable of maintaining the following pressures at all service connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless otherwise specifically approved by the Director, public water systems constructed after January 1, 2007, shall be designed and shall meet the following minimum water pressures at points of connection: (a) 20 psi during conditions of fire flow and fire demand experienced during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 51 Water system follows AWWA disinfection procedures for new, repaired, or seasonal water mains and tanks. SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and appurtenances shall be disinfected in accordance with AWWA Standard C651. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 52 How often do you periodically disinfect any or all parts of your water system (i.e. batch disinfection) other than for repairs or maintenance? SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of Engineering Plans and Specifications R309-500-6 Plan Approval Procedure. C 54 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 54A When is the anticipated date to request an Operating Permit? Explain in comments...First quarter of 2025 53 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. N (Notes: This was never a facility.) 55 Is this facility Active or Inactive?A 56 Operating Period (Start Date)01/01 57 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 7 of 105 58 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 59 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 60 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 61 Is the well casing vented? ... if yes, answer the following question(s)Y 61A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 61B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 61C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 62 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 62A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 8 of 105 62B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 62C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 63 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 64 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 65 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 66 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 67 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 68 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 9 of 105 WS003 - HOLBROOK WELL - 69 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 70 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 71 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 72 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 73 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 73A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 73B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 73C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 74 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pumps directly to storage tank.) 75 Does well require oil-lubrication?N DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 10 of 105 76 Is this facility Active or Inactive?I 76A Explain why this facility is Inactive (Is this facility in stand-by mode?)This facility is no longer connected to distribution system but due to water rights issues wants to keep as inactive. 77 Operating Period (Start Date)01/01 78 Operating Period (Ending Date)12/31 79 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 80 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 81 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 82 Is the well casing vented? ... if yes, answer the following question(s)N 83 Does the well have a pump to waste line? ... if yes, answer the following question(s)N 84 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. NA (Notes: This facility is no longer connected to system.) 85 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 11 of 105 86 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 87 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 88 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 89 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) D (Notes: This facility is no longer connected to system.) 90 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 91 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 92 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 93 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 94 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 12 of 105 WS004 - ROLLING HILLS WELL - 95 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: This facility is no longer connected to system.) 96 Does well require oil-lubrication?N 97 Is this facility Active or Inactive?I 97A Explain why this facility is Inactive (Is this facility in stand-by mode?)This facility is no longer connected to distribution system but due to water rights issues wants to keep as inactive. 98 Operating Period (Start Date)01/01 99 Operating Period (Ending Date)12/31 100 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 101 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 102 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 103 Is the well casing vented? ... if yes, answer the following question(s)N 104 Does the well have a pump to waste line? ... if yes, answer the following question(s)N 105 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. NA (Notes: This facility is no longer connected to system.) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 13 of 105 106 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 107 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 108 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 109 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 110 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) D (Notes: This facility is no longer connected to system.) 111 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 112 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 113 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 114 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 14 of 105 WS005 - 50E CEN ST LION WELL - Active 115 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 116 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: This facility is no longer connected to system) 117 Does well require oil-lubrication?N 118 Is this facility Active or Inactive?A 119 Operating Period (Start Date)01/01 120 Operating Period (Ending Date)12/31 121 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 122 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 123 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 124 Is the well casing vented? ... if yes, answer the following question(s)Y 124A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 15 of 105 124B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 124C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 125 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 125A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 125B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 125C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 126 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 127 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 128 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 16 of 105 129 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 130 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 131 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 132 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 133 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 134 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 135 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 136 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 136A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 136B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 17 of 105 WS006 - RICKS CREEK WELL - Active 136C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 137 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pumps directly to storage.) 138 Does well require oil-lubrication?N 139 Is this facility Active or Inactive?A 140 Operating Period (Start Date)01/01 141 Operating Period (Ending Date)12/31 142 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 143 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 144 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 145 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 18 of 105 145A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 145B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 145C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 146 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 146A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 146B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 146C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 147 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 148 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 19 of 105 149 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 150 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 151 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 152 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 153 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 154 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 155 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 156 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 157 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 20 of 105 WS007 - CITY HALL WELL - Active 157A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 157B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 157C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 158 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pump directly to storage.) 