HomeMy WebLinkAboutDERR-2024-011271GEORGE STURM
UTAH STATE FUEL NETWORK
4315 S 2700 W
SALT LAKE CITY, UT 84129
RE:Request for Petroleum Storage Tank Records
CAPITOL BOILER, located at CAPITOL PLAZA, STATE CAPITOL, SALT LAKE CITY
Facility Identification No. 4001152
Dear GEORGE STURM:
PST operators are required to ensure that certain tests are conducted for their tank system.
Dates highlighted in "Yellow" - tests are due soon.
Dates highlighted in "Red" - tests are due and you are out of compliance.
Tank ID/Alt
ID
Description LTT
--------------------
LLD
Spill Bucket
--------------------
Overfill
Tank or Flex
--------------------
Pipe CP
ATG
--------------------
Sump
7/7 Diesel-Diesel #2 (U.L.S.)-19703 10/10/2024 8/3/2024 N/A 10/10/2024
10/10/2024 8/3/2024 N/A N/A
8/8 Diesel-Diesel #2 (U.L.S.)-19703 10/10/2024 8/3/2024 N/A 10/10/2024
10/10/2024 8/3/2024 N/A N/A
LTT - Line Tightness Test
LLD - Line Leak Detector
Overfill ±Overfill Device
Tank or Flex/Pipe CP - Corrosion Tests
ATG ±Automatic Tank Gauging
Sump - Tank Top Sump and applicable Dispenser Sumps
Please note that UDC tests are not listed, but are required on your facility's next sump test
cycle starting July 1, 2023, if applicable. Also, effective immediately pressure vent valves
must be tested every three years for gasoline tanks.
Please submit a copy of the required tests to the DERR within 30 days of the date due.
If you have any questions please call DeAnn Rasmussen at 801-536-4100.
195 North 1950 West - Salt Lake City, UT
Mailing Address: - P.O. Box 144840 - Salt Lake City, UT 84114-4840
Telephone (801) 536-4100 - Fax (801) 359-8853 - T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper
September 11, 2024
State of Utah
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF ENVIRONMENTAL
RESPONSE AND REMEDIATION
Brent H. Everett
Director
APPLIED ENVIRONMENTAL SERVICES, L.C.
PO BOX 1073 BOUNTIFUL, UTAH 84011 801-540-9258
TEI 5000 NON VOLUMETRIC, TEI 4000 VOLUMETRIC, TEI ULLAGE, TEI LT3
PRECISION TANK & LINE TEST RESULTS SUMMARY
INVOICE ADDRESS:TANK LOCATION: WORK ORDER #
TECH # 94027
TECHNICIAN: SM
STATE TECH #
STATE FUEL NETWORK
PO BOX 141152
SALT LAKE CITY, UTAH 84141-1152
UTAH STATE CAPITOL
CENTRAL HEAT / EMG
SALT LAKE CITY, UTAH
24107
UT 0121
DATE:
10-3-2024
TIME START:
10:00
TIME END:
15:00
GROUNDWATER DEPTH:
N/A DW TKS
TANK TANK
CAPACITY
19703
19703
PRODUCT
DSL
DSL
TANK
PASS
PASS
VENT
PASS
PASS
PRODUCT
LINE
PASS
PASS
LINE LEAK
DETECTOR
PASS
PASS
WATER IN
TANK
0.0"
0.0"
PUMP
TYPE
PRESS
PRESS
TANK
MATERIAL
DWF
DWF
1.
2.
3.
4.
5.
6.
PRODUCT LINES TESTED AT 50 PSI FOR 15 MIN
LINE RATES (GPH)
1.
2.
3.
5.
6.
DSL -.020
ADDITIONAL INFORMATION:PRODUCT LINES ARE MANIFOLDED , LINE AND LEAK DETECTORS TESTED
WHERE THEY ENTER BUILDING WITH SUPPLY AND RETURN VALVES CLOSED THAT GO TO BOILER AND
GENERATOR.
CERTIFIED TECHNICIAN SIGNATURE:DATE:10-3-2024
These systems meet all requirements set forth by USEPA 40 CFR and has received third party certification.
