HomeMy WebLinkAboutDSHW-2024-008593CORRECTIVE ACTION SECTION – SITE VISIT REPORT
SITE NAME: _Gordo__________________________________ DATE: _9____/__26____/__2024____
EPA ID #: _________________________________________ UTCA ID#: __UTCA-0069___________
LOCATION: _Kearns Blvd and Richardson Flat Rd, Park City, Utah________________________________
PROJECT MANAGER: ____________________________________________________________________
SITE STATUS
___ Active Investigation
_X_Ongoing Cleanup Activities
___Confirmation Sampling
___ Long-term Institutional Controls in-place [Site
Management Plan (SMP), Environmental
Covenant (EC), and/or Post Closure Plan (PCP)]
___ Long-term Groundwater Monitoring
OTHER (describe):
PURPOSE OF SITE VISIT
___Drive-by (windshield survey)
___Sample Observation &/or Collection
___Site Investigation
_X_Cleanup Activities Inspection
___Confirm Current Land Usage
___ Confirm Cleanup Completed
___ Confirm Integrity of Engineering Controls
___ Confirm Compliance with SMP/EC
D2# for SMP/EC: DSHW-________-
_______________
___ Post-Closure Permit Verification
___ Document Change in Land Usage
OTHER (describe)
FIELD OBSERVATIONS:
- Terracon not onsite. Kolter Dudley with the excavation contractor onsite operating the trackhoe.
- Soil is being excavated from the higher contamination within Zone 1. Most of the soil stockpile
has been removed.
- Decontamination station is set up at the exit from Zone 1.
- Contractor is spraying water on the site and access road for dust suppression.
- Side-dump trucks loaded with excavated soil are covered for transport.
- Mr. Dudley estimated that soil excavation will continue for another week.
SAMPLE COLLECTION
Were Environmental Samples Collected per the approved Sampling & Analysis Plan?
YES ___ NO ___ N/A _X_
COMMENTS:
Sampling was not conducted during the site visit.
Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)?
YES _X_ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
CURRENT LAND USAGE
___ Residential
___ Commercial
___ Industrial
___ Mixed Commercial w/ Residential
___ Under Construction &/or Development
_X_ Other: _Open land______________________
COMMENTS:
FUTURE LAND USAGE
___ Residential ___ Mixed Commercial w/ Residential
___ Commercial ___ Other: (describe below)
___ Industrial _X_ Unknown at this time
COMMENTS:
POST-CLEANUP SITE VISITS
Is the Completed Cleanup Remedy Still Protective Based on Current Land Use?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
N/A
LONG-TERM INSTITUTION CONTROL(S) VERIFICATION
Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with?
YES ___ NO ___ Unknown (Drive-By Inspection Only) ___
COMMENTS:
N/A
SITE VISIT CONCLUSIONS
Soil remediation appears to be conducted according to the Corrective Action Plan.
RECOMMENDATIONS
No recommendations.
ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO ___
SIGNATURE:
Gordo – September 26, 2024 Photos:
Loading excavated soils from the higher contamination area of Zone 1 – south side.
Perspective view of the depth of the remaining soil stockpile.
Another view of the remaining soil stockpile – photo from the east side of the site.
Water truck spraying the site to control dust.