159 Does well require oil-lubrication?N 160 Is this facility Active or Inactive?A 161 Operating Period (Start Date)01/01 162 Operating Period (Ending Date)12/31 163 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 21 of 105 164 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 165 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 166 Is the well casing vented? ... if yes, answer the following question(s)Y 166A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 166B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 166C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 167 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 167A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 167B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 22 of 105 167C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 168 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 169 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 170 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 171 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 172 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 173 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 174 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 23 of 105 WS008 - PORTER LANE WELL - Exception Granted: R309-204-6(6)(i) | Orignal well log does not make reference to 100-feet of grout seal 175 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 176 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 177 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 178 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 178A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 178B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 178C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 179 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pumps directly to storage.) 180 Does well require oil-lubrication?N 181 Is this facility Active or Inactive?I DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 24 of 105 181A Explain why this facility is Inactive (Is this facility in stand-by mode?)This facility is no longer connected to the distribution system but due to water rights system does not want to list as abandoned. 182 Operating Period (Start Date)01/01 183 Operating Period (Ending Date)12/31 184 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 185 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 186 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 187 Is the well casing vented? ... if yes, answer the following question(s)N 188 Does the well have a pump to waste line? ... if yes, answer the following question(s)N 189 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. D (Notes: This facility is no longer connected to system.) 190 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 25 of 105 191 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 192 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 193 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 194 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) D (Notes: This facility is no longer connected to system.) 195 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 196 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 197 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 198 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. D (Notes: This facility is no longer connected to system.) 199 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 26 of 105 WS009 - CARRINGTON WELL - Active 200 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: This facility is no longer connected to system.) 201 Does well require oil-lubrication?N 202 Is this facility Active or Inactive?A 203 Operating Period (Start Date)01/01 204 Operating Period (Ending Date)12/31 205 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 206 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 207 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 208 Is the well casing vented? ... if yes, answer the following question(s)Y 208A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 27 of 105 208B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 208C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 209 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 209A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 209B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 209C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 210 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 211 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 212 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 28 of 105 213 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 214 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 215 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 216 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 217 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 218 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 219 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 220 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 220A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 220B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 29 of 105 WS011 - CHURCH MAIN WELL - Active 220C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 221 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pumps directly to storage.) 222 Does well require oil-lubrication?N 223 Is this facility Active or Inactive?A 224 Operating Period (Start Date)01/01 225 Operating Period (Ending Date)12/31 226 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 227 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 228 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 229 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 30 of 105 229A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 229B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 229C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 230 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 230A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 230B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 230C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 231 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 232 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 31 of 105 233 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 234 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 235 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 236 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 237 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 238 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 239 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 240 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 241 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 32 of 105 WS012 - CHASE LANE WELL - Active 241A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 241B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 241C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 242 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pumps directly to storage.) 243 Does well require oil-lubrication?N 244 Is this facility Active or Inactive?A 245 Operating Period (Start Date)01/01 246 Operating Period (Ending Date)12/31 247 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 33 of 105 248 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 249 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 250 Is the well casing vented? ... if yes, answer the following question(s)Y 250A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 250B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 250C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 251 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 251A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 251B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 34 of 105 251C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 252 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 253 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 254 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 255 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 256 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 257 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 258 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 35 of 105 ST001 - 1ST SOUTH STORAGE - Active 259 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 260 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 261 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 262 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 262A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 262B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 262C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 263 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. NA (Notes: Pumps directly to storage.) 