4.
TEST METHODS USED FOR THIS LOCATION
TEI 5000 NON VOLUMETRIC TANK TEST TEI 4000 VOLUMETRIC TANK TEST TEI TANK ULLAGE TEST TEI LT3 LINE TESTX X
LINE LEAK DETECTOR TYPE & SIMULATED LEAK RATE
1.
2.
3.
M = MECHANICAL E = ELECTRONIC # = (GPH) RATE
4.
5.
6.
M 3
M 3
All tests were performed according to manufacturer protocol, and within the common practices of the industry. However due to the variables of
tightness testing, these results cannot be guaranteed. There are no warranties expressed, written or implied.
DEQ ID#4001152
Digitally signed by STEVEN B MARTIN
cn=STEVEN B MARTIN, o=AES, c=US
Date: 2024.10.06 10:59:32 -07'00'
Reason: I am the author of this document
UTAH STATE CAPITOL
CENTRAL HEAT / EMERGENCY GEN
SALT LAKE CITY, UTAH
4001152
STATE FUEL NETWORK
APPLIED ENVIRONMENTAL SERVICES
PO BOX 141152
SALT LAKE CITY, UT
BRETT GURNEY 385-602-4872
801-540-9258 10-3-2024
SO 1
DSL
RED J
FX
X
30
28
500
3
10
3
X
X
X
NO 2
DSL
RED J
FX
X
30
28
500
3
11
3
X
X
X
TESTED WITH SUPPLY AND RETURN CLOSED WHERE IT ENTERS BUILDING, MANIFOLDED PRODUCT LINES
NON CONVENTIONAL FUEL SITE
STEVEN B MARTIN
Digitally signed by STEVEN B MARTIN
cn=STEVEN B MARTIN, o=AES, c=US
Date: 2024.10.06 11:01:49 -07'00'
Reason: I am the author of this document
UST OVERFILL EQUIPMENT INSPECTION
AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE
Facility Name:
Address:
City, State, Zip Code:
Facility I.D. #
Testing Company:
This data sheet is for inspecting automatic shutoff devices and ball float valves. See PEI/RP 1200, Section 7 for inspection procedures.
Owner:
Address:
City, State, Zip Code:
Phone#
Tester Phone#
Product Grade:
Tank Number:
Tank Volume, gallons:
Tank Diameter, inches:
Overfill Prevention Device Brand:
Overfill Type
AUTOMATIC SHUTOFF DEVICE INSPECTION
1. Drop tube removed from tank?
2. Drop tube and float mechanisms
are free of debris?
3. Float moves freely without
binding and poppet moves into
flow path?
4. Bypass valve in the drop
tube is open and free of
blockage (if present)?
5. Flapper is adjusted to shut off
flow at 95% ?*
A "NO" to any item in Lines 1-5 indicates a test failure.
BALL FLOAT VALVE INSPECTION * *
1. Tank top fittings are
vapor-tight and leak free?
2. Ball float cage free of debris?
3. Ball free of holes and cracks
and moves freely in cage?
4. Vent hole in pipe open and
near top of tank?
5. Ball float pipe is proper length
to restrict flow at 90% capacity?***
A "NO" to any item in Lines 1-5 indicates a test failure.
Test Results:
* Use manufacturer's suggested proceedure for determining if automatic shutoff device will shut off flow at 95% capacity.
Tester's Name:
UTAH STATE CAPITOL
CENTRAL HEAT PLANT / EMG
SALT LAKE CITY, UTAH
4001152
AES UTAH LICENCE # UT 0121
STATE FUEL NETWORK
PO BOX 841152
SALT LAKE CITY, UTAH 84141-1152
BRETT GURNEY 385-602-4872
801-540-9258
Date: 10-3-2024
DSL
1
19703
119
FRANKLIN
AUTOMATIC
YES
YES
YES
YES
DSL
2
19703
119
FRANKLIN
AUTOMATIC
YES
YES
YES
YES
Steven B. Martin Testers Signature:
* * If a ball float is found to fail the inspection , another method of overfill must be used.
