HomeMy WebLinkAboutDSHW-2024-008494 IGES NORTH POINTE SOLID WASTE SSD CEDAR VALLEY C&D LANDFILL (NORTH AREA) 2024 Final Cover QA/QC Plan 1 | Page Contents PART 1 – GENERAL REQUIREMENTS ............................................................................................................. 2 1.1 Purpose ....................................................................................................................................... 2 1.2 Document Format ....................................................................................................................... 2 1.3 Definitions ................................................................................................................................... 2 1.4 Meetings ..................................................................................................................................... 3 1.5 Responsibilities of Personnel ...................................................................................................... 4 1.6 Construction Documents ............................................................................................................ 5 PART 2 – CONSTRUCTION QUALITY ASSURANCE .......................................................................................... 5 2.1 Introduction ................................................................................................................................ 5 2.2 Material Evaluation ..................................................................................................................... 5 2.3 Construction Testing ................................................................................................................... 5 2.4 Monitoring Requirements ........................................................................................................... 6 2.5 Documentation and Control of Nonconformance ...................................................................... 6 2.6 Construction Surveys .................................................................................................................. 7 2.7 Revegetation ............................................................................................................................... 7 PART 3 – DOCUMENTATION .......................................................................................................................... 8 3.1 Recordkeeping ............................................................................................................................ 8 3.2 Final Construction Report ........................................................................................................... 9 TABLE 1 ................................................................................................................................................... 10 APPENDIX A – DRAWINGS 1. Closure Stages 2. Closure Plan View 3. SecAon View & Details APPENDIX B – QA/QC FORMS 1. Weekly/Monthly Field Log 2. Problem IdenAficaAon/CorrecAve AcAon APPENDIX C – Geotechnical Test Results 2 | Page PART 1 – GENERAL REQUIREMENTS 1.1 Purpose The purpose of this plan is to describe the quality assurance procedures to be uAlized during the construcAon of the final soil cover at the north area of the North Pointe Solid Waste ConstrucAon and DemoliAon Landfill (Landfill). The Landfill will be closed in a series of Stages with the first Stage being complete in the fall of 2024. The primary goals of the quality assurance program are to: • Determine if proper construcAon techniques, materials, and procedures are used. • Determine if the intent of the construcAon documents is met. • IdenAfy construcAon problems and provide a method for resoluAon of any problem. • Document the construcAon acAviAes. Upon the compleAon of each final cover Stage construcAon; a final construcAon documentaAon package will be prepared and submi`ed to the State of Utah Division of Waste Management and RadiaAon Control (UDWMRC) for approval. 