264 Does well require oil-lubrication?N 265 Is this facility Active or Inactive?A 266 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1540947 DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 36 of 105 267 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 268 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 269 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 270 Are air vents present? ... if yes, answer the following question(s)Y 270A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 270B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 270C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 270D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 37 of 105 271 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 271A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 271B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 271C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 272 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 273 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 274 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 275 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 276 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 38 of 105 ST002 - ISLAND VIEW RESERVOIR - Active 277 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 277A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 277B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 277C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 278 Are the drain line and overflow combined?Y 279 Is this facility Active or Inactive?A 280 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 990962 281 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 282 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 39 of 105 283 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 284 Are air vents present? ... if yes, answer the following question(s)Y 284A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 284B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 284C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 284D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 285 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 285A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 285B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 40 of 105 285C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 286 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 287 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 288 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 289 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 290 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 291 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 291A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 291B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 41 of 105 ST003 - ROLLING HILLS STORAGE - Active 291C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 292 Are the drain line and overflow combined?Y 293 Is this facility Active or Inactive?A 294 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 536159 295 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 296 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 297 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 298 Are air vents present? ... if yes, answer the following question(s)Y 298A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 298B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 42 of 105 298C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 298D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 299 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 299A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 299B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 299C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 300 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 301 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 43 of 105 ST004 - GREEN STEEL TANK - Active 302 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 303 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 304 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 305 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 305A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 305B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 305C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 306 Are the drain line and overflow combined?Y 307 Is this facility Active or Inactive?A 308 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 500000 DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 44 of 105 309 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 310 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 311 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 312 Are air vents present? ... if yes, answer the following question(s)Y 312A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 312B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 312C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 312D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 45 of 105 313 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 313A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 313B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 313C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 314 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 315 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 316 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 317 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 318 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 46 of 105 ST005 - RICKS CREEEK RESERVOIR - Active 319 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 319A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 319B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 319C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 320 Are the drain line and overflow combined?Y 321 Is this facility Active or Inactive?A 322 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1141655 323 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 324 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 47 of 105 325 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 326 Are air vents present? ... if yes, answer the following question(s)Y 326A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 326B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 326C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 326D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 327 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 327A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 327B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 48 of 105 327C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 328 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 329 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 330 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 331 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 332 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 333 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 333A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 333B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 49 of 105 ST006 - PARISH LANE RESERVOIR - Active 333C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 334 Are the drain line and overflow combined?Y 335 Is this facility Active or Inactive?A 336 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1049580 337 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 338 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 339 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 340 Are air vents present? ... if yes, answer the following question(s)Y 340A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 340B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 50 of 105 340C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 340D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 341 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 341A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 341B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 341C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 342 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 343 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 51 of 105 PF001 - ISLAND VIEW -- Pump Stations - Active 344 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 345 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 346 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 347 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 347A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 347B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 347C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 348 Are the drain line and overflow combined?Y 349 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 52 of 105 350 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 351 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 352 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not used to pressurize distribution system.) 