Loading...
HomeMy WebLinkAboutDSHW-2024-008548CORRECTIVE ACTION SECTION – SITE VISIT REPORT SITE NAME: Ninigret Eastern Alum Ponds DATE: 09 / 12 / 2024 EPA ID #: UTD009073800 UTCA ID#: N/A LOCATION: 1700 South 4650 West, Salt Lake City, UT PROJECT MANAGER: Ethan Upton SITE STATUS ___ Active Investigation ___Ongoing Cleanup Activities ___Confirmation Sampling _X_ Long-term Institutional Controls in-place [Site Management Plan (SMP), Environmental Covenant (EC), and/or Post Closure Plan (PCP)] __ Long-term Groundwater Monitoring OTHER (describe): PURPOSE OF SITE VISIT _X_Drive-by (windshield survey) ___Sample Observation &/or Collection ___Site Investigation ___Cleanup Activities Inspection _X_Confirm Current Land Usage ___ Confirm Cleanup Completed ___ Confirm Integrity of Engineering Controls _X_ Confirm Compliance with SMP/EC D2# for SMP/EC: DSHW-2022-017482, DSHW-2008-001391 ___ Post-Closure Permit Verification ___ Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: The Site continues to be used for industrial/commercial purposes. The Brighton canal appears to remain untouched as was observed historically with no re-routing. During the Site visit it was observed that a large area was being developed with excavation and regrading occurring. According to the Site Management Plan and Environmental Covenant, the soil (within risk range for a construction worker) is allowed to be excavated. However, construction workers should be notified of potential hazardous and possible exposure to Site contaminants. The soil appears to remain on-Site (no removal of Site soils) and used to grade the land for development at the Site. See images attached. SAMPLE COLLECTION Were Environmental Samples Collected per the approved Sampling & Analysis Plan? YES ___ NO ___ N/A _X_ COMMENTS: Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES ___ NO ___ N/A _ X_ Unknown (Drive-By Inspection Only) ___ COMMENTS: CURRENT LAND USAGE ___ Residential _X_ Commercial _X_ Industrial ___ Mixed Commercial w/ Residential ___ Under Construction &/or Development ___ Other: __________________________________ COMMENTS: FUTURE LAND USAGE ___ Residential ___ Mixed Commercial w/ Residential _X_ Commercial ___ Other: (describe below) _X_ Industrial ___ Unknown at this time COMMENTS: POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES ___ NO ___ Unknown (Drive-By Inspection Only) _X_ COMMENTS: LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with? YES _X_ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: SITE VISIT CONCLUSIONS The Site appears to be in compliance with the SMP and EC. Observations of the area being developed should be made during the next SMP inspection. RECOMMENDATIONS N/A ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO __ SIGNATURE: