Loading...
HomeMy WebLinkAboutDSHW-2024-008592CORRECTIVE ACTION SECTION – SITE VISIT REPORT SITE NAME: _Gordo__________________________________ DATE: _9____/__26____/__2024____ EPA ID #: _________________________________________ UTCA ID#: __UTCA-0069___________ LOCATION: _Kearns Blvd and Richardson Flat Rd, Park City, Utah________________________________ PROJECT MANAGER: ____________________________________________________________________ SITE STATUS ___ Active Investigation _X_Ongoing Cleanup Activities ___Confirmation Sampling ___ Long-term Institutional Controls in-place [Site Management Plan (SMP), Environmental Covenant (EC), and/or Post Closure Plan (PCP)] ___ Long-term Groundwater Monitoring OTHER (describe): PURPOSE OF SITE VISIT ___Drive-by (windshield survey) ___Sample Observation &/or Collection ___Site Investigation _X_Cleanup Activities Inspection ___Confirm Current Land Usage ___ Confirm Cleanup Completed ___ Confirm Integrity of Engineering Controls ___ Confirm Compliance with SMP/EC D2# for SMP/EC: DSHW-________- _______________ ___ Post-Closure Permit Verification ___ Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: - Terracon not onsite. Kolter Dudley with the excavation contractor onsite operating the trackhoe. - Soil is being excavated from the higher contamination within Zone 1. Most of the soil stockpile has been removed. - Decontamination station is set up at the exit from Zone 1. - Contractor is spraying water on the site and access road for dust suppression. - Side-dump trucks loaded with excavated soil are covered for transport. - Mr. Dudley estimated that soil excavation will continue for another week. SAMPLE COLLECTION Were Environmental Samples Collected per the approved Sampling & Analysis Plan? YES ___ NO ___ N/A _X_ COMMENTS: Sampling was not conducted during the site visit. Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES _X_ NO ___ N/A ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: CURRENT LAND USAGE ___ Residential ___ Commercial ___ Industrial ___ Mixed Commercial w/ Residential ___ Under Construction &/or Development _X_ Other: _Open land______________________ COMMENTS: FUTURE LAND USAGE ___ Residential ___ Mixed Commercial w/ Residential ___ Commercial ___ Other: (describe below) ___ Industrial _X_ Unknown at this time COMMENTS: POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES ___ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: N/A LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with? YES ___ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: N/A SITE VISIT CONCLUSIONS Soil remediation appears to be conducted according to the Corrective Action Plan. RECOMMENDATIONS No recommendations. ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO ___ SIGNATURE: Gordo – September 26, 2024 Photos: Loading excavated soils from the higher contamination area of Zone 1 – south side. Perspective view of the depth of the remaining soil stockpile. Another view of the remaining soil stockpile – photo from the east side of the site. Water truck spraying the site to control dust.