353 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 354 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 355 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 356 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 356A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 356B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 53 of 105 PF002 - WEBER -- Pump Stations - Active 356C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 357 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 358 Is this facility Active or Inactive?A 359 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 360 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 361 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not used to pressurize distribution system.) 362 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 363 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 364 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 365 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 54 of 105 PF003 - RICKS CREEK -- Pump Stations - Active 365A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 365B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 365C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 366 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 367 Is this facility Active or Inactive?A 368 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 369 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 370 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not used to pressurize distribution system.) 371 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 55 of 105 PF004 - ROLLING HILLS -- Pump Stations - Active 372 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 373 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 374 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 374A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 374B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 374C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 375 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 376 Is this facility Active or Inactive?A 377 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 378 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 56 of 105 PF005 - PARRISH LANE -- Pump Stations - Active 379 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not used to pressurize distribution system.) 380 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 381 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 382 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 383 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 383A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 383B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 383C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 384 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 385 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 57 of 105 386 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 387 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 388 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not used to pressurize distribution system.) 389 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 390 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 391 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 392 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 392A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 392B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 58 of 105 PF006 - PARK HILLS BOOSTER STATION -- Pump Stations - Active 392C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 393 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 394 Is this facility Active or Inactive?A 395 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 396 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 397 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not used to pressurize distribution system.) 398 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 399 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 400 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 401 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 59 of 105 TP001 - CHURCH WELL CHLORINATOR + FLUORIDE -- Treatment - Chlorination General - Active 401A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 401B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 401C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 402 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C 403 Is this facility Active or Inactive?A 404 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 405 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Primary disinfection not required.) 406 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 407 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No dilution) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 60 of 105 408 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 409 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 410 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 411 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 412 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 412A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 413 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 414 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 415 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 415A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 415B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 415C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C (Notes: 0.8 ppm) 415D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 61 of 105 TP004 - ROLLING HILLS WELL CHLORINATOR +FLUORIDE -- Treatment - Chlorination General - 415E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 416 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 417 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 418 Is this facility Active or Inactive?I 418A Explain why this facility is Inactive (Is this facility in stand-by mode?)This facility is abandoned. The well is no longer connected to the system. 419 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 420 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 421 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 422 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 423 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 62 of 105 TP005 - 50E CEN ST CHLORINATOR + FLUORIDE -- Treatment - Chlorination General - Active 424 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. NA (Notes: This facility is abandoned.) 425 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. NA (Notes: This facility is abandoned.) 426 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. NA (Notes: This facility is abandoned.) 427 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? N 428 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. NA (Notes: This facility is abandoned.) 429 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) NA (Notes: This facility is abandoned.) 430 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) NA (Notes: This facility is abandoned.) 431 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. NA (Notes: This facility is abandoned.) 432 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 433 Is this facility Active or Inactive?A 434 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 63 of 105 435 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required to provide disinfection.) 436 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 437 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No dilution required) 438 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 439 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 440 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 441 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 442 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 442A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 443 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 64 of 105 TP006 - RICKS CREEK WELL CHLORINATOR +FLUORIDE -- Treatment - Chlorination General - Active 444 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 445 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 445A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 445B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 445C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C (Notes: 0.8 ppm) 445D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 445E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 446 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 447 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 448 Is this facility Active or Inactive?A 449 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 450 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required to provide disinfection.) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 65 of 105 451 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 452 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No dilution required.) 453 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 454 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 455 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 456 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 457 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 457A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 458 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 459 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 460 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 66 of 105 TP007 - CITY HALL WELL CHLORINATOR + FLUORIDE -- Treatment - Chlorination General - Active 460A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 460B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 460C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C (Notes: 0.8 ppm) 460D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 460E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 461 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 462 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 463 Is this facility Active or Inactive?A 464 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 465 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required to provide disinfection.) 466 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 67 of 105 467 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: No dilution required) 468 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 469 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 470 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 471 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 472 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 472A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 473 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 474 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 475 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 475A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 475B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 475C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C (Notes: 0.8 ppm) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 68 of 105 TP009 - CARRINGTON WELL CHLORINATOR + FLUORIDE -- Treatment - Chlorination General - Active 475D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 475E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 476 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 477 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 478 Is this facility Active or Inactive?A 479 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 480 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required to provide disinfection) 481 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 482 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 69 of 105 483 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 484 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 485 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 486 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 487 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 487A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 488 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 489 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 490 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 490A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 490B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 490C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C (Notes: 0.8 ppm) 490D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 70 of 105 TP012 - CHASE LANE WELL CHLORINATOR + FLUORIDE -- Treatment - Chlorination General - Active 490E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 491 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 492 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 493 Is this facility Active or Inactive?A 494 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 495 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: No dilution required) 496 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 497 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 498 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 71 of 105 499 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 500 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 501 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 502 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 502A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent flow 503 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 504 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 505 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 505A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 505B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 505C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C (Notes: 0.8 ppm) 505D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 505E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 72 of 105 TP001 - CHURCH WELL CHLORINATOR + FLUORIDE -- Gaseous Chlorination - Active 506 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 507 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 508 Is this facility Active or Inactive?A 509 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required) 510 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 511 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: Not required) 512 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 513 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 514 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 73 of 105 TP004 - ROLLING HILLS WELL CHLORINATOR +FLUORIDE -- Gaseous Chlorination - 515 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 516 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 517 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 518 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 519 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 519A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 519B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 519C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 520 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 521 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: On a form next to the tanks.) 522 Is this facility Active or Inactive?I 522A Explain why this facility is Inactive (Is this facility in stand-by mode?)This facility is abandoned. DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 74 of 105 523 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 524 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. NA (Notes: This facility is abandoned.) 525 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: This facility is abandoned.) 526 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. NA (Notes: This facility is abandoned.) 527 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. NA (Notes: This facility is abandoned.) 528 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 529 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. NA (Notes: This facility is abandoned.) 530 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 531 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 75 of 105 TP005 - 50E CEN ST CHLORINATOR + FLUORIDE -- Gaseous Chlorination - Active 532 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 533 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) N 534 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 535 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: This facility is abandoned.) 