1.2 Document Format The Quality Assurance Plan is divided into three secAons to idenAfy; 1) the general informaAon and personnel associated with the project; 2) the detailed requirements of the quality assurance program; and 3) the documentaAon and record keeping associated with the construcAon. 1.3 Defini6ons The following are definiAons that are uAlized in this document and without definiAons may be taken out of context: As-Built Drawings – Drawings recording the constructed dimensions, and details. ASTM – American Society for TesAng and Materials. Construc6on Team – The North Pointe staff responsible for the placement of cover soils. Engineer – The person or firm (IGES Inc.) responsible for the development of the Quality Assurance Plan. Landfill Manager – Owner’s representaAve on site (TBD), who is responsible for all construcAon acAviAes. Nonconformance – A deficiency in characterisAc, documentaAon, or procedure that renders the quality of an item or acAvity unacceptable or indeterminate. Examples of 3 | Page nonconformances include, but are not limited to, physical defects, test failures, or inadequate documentaAon. Owner – North Pointe Solid Waste Special Service District (North Pointe). Opera6ons Supervisor – Owner’s representaAve on site (TBD), who is responsible for coordinaAon of final cover construcAon. Project Documents – ConstrucAon Drawings and this quality assurance plan. Quality Assurance/Quality Control – A planned and systemaAc pa`ern of procedures and documentaAon designed to provide adequate confidence that materials or services meet contractual and/or regulatory requirements, and that these materials will perform saAsfactorily in service. Quality Assurance/Quality Control will be performed by the Owner. Quality Assurance Inspector – The Quality Assurance Inspector for the final cover placement will be the Landfill Manager. Quality Assurance Manager – Not uAlized for this project. Quality Control Inspector – The Quality Control Inspector for the final cover placement will be the Lead Operator. Quality Control Manager – Not uAlized for this project. Quality Assurance Plan - A planned series of observaAons and tests designed to provide adequate confidence that materials and services meet contractual and/or regulatory requirements. State of Utah – State of Utah Division of Waste Management and RadiaAon Control (DWMRC) is the agency responsible for permifng landfills in Utah. 1.4 Mee6ngs PreconstrucAon and postconstrucAon meeAngs will be held in associaAon with each Stage of the final cover construcAon at the Landfill. The meeAngs are intended to facilitate the cover construcAon and minimize the potenAal for errors. The Landfill Manager will conduct and document all meeAngs. A. PreconstrucAon MeeAng – A preconstrucAon meeAng will be held with representaAves from the Owner, DWMRC staff, the Engineer, and the ConstrucAon Team. The “for construcAon” documents, quality assurance plan, tesAng requirements, reporAng procedures, and overall project responsibiliAes of all parAes will be reviewed at the meeAng. 4 | Page B. Progress MeeAngs – Progress meeAngs are not anAcipated. Progress meeAngs will be scheduled as necessary. If a progress meeAng is scheduled, representaAves from the Owner, DWMRC staff, the Engineer, and ConstrucAon Team will a`end. The purpose of the progress meeAngs will be to discuss progress, idenAfy problems (and correcAve acAons), review test data, and coordinate work acAviAes including tesAng. C. PostconstrucAon MeeAng – A postconstrucAon meeAng will be held with representaAves from the Owner, DWMRC staff, the Engineer, and the ConstrucAon Team. The final cover construcAon work and documentaAon will be reviewed and compared to the Quality Assurance Plan for completeness. If adequate documentaAon is not included, addiAonal test pits may need to be excavated to demonstrate cover soil thickness. 1.5 Responsibili6es of Personnel A. ResponsibiliAes of the Landfill Manager – The Landfill Manager is the primary Owner’s representaAve on the project. The Landfill Manager defines the overall project scope and is responsible for the implementaAon of all construcAon related acAviAes. The Landfill Manager is the point of contact for all communicaAons. B. ResponsibiliAes of the Quality Assurance Inspector – The Landfill Manager will funcAon as the Quality Assurance Inspector. C. ResponsibiliAes of the Quality Assurance Manager – Not uAlized for this project. D. ResponsibiliAes of the Quality Control Inspector – The Quality Control Inspector will be a representaAve of the ConstrucAon Team responsible for the day-to-day Quality Control acAviAes performed on-site. E. ResponsibiliAes of the Quality Control Manager – Not uAlized for this project. F. ResponsibiliAes of Engineer – The engineer is the person or firm (IGES) responsible for the development of the quality assurance plan and will be available for clarificaAon of the plan during construcAon if necessary. G. ResponsibiliAes of UDWMRC – The UDWMRC is the permifng agency responsible for the oversight of all landfilling acAvity in the State. UDWMRC is responsible to review and approve the quality assurance plan developed by the engineer. The UDWMRC will be available for clarificaAon of the approved plan or State related concerns if necessary. 5 | Page 1.6 Construc6on Documents A. ConstrucAon Drawings – Appendix A contains the plans for the final cover construcAon at the north area of the Landfill. A preconstrucAon survey of the exisAng landfill cover (in the area to be closed) may be uAlized to document the preconstrucAon grade and serve as a basis for a post construcAon survey uAlized to demonstrate cover thickness. AlternaAvely, Landfill personnel may elect to install grading stakes to indicate required cover thickness, or to dig test holes in the final cover once soil grading is complete. B. SpecificaAons – The only project specificaAons for the cover construcAon is presented in Part 2. C. Forms – The forms required to document the final cover construcAon are include in Appendix B. PART 2 – CONSTRUCTION QUALITY ASSURANCE 2.1 Introduc6on This secAon describes the monitoring and tesAng that will be performed to assure that the final cover construcAon meets the specified requirements. 2.2 Material Evalua6on A. Site soils are fine grained in nature and are approved for final cover use. A copy of the geotechnical test results for the site soils are included in Appendix C. Import soil may be used for final cover construcAon with appropriate tesAng and approval prior to use. GradaAon tesAng for the potenAal import cover soil will be performed at one gradaAon test per 10,000 cubic yards of final cover soil. No addiAonal tesAng of the soils to be uAlized in the construcAon will be required other than to document that a minimum of 24 inches of soil has been placed. B. Test Fill – No test fill will be required for this project. 2.3 Construc6on Tes6ng A. Test Procedures – Final Cover soil will be tested according to the tests idenAfied in Table 1. 6 | Page B. Test Frequencies – Soil will be tested according to the minimum frequency idenAfied in Table 1. 2.4 Monitoring Requirements The monitoring requirements will include verificaAon of final cover thickness. 2.5 Documenta6on and Control of Nonconformance 2.5.1 ObservaAon of Nonconformance Whenever a nonconformance (cover thickness less than 24”) is discovered the Landfill Manager will either document the locaAon of the nonconformance (to be corrected at a future date) or have the ConstrucAon Team correct the cover thickness nonconformance as they are discovered. 2.5.2 Determining Extent of Nonconformance Whenever a nonconformance is discovered or observed in the construcAon process, product, documentaAon, or elsewhere, the Landfill Manager will determine the extent of the nonconformance. The extent of the deficiency may be determined by addiAonal sampling, tesAng, observaAons, review of records, or any other means deemed appropriate. 2.5.3 DocumenAng Nonconformance All nonconformances (observed but not corrected) will be documented in wriAng on a Problem IdenAficaAon / CorrecAve AcAon form. The documentaAon will occur immediately upon determining the extent of the nonconformance. 2.5.4 CorrecAve AcAon Since the only criterial item required for final cover construcAon documentaAon is cover soil gradaAon and final cover thickness; the prescribed correcAve acAon is to add addiAonal soil unAl a minimum of 24 inches of soil cover is documented. 2.5.5 VerificaAon of CorrecAve AcAons The Engineer and DWMRC personnel will verify all correcAve acAons. The verificaAon will be accomplished by site observaAons, depth tesAng (test pits), and photographs. VerificaAon of correcAve acAons will be made during the postconstrucAon meeAng. Wri`en documentaAon of 7 | Page the correcAve measures will be made by the Engineer on the second page of the Problem IdenAficaAon / CorrecAve AcAon form. 2.6 Construc6on Surveys A pre and post-construcAon survey may be performed by the Owner to document final cover geometry and thickness. Test pits will be excavated to confirm survey data. 2.7 Revegeta6on During the regrading of the landfill slopes, the orientaYon of the dozer resulted in grouser marks that are perpendicular to the slope. Those ridges le[ on the slope by the equipment tracks will also minimize slope erosion by providing interrupYon to the surface water flow. Perimeter roads will be established at the top of all slopes once the final cover soil thickness is documented, and no new soil is required to be placed on the side slope. The perimeter road will prohibit water from flowing from the top of the landfill down the side slopes by direcYng the water laterally away from the final cover. The revegetaAon seed mix for the north area of the Landfill is presented below. ReclamaYon Seed Mix (Per Acre) Pounds PLS Fourwing saltbush 10 Wyoming big sagebrush 0.75 Alksli sacabon 1 Blue grama 2.5 Bluebunch wheatgrass 14.25 Streambank wheatgrass 13 Smooth brome 15.5 Intermediate wheatgrass 10 Sandberg blusgrass 2 Sheep fescue 3 Slender wheatgrass 11 Western wheatgrass 17 The Owner may elect to coordinate revegetaAon efforts with local agricultural personnel or Utah State University Extension office personnel to select a different seed mix or revegetaAon efforts if iniAal revegetaAon is not adequately robust. 