Loading...
HomeMy WebLinkAboutDAQ-2024-010151 Utah Division of Air Quality New Source Review Section Company ________________________________ Site/Source ___________ Form 6 Date ____________________________________ Cyclones Equipment Information 1. Manufacturer: _____________________________ Model no.: ___________________ 2. Type of cyclone: □ wet □ dry □ Single □ Multiple: number ________ □ In series : number ___________ 3. Type of particulate: ___________________________ Particulate size: ________________________microns (mean geometric diameter) 4. Efficiency of cyclone: At design maximum:______________________% At average operation: % 5. Pressure drop through cyclone (inches water): 6. Method of handling material removed: Gas Stream Characteristics 7. Particulate grain loading: Inlet: __________________________ Outlet: _________________________ 8. Total flow rate (acfm): Design maximum: ________________________ Average expected: ________________________ 9. Gas stream temperature (oF): Emissions Calculations (PTE) 10. Calculated emissions for this device PM10 ____________Lbs/hr___________ Tons/yr PM2.5 _____________Lbs/hr_____________ Tons/yr Submit calculations as an appendix. Instructions NOTE: 1. Submit this form in conjunction with Form 1 and Form 2. 2. Call the Division of Air Quality (DAQ) at (801) 536-4000 if you have problems or questions in filling out this form. Ask to speak with a New Source Review engineer. We will be glad to help! 1. Fill in the cyclone manufacturer's name and model number. 2. Indicate the type of cyclone being used. 3. Supply what the material is being controlled, and its mean geometric diameter in microns (μ). 4. Fill in the efficiency of the cyclone at the maximum and average operating levels. 5. Indicate the pressure drop through the cyclone (inches water). 6. Describe the method of handling the material removed by the cyclone. 7. Indicate the gas stream particulate grain loading at inlet and outlet. 8. Specify the flow rate in actual cubic feet per minute at the design maximum and average. 9. Specify the gas stream temperature as it goes through the cyclone. 10. Supply calculations for all criteria pollutants. Use AP42 or Manufacturers data to complete your calculations.   U:\aq\ENGINEER\GENERIC\Form 2010\Form06.doc Revised 12/20/2010