536 Is this facility Active or Inactive?A 537 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required to provide disinfection) 538 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 539 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: Not required) 540 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 541 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 542 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 76 of 105 TP006 - RICKS CREEK WELL CHLORINATOR +FLUORIDE -- Gaseous Chlorination - Active 543 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 544 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 545 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 546 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 547 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 547A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 547B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 547C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 548 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 549 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: On a form next to the tanks.) 550 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 77 of 105 551 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required to provide disinfection) 552 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 553 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: Not required) 554 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 555 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 556 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 557 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 558 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 559 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 78 of 105 TP007 - CITY HALL WELL CHLORINATOR + FLUORIDE -- Gaseous Chlorination - Active 560 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 561 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 561A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 561B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 561C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 562 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 563 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: On a form next to the tanks.) 564 Is this facility Active or Inactive?A 565 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required) 566 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 567 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: Not required) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 79 of 105 568 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 569 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 570 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 571 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 572 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 573 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 574 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 575 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 575A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 575B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 80 of 105 TP009 - CARRINGTON WELL CHLORINATOR + FLUORIDE -- Gaseous Chlorination - Active 575C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 576 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 577 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: On a form next to the tanks.) 578 Is this facility Active or Inactive?A 579 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required) 580 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 581 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: Not required) 582 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 583 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 584 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 81 of 105 TP012 - CHASE LANE WELL CHLORINATOR + FLUORIDE -- Gaseous Chlorination - Active 585 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 586 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 587 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 588 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 589 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 589A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 589B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 589C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 590 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 591 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: On a form next to the tanks.) 592 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 82 of 105 593 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Not required) 594 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 595 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. NA (Notes: Not required) 596 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 597 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 598 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 599 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 600 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 601 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 83 of 105 TP001 - CHURCH WELL CHLORINATOR + FLUORIDE -- Fluoridation - Active 602 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 603 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 603A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 603B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 603C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 604 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 605 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: On a form next to the tanks.) 606 Is this facility Active or Inactive?A (Notes: .) 607 Background fluoride level before adding fluoride (in ppm):0.1 (Notes: .) 608 Target dose of fluoride added (in ppm):0.7 (Notes: .) 609 Typical fluoride level after adding fluoride (in ppm):0.6 (Notes: .) 610 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. C (Notes: .) 610A Identify the sampling location of the measured final fluoride level:North East wall (Notes: .) 611 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 84 of 105 612 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. C (Notes: .) 613 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. C (Notes: .) 614 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. C (Notes: .) 615 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. C (Notes: .) 616 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 617 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 618 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 85 of 105 619 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. C (Notes: .) 620 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. C (Notes: .) 621 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N (Notes: .) 622 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: .) 622A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 622B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. C (Notes: .) 622C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 622D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 622E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 622F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 86 of 105 TP004 - ROLLING HILLS WELL CHLORINATOR +FLUORIDE -- Fluoridation - 622G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. C (Notes: .) 622H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. C (Notes: .) 622I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. C (Notes: .) 622J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. C (Notes: .) 623 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: .) 624 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: .) 625 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 626 Is this facility Active or Inactive?I (Notes: .) 626A Explain why this facility is Inactive (Is this facility in stand-by mode?)Abandoned/No Equipment left at this site. 627 Background fluoride level before adding fluoride (in ppm):0 (Notes: .) 628 Target dose of fluoride added (in ppm):0 (Notes: .) 629 Typical fluoride level after adding fluoride (in ppm):0 (Notes: .) 630 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. NA (Notes: .Abando) 631 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 87 of 105 632 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. NA (Notes: Abandon) 633 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. NA (Notes: Abandon) 634 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. NA (Notes: Abandon) 635 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. NA (Notes: Abandon) 636 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 637 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 638 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 88 of 105 639 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. NA (Notes: Abandon) 640 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. NA (Notes: Abandon) 641 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N (Notes: .) 642 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: .) 