8 | Page PART 3 – DOCUMENTATION 3.1 Recordkeeping The quality assurance plan relies on the observaAons, tesAng, and associated documentaAon of all construcAon acAviAes. The documentaAon acAviAes will be performed by the Landfill Manager. A. Daily/Weekly Record of ConstrucAon Progress – Due to the anAcipated method and rate of construcAon; daily/weekly construcAon reports will not be uAlized. Soil will be moved by the ConstrucAon Team and potenAally stockpiled on the exisAng landfill for several weeks/months before being graded down the landfill slopes. Once enough material has been stockpiled; the landfill operators will grade the stockpiled material out to form the minimum 24-inch-thick final cover. B. Monthly Record of ConstrucAon Progress – Since the final cover construcAon will be done at a relaAvely slow pace; the Landfill Manager will fill out monthly construcAon record (during the months that the final soil cover materials are placed) detailing the esAmated amount of soil hauled and a summary of any tesAng performed. • Date, project name • Weather informaAon • A descripAon of all ongoing construcAon for the month • Areas of nonconformance/correcAve acAons, if any • Record of any site visitors • Signature of Landfill Manager C. Problem IdenAficaAon / CorrecAve AcAon – The problem idenAficaAon / correcAve acAon form is to be uAlized to idenAfy and document porAons of the construcAon that do not meet project specificaAons. The problem idenAficaAon / correcAve acAon form also documents the correcAve acAon associated with every problem idenAfied during construcAon. The Landfill Manager and Engineer will be responsible for filling out the Problem IdenAficaAon / CorrecAve AcAon form. D. Photographs ConstrucAon acAviAes may be photographed. Photographs could include any significant problems encountered and correcAve acAons, and document construcAon progress. The 9 | Page photographs will be idenAfied by locaAon, date, and a brief narraAve of the subject of the photograph. The Landfill Manager will be responsible for taking and cataloging construcAon photographs. 3.2 Final Construc6on Report At the compleAon of each Stage of the final cover construcAon, the Landfill Manager will submit a final construcAon documentaAon to the Engineer. The Engineer will review the construcAon documentaAon, perform a post-construcAon site visit and prepare a construcAon report that will document that the final cover has been constructed in compliance with the construcAon drawings and specificaAons. At a minimum, the final construcAon report will contain: • A summary of major construcAon acAviAes • A summary of field tests • Sampling and tesAng locaAons • As-built record drawings (if prepared) • Photographs of the final cover construcAon Once the Engineer finalizes the construcAon report that deems that the documentaAon is complete and that the work product has met the intent of the design, he will issue a le`er to the DWMRC. The le`er to the DWMRC will contain a statement of compliance with the construcAon drawings and specificaAons signed and stamped by a professional engineer registered in Utah. The post construcAon as-built survey drawing (if uAlized) will present the locaAon of all tests performed associated with the cover construcAon. The post construcAon survey (if uAlized) will be included in the final construcAon report and submi`ed to the UDWMRC. 