* * * Use manufacturer's suggested procedure for determining if flow restriction device will restrict flow at 90% capacity.
Comments
PASS PASS
Digitally signed by STEVEN B MARTIN
cn=STEVEN B MARTIN, o=AES, c=US
Date: 2024.10.06 11:21:33 -07'00'
Reason: I am the author of this document
SPILL PREVENTION TEST
Spill Bucket Hydrostatic Test Form
Facility Name Facility ID
Address Tester's Name
Test Date Phone
Tank Number
Product Stored
Capacity
Manufacturer
Construction
Liquid and Debris
Removed
Visual Inspection
No cracks, holes,
or separations
Tank Riser Cap
Included in Test
Is Drain Valve
Included in Test
Start Level
Start Time
Ending Level
End Time
Test Period
(minimum of 1 hour)
Change in Level
Test Results
Photos indicating water
Levels are Attached?
Pass / Fail Criteria: Must pass visual inspection, test duration at least one hour, must include photos with this
form, water level drop of less than 1/8 inch. Ref: PEI / RP 1200 6.2.5 Test Procedure
How was Liquid Disposed?
Comments
I certify under penalty of law that the above information is true, accurate and complete
Tester's Signature
UTAH STATE CAPITOL 4001152
CENTRAL HEATPLANT / EMG GEN
SALT LAKE CITY, UTAH
STEVEN MARTIN AES TESTING
10-3-2024 801-540-9258
1
DSL SO
5
OPW
SW
YES
PASS
NO
YES
10 3/4
12:48
10 3/4
13:51
1 HR 3 MIN
0
PASS
NO
2
DSL NO
5
OPW
SW
YES
PASS
NO
YES
11 7/8
12:48
11 7/8
13:51
1 HR 3 MIN
0
PASS
NO
REUSED
Digitally signed by STEVEN B MARTIN
cn=STEVEN B MARTIN, o=AES, c=US
Date: 2024.10.06 11:53:37 -07'00'
Reason: I am the author of this document
AUTOMATIC TANK GAUGE OPERATION INSPECTION
Facility Name:
Address:
City, State, Zip Code:
Facility I.D. #
Testing Company:
Owner:
Address:
City, State, Zip Code:
Phone #
Testers Phone #
Date:
This procedure is to determine whether the ( ATG) is operating properly. See PEI/RP1200 Section 8.2 for the proper inspection procedure.
Tank Number
Product Stored:
ATG Brand and Model
1. Tank Volume, gallons
2. Tank Diameter, inches
3. After removing the ATG from the tank, has it
been inspected and any damaged or missing
parts replaced?
4. Float moves freely on the stem without
5. Fuel float level agrees with the
value programmed into the console?
6. Water float level agrees with the value
programmed into the console?
7. Inch level from bottom of stem when 90%
alarm is triggered.
8. Inch level at which the overfill alarm
activates corresponds with value programmed
in the gauge?
9. Inch level from the bottom when the water
float first triggers an alarm.
10. Inch level at which the float alarm activates
corresponds with value programmed in the
gauge?
If any answers in Lines 3,4,5, or 6 are "NO" the system has failed the test.
TEST RESULTS
Comments:
Testers Name: Steven B. Martin Testers Signature:
UTAH STATE CAPITOL
CENTRAL HEAT / GEN
SALT LAKE CITY, UTAH
4001152
AES UTAH TESTER # UT 0121
STATE FUEL NETWORK
PO BOX 141152
SALT LAKE CITY, UTAH 84141-1152
BRETT GURNEY 385-602-4872
801-540-9258
10-3-2024
1
DSL
TLS 350
19703
117.75
YES
YES
YES
YES
99
YES
2.0
YES
2
DSL
TLS 350
19703
117.75
YES
YES
YES
YES
99
YES
2.0
YES
PASS PASS
BATTERY BACKUP FUNCTIONS PROPERLY
SETUP REPORT PRINTED
Digitally signed by STEVEN B MARTIN
cn=STEVEN B MARTIN, o=AES, c=US
Date: 2024.10.06 11:17:54 -07'00'
Reason: I am the author of this document