642A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 642B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. NA (Notes: Abandon) 642C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 642D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 642E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 642F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. NA (Notes: Abandon) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 89 of 105 TP005 - 50E CEN ST CHLORINATOR + FLUORIDE -- Fluoridation - Active 642G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. NA (Notes: Abandon) 642H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. NA (Notes: Abandon) 642I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. NA (Notes: Abandon) 642J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. NA (Notes: Abandon) 643 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: .) 644 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: .) 645 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. NA (Notes: Abandon) 646 Is this facility Active or Inactive?A (Notes: .) 647 Background fluoride level before adding fluoride (in ppm):0.1 (Notes: .) 648 Target dose of fluoride added (in ppm):0.7 (Notes: .) 649 Typical fluoride level after adding fluoride (in ppm):0.6 (Notes: .) 650 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. C (Notes: .) 650A Identify the sampling location of the measured final fluoride level:North wall (Notes: .) 651 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 90 of 105 652 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. C (Notes: .) 653 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. C (Notes: .) 654 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. C (Notes: .) 655 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. C (Notes: .) 656 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 657 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 658 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 91 of 105 659 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. C (Notes: .) 660 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. C (Notes: .) 661 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N (Notes: .) 662 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: .) 662A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 662B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. C (Notes: .) 662C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 662D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 662E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 662F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 92 of 105 TP006 - RICKS CREEK WELL CHLORINATOR +FLUORIDE -- Fluoridation - Active 662G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. C (Notes: .) 662H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. C (Notes: .) 662I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. C (Notes: .) 662J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. C (Notes: .) 663 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: .) 664 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: .) 665 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 666 Is this facility Active or Inactive?A (Notes: .) 667 Background fluoride level before adding fluoride (in ppm):0.1 (Notes: .) 668 Target dose of fluoride added (in ppm):0.7 (Notes: .) 669 Typical fluoride level after adding fluoride (in ppm):0.6 (Notes: .) 670 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. C (Notes: .) 670A Identify the sampling location of the measured final fluoride level:North wall (Notes: .) 671 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 93 of 105 672 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. C (Notes: .) 673 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. C (Notes: .) 674 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. C (Notes: .) 675 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. C (Notes: .) 676 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 677 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 678 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 94 of 105 679 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. C (Notes: .) 680 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. C (Notes: .) 681 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N (Notes: .) 682 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: .) 682A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 682B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. C (Notes: .) 682C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 682D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 682E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 682F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 95 of 105 TP007 - CITY HALL WELL CHLORINATOR + FLUORIDE -- Fluoridation - Active 682G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. C (Notes: .) 682H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. C (Notes: .) 682I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. C (Notes: .) 682J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. C (Notes: .) 683 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: .) 684 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: .) 685 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 686 Is this facility Active or Inactive?A (Notes: .) 687 Background fluoride level before adding fluoride (in ppm):0.1 (Notes: .) 688 Target dose of fluoride added (in ppm):0.6 (Notes: .) 689 Typical fluoride level after adding fluoride (in ppm):0.7 (Notes: .) 690 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. C (Notes: .) 690A Identify the sampling location of the measured final fluoride level:South East wall (Notes: .) 691 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 96 of 105 692 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. C (Notes: .) 693 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. C (Notes: .) 694 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. C (Notes: .) 695 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. C (Notes: .) 696 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 697 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 698 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 97 of 105 699 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. C (Notes: .) 700 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. C (Notes: .) 701 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N (Notes: .) 702 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y (Notes: .) 702A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 702B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. C (Notes: .) 702C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 702D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 702E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 702F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. C (Notes: .) DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 98 of 105 TP009 - CARRINGTON WELL CHLORINATOR + FLUORIDE -- Fluoridation - Active 702G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. C (Notes: .) 702H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. C (Notes: .) 702I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. C (Notes: .) 702J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. C (Notes: .) 703 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N (Notes: .) 704 Is fluoride dry feed equipment used?....if yes, answer the following questions N (Notes: .) 705 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C (Notes: .) 706 Is this facility Active or Inactive?A 707 Background fluoride level before adding fluoride (in ppm):0.25 708 Target dose of fluoride added (in ppm):0.7 709 Typical fluoride level after adding fluoride (in ppm):0.6 710 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. C (Notes: North West wall) 710A Identify the sampling location of the measured final fluoride level:North West wall 711 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 99 of 105 712 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. C 713 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. C 714 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. C 715 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. C 716 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 717 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 718 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 100 of 105 719 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. C 720 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. C 721 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N 722 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y 722A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 722B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. C 722C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 722D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 722E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 722F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 101 of 105 TP012 - CHASE LANE