10 | Page TABLE 1 Tests Test Method Material Evalua<on Acceptable Range Standard Proctor ASTM D 698 Not Required - Grain Size ASTM D 422 Every 10,000 yd3 - Liquid and PlasYc Limits (Acerberg) ASTM D 4318 Not Required - In-situ Density using Nuclear Gauge ASTM D 2922 Not Required - VerificaYon of Proper Thickness of Cover1 - Pre-ConstrucYon/Post ConstrucYon GPS Survey* 24-inch minimum *Cover thickness may be documented by GPS survey or confirmed by the excava9on of test pits at one test pit per acre of final cover. Landfill manager may require more tests based on test results and/or field condiAons. APPENDIX A A A' BB' CHECKED BY: COPYRIGHT: DESIGNED BY: DRAWN BY: CAD DWG FILE: PROJECT NO.: REFERENCE: ADAPTED FROM MAP PROVIDED BY CLIENT. 2702 South 1030 West, Suite 10 Salt Lake City, Utah 84119 (801)270-9400 (T) CEDAR VALLEY LANDFILL ISSUE: 1 SHEET TITLE (801)270-9401 (F) DATE DESCRIPTIONMARK 8/28/24 DRAFT 2000 West 200 South Transfer Station North Pointe Solid Waste Special Service District (801) 225-8538 (T) Lindon, Utah NS E W Feet 0 200 400 STAGE 1 CLOSURESTAGE 2 CLOSURE STAGE 3 CLOSUREST A G E 4 CL O S U R E STAGE 5 CLOSURE CLO S E D L A N D F I L L ( 2 0 1 2 ) LANDFILL CLOSURE STAGES (NORTH AREA) CLOSURE AREAS ARE APPROXIMATE AND MAY VARY DUE TO COVER SOIL AVAILABILITY. 60+00 65+00 70+00 75+00 80+00 82+00 0+ 0 0 1+ 0 0 2+ 0 0 3+ 0 0 4+ 0 0 5+ 0 0 6+ 0 0 7+ 0 0 8+ 0 0 9+ 0 0 10 + 0 0 11 + 0 0 12 + 0 0 13 + 0 0 14 + 0 0 15 + 0 0 16 + 0 0 17 + 0 0 18 + 0 0 18 + 7 8 0+001+002+003+004+005+006+007+008+009+0010+0011+0012+0013+0014+0015+0016+0017+0018+0019+0020+0021+0022+00 -3.0% -1 1 . 0 % -1 1 . 0 % -5.0% -3.0% - 3 . 0 % 4 8 5 5 4 8 6 0 4 8 6 5 4 8 7 0 4 8 7 5 4 8 8 0 4 8 8 5 4 8 9 0 4 8 9 5 4 9 0 0 48 8 0 48 8 5 48 9 0 A A' BB' CHECKED BY: COPYRIGHT: DESIGNED BY: DRAWN BY: CAD DWG FILE: PROJECT NO.: REFERENCE: ADAPTED FROM MAP PROVIDED BY CLIENT. 2702 South 1030 West, Suite 10 Salt Lake City, Utah 84119 (801)270-9400 (T) CEDAR VALLEY LANDFILL ISSUE: 2 SHEET TITLE (801)270-9401 (F) DATE DESCRIPTIONMARK 8/28/24 DRAFT 2000 West 200 South Transfer Station North Pointe Solid Waste Special Service District (801) 225-8538 (T) Lindon, Utah NS E W Feet 0 200 400 CONCEPTUAL FINAL GRADE (NORTH AREA) ACTUAL SLOPES AND ELEVATIONS MAY VARY DUE TO EARLY CLOSURE REQUIREMENTS Section A-A' PROFILE 4820 4900 4820 4900 1+00 48 8 6 . 0 9 2+00 48 8 9 . 4 6 3+00 48 9 0 . 4 9 48 9 1 . 9 8 5 4+00 48 9 0 . 1 0 48 9 3 . 6 4 6 5+00 48 8 9 . 3 2 48 9 2 . 0 8 4 6+00 48 8 8 . 3 3 48 9 3 . 2 2 2 7+00 48 8 7 . 2 4 48 9 5 . 0 7 9 8+00 48 9 4 . 0 4 48 9 7 . 3 8 7 9+00 48 9 9 . 0 1 49 0 0 . 1 4 4 10+00 49 0 0 . 8 5 49 0 2 . 9 4 6 11+00 48 9 9 . 6 6 49 0 0 . 9 5 7 12+00 48 8 9 . 3 7 48 9 4 . 1 7 8 13+00 48 7 4 . 8 9 48 8 4 . 7 7 5 14+00 48 7 3 . 9 4 48 7 5 . 3 7 2 15+00 48 6 3 . 0 8 16+00 48 4 4 . 8 4 17+00 48 3 0 . 3 3 18+00 48 2 0 . 2 5 Section B-B' PROFILE 4815 4900 4815 4900 1+00 48 2 7 . 8 7 2+00 48 4 4 . 2 9 3+00 48 6 3 . 5 4 4+00 48 7 8 . 4 5 48 7 8 . 0 7 8 5+00 48 7 8 . 6 9 48 8 1 . 0 3 3 6+00 48 7 8 . 0 2 48 8 3 . 9 1 2 7+00 48 7 8 . 8 0 48 8 6 . 5 8 0 8+00 48 8 1 . 2 6 48 8 8 . 9 9 9 9+00 48 8 1 . 5 5 48 9 1 . 3 5 7 10+00 48 8 2 . 3 6 48 9 3 . 8 2 5 11+00 48 9 3 . 8 2 48 9 7 . 1 1 4 12+00 49 0 0 . 8 9 49 0 1 . 8 1 5 13+00 49 0 0 . 3 0 49 0 2 . 5 3 5 14+00 48 9 9 . 8 1 49 0 0 . 3 8 0 15+00 48 8 8 . 8 8 16+00 48 7 5 . 7 1 48 7 6 . 8 2 6 17+00 48 7 3 . 7 2 18+00 48 6 9 . 3 9 19+00 48 6 6 . 4 9 20+00 48 5 3 . 9 0 21+00 48 2 8 . 4 8 CHECKED BY: COPYRIGHT: DESIGNED BY: DRAWN BY: CAD DWG FILE: PROJECT NO.: REFERENCE: ADAPTED FROM MAP PROVIDED BY CLIENT. 