WELL CHLORINATOR + FLUORIDE -- Fluoridation - Active 722G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. C 722H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. C 722I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. C 722J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. C 723 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N 724 Is fluoride dry feed equipment used?....if yes, answer the following questions N 725 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 726 Is this facility Active or Inactive?A 727 Background fluoride level before adding fluoride (in ppm):0.1 728 Target dose of fluoride added (in ppm):0.7 729 Typical fluoride level after adding fluoride (in ppm):0.6 730 Sampling location is present for measuring the final fluoride level (if compliant, answer follow-up question) MIN | 15pts | TR | TF44 | R309-535-5(2)(d)(iii) | A sampling point shall be provided downstream of the fluoridation facility for measuring the fluoride level of treated water. C (Notes: North West wall) 730A Identify the sampling location of the measured final fluoride level:North West wall 731 There is a means to measure the flow of water to be treated SIG | 25pts | TR | TF11 | R309-535-5(2)(d)(i) | A means to measure the flow of treated water shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 102 of 105 732 Fluoride concentrations, including chemical dosage and total water quantity, are calculated daily. Daily operating records reflect chemical dosages and total quantities used. MIN | 15pts | TR | TF20 | R309-105-14(3) | R309-105-14(3) requires all water system using chemical addition or specialized equipment for the treatment of drinking water shall regularly complete operational reports. For a fluoridation facility that does not calculate fluoride concentrations, include field and lab fluoride results. C 733 Fluoride testing instruments are properly verified (zeroed & recorded split samples) or calibrated MIN | 15pts | TR | TF21 | R309-525-25(4) | R309-525-25(4) states all instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. C 734 Fluoride chemicals are stored in covered or unopened shipping containers inside a building. MIN | 15pts | TR | TF06 | R390-535-5(2)(b)(i) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, and away from direct sunlight and a source of heat. C 735 Fluoride injection point shall not be located upstream of lime-soda softening or ion exchange softening process. MIN | 15pts | TR | TF50 | R309-535-5(2)(g)(iii) | Added the following: The fluoride injection point shall not be located upstream of lime softening, iron exchange, or other processes that affect the fluoride level. C 736 Chemicals used for fluoridation meet the NSF/ANSI 60 standard or applicable AWWA standards SIG | 25pts | TR | TF04 | R309-535-5(2)(a)(i) | All chemicals used for fluoridation shall be certified to comply with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 737 Electrical outlet and cord/plug for fluoride feed pump is a non-standard receptacle type without using an adaptor and feed pump is interconnected with a well or a service pump (to ensure that the fluoride feed pump is turned on only when the well or service pump is on and water is flowing in the pipe) SIG | 100pts | TR | TF22 | R309-535-5(2)(f) | Rule requires the electrical outlet used for fluoride feed pump to have interlock protection by being wired with the well or service pump, such that the feed pump is only activated when the well or service pump is on. The rule also prohibits the feed pump from being plugged into a continuously active ("hot") electrical outlet. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 738 Acid-resistant secondary containment is provided and adequately sized for corrosive fluoride solutions. SIG | 25pts | TR | TF26 | R309-535-5(2)(c )(i), (ii) and (iii) | Rule requires secondary containment: for tanks containing corrosive fluoride solutions, to be sized to contain the maximum volume of solution handled, and to be designed to be acid resistant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 103 of 105 739 Vent for the chemical storage, injection and operating areas vents to outside atmosphere and away from air intakes. MIN | 15pts | TR | TF24 | R309-535-5(2)(j)(iii) | The fluoride operating area shall be vented to outside atmosphere and away from air intakes. C 740 Incompatible chemicals are not stored in fluoride storage or injection areas. MIN | 15pts | TR | TF28 | R309-535-5(2)(b)(i) - (iv) | Fluoride chemicals shall be stored in covered or sealed containers, inside a building, away from direct sunlight and a source of heat, and not be stored with incompatible chemicals. Bags or other containers for dry materials shall be stored on pallets. Containers for dry materials shall be kept closed to keep out moisture. C 741 Has any electrical or SCADA work been done recently that could affect the original design or fluoride control settings?"... If the answer is yes, answer the next question. N 742 Is fluorosilicic acid used for fluoridation? ... if yes, answer the following questions Y 742A Acid solution tank is mounted on a scale or has other means of measuring the quantity of fluoride used each day (such as level indicator or loss-of-weight recorder). SIG | 25pts | TR | TF14 | R309-535-5(2)(d)(ii) | A means shall be provided to measure the solution level in a tank and the quantity of the chemical used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 742B Solution tanks for fluorosilicic acid are vented to atmosphere outside the building (away from air intake). MIN | 15pts | TR | TF29 | R309-535-5(3)(b)(ii) | Rule requires solution tanks at fluorosilicic acid installations to vent to the outside, above grade, away from air intakes, and where least susceptible to contamination. C 742C Neutralizing chemical is available for immediate use in case of acid spill SIG | 25pts | TR | TF42 | R309-535-5(3)(e) | A neutralizing chemical shall be available on site to handle small quantity accidental acid spills. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 742D Deluge shower and eyewash station are provided. The emergency shower and eye wash station should be located close to, but outside of, the fluorosilicic acid operating area. SIG | 25pts | TR | TF15 | R309-535-5(3)(d) | Emergency eyewash stations and showers shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 742E Appropriate acid-resistant personal protective equipment provided for operators (including eye or face protection gear for handling acid, acid resistant long rubber gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 742F If acid bulk storage tank and day tank are present and there is a risk of solution overflow from the bulk tank to the day tank, each tank is provided with separate vent. MIN | 15pts | TR | TF31 | R309-535-5(3)(b)(iii) | Rule prohibits a bulk tank from sharing a vent with a day tank if there is a risk of solution overflow from the bulk tank to the day tank. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 104 of 105 742G If there is a transfer pump between the acid bulk storage tank and the day tank, there is a means to stop the transfer of acid in case of transfer pump failure. REC | 0pts | TR | TF32 | recommendation | A means to stop the transfer pump will protect the operator and minimize possible acid spill. C 742H Emergency shutoff is near the entrance of the fluoride operating area to turn off the transfer pump or injection pump in case of acid spill REC | 0pts | TR | TF33 | recommendation | Having an emergency shutoff near the entrance of the fluoride operating area will better protect the operator and minimize the need of entering the operating area during acid spill. C 742I Means provided to handle catastrophic failure of acid bulk storage tank. REC | 0pts | TR | TF34 | recommendation | Water system should have an operation plan in place and provide adequate training to the operators for responding to catastrophic failure of acid bulk storage tank. C 742J There is a seismic restraint system for the acid bulk storage tank. REC | 0pts | TR | TF35 | recommendation | The acid bulk storage tank should be adequately restrained to prevent catastrophic failure in case of seismic event. C 743 Is a saturator used for fluoridation? ... if yes, answer the following question(s)N 744 Is fluoride dry feed equipment used?....if yes, answer the following questions N 745 Appropriate personal protective equipment provided for operators (including NIOSH approved respirator and chemical/dust-resistant safety goggles for saturators and dry feeders, acid-resistant gloves, apron or coverall, and boots) SIG | 25pts | TR | TF13 | R309-535-5(3)(f), R309-535-5(4)(h), R309-535-5(5)(e) | The use of personal protective equipment (PPE) is required when handling fluorisilicic acid and dry chemicals. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 10/10/2024 07:32:08 | Rating: Approved UTAH06001 CENTERVILLE CITY WATER SYSTEM page 105 of 105