2702 South 1030 West, Suite 10 Salt Lake City, Utah 84119 (801)270-9400 (T) CEDAR VALLEY LANDFILL ISSUE: 3 SHEET TITLE (801)270-9401 (F) DATE DESCRIPTIONMARK 8/28/24 DRAFT 2000 West 200 South Transfer Station North Pointe Solid Waste Special Service District (801) 225-8538 (T) Lindon, Utah H = 4 x V Feet 0 200 400 NTS FINAL COVER (NORTH AREA) DT-1 - 18 IN. 6-12 IN. SECTION VIEW/ DETAIL DT-1 - DT-1 - APPENDIX B REPORT DATE: __________ REPORT #: _________ CEDAR VALLEY C&D LANDFILL MONTHLY FIELD LOG –– NORTH AREA FINAL COVER CONSTRUCTION WEATHER CONDITIONS: MONTHLY WEATHER SUMMARY: CONSTRUCTION MEETINGS: DOCUMENT ANY MEETINGS: WORK ACTIVITITS: SOIL PLACEMENT: AREA WHERE WORK IS BEING PERFORMED Comments: COVER DEPTH TESTING: AREA WHERE TESTING IS BEING PERFORMED Comments: LANDFILL MANAGER’S SIGNATURE: ________________________________________________ PROBLEM IDENTIFICATION/CORRECTIVE ACTION DATE: REPORT NUMBER: _______________________ PROBLEM: PROBLEM LOCATION/CAUSE: SUGGESTED CORRECTIVE MEASURE: __________________________________________ LANDFILL MANAGER’S SIGNATURE CORRECTIVE ACTION DOCUMENTATION OF PROBLEM RESOLUTION: _______________________________________ ENGINEER’S SIGNATURE APPENDIX C Liquid Limit, Plastic Limit, and Plasticity Index of Soils (ASTM D4318)© IGES 2004, 2024 Project: Boring No.: No: Sample: Location:Depth: Date: Description: By: Grooving tool type:Plastic Preparation method:Air Dry Liquid limit device:Mechanical Liquid limit test method: Rolling method: Screened over No.40:Yes Larger particles removed:Dry sieved     Plastic Limit   Determination No 1 2 Wet Soil + Tare (g)13.90 14.16 Dry Soil + Tare (g)12.69 12.93 Water Loss (g)1.21 1.23 Tare (g)7.00 7.07 Dry Soil (g)5.69 5.86 Water Content, w (%)21.27 20.99 Liquid Limit Determination No123 Number of Drops, N 29 21 15 Wet Soil + Tare (g)12.10 12.52 13.01 Dry Soil + Tare (g)11.14 11.57 11.96 Water Loss (g)0.96 0.95 1.05 Tare (g)7.04 7.61 7.82 Dry Soil (g)4.10 3.96 4.14 Water Content, w (%)23.41 23.99 25.36 One‐Point LL (%) 24 23 Liquid Limit, LL (%) Plastic Limit, PL (%) Plasticity Index, PI (%) Entered by:___________ Reviewed:___________Z:\PROJECTS\00853_NPSWSSD\011_Cedar_Valley_Landfill\[ALv2.xlsm]1 BRR North Pointe Solid Waste SSD 00853‐011 Cache Valley Landfill 8/16/2024   #1 Surface Brown silt Multipoint 3 24 21 Hand A‐Line U‐Line CL‐ML CL ML CH MH 0 10 20 30 40 50 60 0 102030405060708090100 Pl a s t i c  In d e x  (P I ) Liquid Limit (LL) Plasticity Chart LL = 24 23 23.5 24 24.5 25 25.5 10 100 Wa t e r  co n t e n t  (% ) Number of drops, N Flow Curve Particle‐Size Distribution (Gradation) of Soils Using Sieve Analysis  (ASTM D6913)© IGES 2004, 2024 Project: Boring No.: No: Sample: Location:Depth: Date: Description: By: Water content data C.F.(+3/8") S.F.(‐3/8") Split:Yes Moist soil + tare (g):183.49 506.08  Split sieve:3/8"Dry soil + tare (g):183.34 502.04 Moist Dry Tare (g):127.91 128.35 Total sample wt. (g):22912.68 22668.06 Water content (%): 0.3 1.1 +3/8" Coarse fraction (g):55.58 55.43 ‐3/8" Split fraction (g):377.73 373.69  Split fraction: 0.998 Accum. Grain Size Percent  Sieve Wt. Ret. (g) (mm) Finer 6"‐150 ‐ 4"‐100 ‐ 3"‐75 ‐ 1.5"‐37.5 ‐ 1"‐25 100.0 3/4" 26.21 19 99.9 3/8" 55.43 9.5 99.8 ←Split No.4 0.71 4.75 99.6 No.10 1.08 2 99.5 No.20 1.53 0.85 99.3 No.40 2.17 0.425 99.2 No.60 4.69 0.25 98.5 No.100 13.66 0.15 96.1 No.140 29.65 0.106 91.8 No.200 84.17 0.075 77.3 Gravel (%):0.4 Sand (%):22.3 Fines (%):77.3 Entered by:___________ Reviewed:___________Z:\PROJECTS\00853_NPSWSSD\011_Cedar_Valley_Landfill\[GSDv2.xlsm]1   #1 Surface Brown silt with sand JJ North Pointe Solid Waste SSD 00853‐011 Cedar Valley Landfill 8/16/2024 3 in No.4 No.2003/4 in No.10 No.40 0 10 20 30 40 50 60 70 80 90 100 0.010.1110100 Pe r c e n t  fi n e r  by  we i g h t Grain size (mm)