HomeMy WebLinkAboutDAQ-2024-010535Yr,*sflF.^9"."s.r
U tAH DEPAI1TMt-rNT OF
Huntington Power Plant
8 miles west of Huntington, Utah on Hwy. j I
P.O. Box 680
Huntington, Utah 84528
August 22,2024
Mr. Bryce Bird, Director
Utah Department of Environmental Quality
Division of Air Quality
195 North 1950 West
P.O. Box 144820
Salt Lake City, UT 84114-4820
And
Director, USEPA Region Vlll
8 ENF-AT
1595 \Afnkoop St.
Denver, CO 80202 - 1129
RE: MATS Quarterly Gompliance Report,40 CFR 63 Subpart UUUUU, Huntington Power Plant
(Title V Permit #1501001005) Boiler Units 1 and 2.
Dear Mr. Bird:
The reporting requirements for periodic compliance reports changed beginning on January 1,2024.
$63.10031(g) requires MATS affected sources to begin submitting quarterly compliance reports beginning
with the first calendar quarter o12024 using applicable data elements found in Appendix E to Subpart
UUUUU.
Huntington Power Plant's Title V Permit Conditions 11.B.2.9.3 and 11.8.3.f.3 require the Huntington Plant
submit Compliance Reports according to the requirements of 40 CFR 563.10031(b). This submittal
covers the period from April 1,2024, to June 30,2024, and is intended to satisfy those requirements.
I am authorized to make this submission on behalf of the owners and operators of the affected source or
affected units for which the submission is made. I certify under penalty of law that I have personally
examined, and am familiar with, the statements and information submitted in this document and all its
attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the
information, I certify that the statements and information are to the best of my knowledge and belief true,
accurate, and complete. I am aware that there are significant penalties for submitting false statements
and information, or omitting statements and information, including the possibility of fine or imprisonment.
Should you have any questions regarding this information, please contact Terry Guthrie, Hunter and
Huntington Plant Environmental Manager (435) 6874334 or me at (435) 687-4211.
ENVt RONr,"4E NT/\t- Q{JAt". tTY
DIVISION OF AIR OI,!AT ITY
REVIEWED
Initials JBR Date 9/30/24
Comp Status Meets
File # 10238 Blue 2
meets
Laren Huntsman
Managing Director Hunter and Huntington Plant
Responsible Official
Enclosures: Mercury and Air Toxics Quarterly Compliance Report with attachments A thru C - Units 1
and2
cc: Youn Joo Kim - USEPA Region Vlll w/enclosure
Josh Sewell - NTO Wo enclosure
Scarlet Jackson - NTO Mo enclosure
Russ Wllson - Huntington Plant - Files
UTAH DEPARTMENT OF
ENVIRONMENTAL QUALITY
AUG ?1 ?A?I
DIVISION OF AIR OUALITY
l?nclFlCoRP
Huntington Power PIant
MATS Quarterly Compliance Report Unit 1
40 cFR 63.10031(e)
April 1, 2024- June 30, 2024
Section 1.0 - Unit I Report Summary
Huntington Power Plant, 8 miles west of Huntington Utah on Hwy 31
P.O. Box 680
Huntington, Utah 84528
ldentification of eachhazardous air pollutant monitored at the affected source
L Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack
test as a surrogate to demonstrate compliance. On April3,20l8 the Utah Department
of Environmental Quality - Division of Air Quality agreed that the Huntington Plant
Unit I met the requirements to qualiff as a low emitting EGU (LEE) unit. The
Huntington Plant submitted a summary table showing three years of quarterly test data.
Each particulate matter (PM) testing result was below one-half of the 0.030 lblN4MBtu
limit or 0.015 lb/MMBtu as required by the subpart.
IL Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an
SOz continuous emissions monitoring system (CEMS).
III. Mercury (Hg), compliance demonstrated by an annualEPA Method 30B sorbent trap
test to re-confirm LEE status.
A brief description of the process unit
L Huntington Unit I is an Electric Utility Steam Generating Unit, designed as a bottom
tangentially-fired boiler, designed by Babcock and Wilcox.
i. Rated Heat Input Capacity of 4,960 MMBtufrr.
ii. The unit is equipped with the following add-on controls:
L Pulse Jet Fabric Filter (baghouse)
2. Wet Flue Gas Desulfurization (wet scrubber)
3. Low-NOx burner technology, with separated over-fire air
iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when
needed.
II. Unit Category
i. Unit 1 is an existing coal-fired unit combusting non-low rank virgin coal
demonstrating compliance with the emission limits found in Table 2 to Subpart
UUUUU of Part 63
III. The emission and operating parameter limitationsi. Filterable PM quarterly stack testing demonstrating compliance with a 0.030
lb/l\4MBtu emission limit. The unit has demonstrated and achieved low
emitting EGU (LEE) status.
ii. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of
lb/MMBtu demonstrating compliance with a 30 boiler-operating-day average
limit of 0.20 lb/t\4MBtu.
iii. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in
units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day
average of 1.2 lb/TBtu.
A description of any changes in CMS, processes, or controls since the last reporting
period
No changes occurred during the reporting period that would affect compliance to MATS.
Recent performance test results
Table 1-1: Unit I Filterable Particulate Matter LEE Test Results Summary
Table 1-2: Unit I Mercury LEE Test Results Summary
Test ID Test Date
Hg rate
(lb/TBtu)
MATS
Hg
Threshold
Unit Status
2024 0613012024 0.01 0.12
LEE Achieved.
Maintained with
06130/2024 LEE test
Section 2.0 - Unit I MATS Compliance Report Root Data Elements
Table 2-l: Root Data Elements
2.1 Facilirv ORIS Code 8069
2.2 Facilitv Name Huntington
2.3 Facility Registry Identifier (ORISPL)8069
2.4 Title 40 Part 63
2.5 Applicable Subpart UUUUU
Test ID Test Date
Average
PM rate
(lb/mmBtu)
MATS
PM
Limit*
Average
PM
(lblwIW-hr)
MATS
PM
Limit*
Unit Status
2024 03119t2024 0.010 0.030 0.10 0.30
LEE
Achieved in
2018.
Maintained
with
3119t2024
LEE test
*Low Emitter Limits are 0.015 Ib/MM-BTU and 0.15 lbs/i\4W-HR
2.6 Calendar Year 2024
2.7 Calendar Ouarter 2nd Ouarter
2.8 Submission Comment (ontional)See cover letter
Section 3.0 - Unit I Performance Stack Test Summary
For applicable elements of Appendix E Section 3 .1-3 .14, see stack testing reports submitted for the
quarter. Stack testing data is being provided in both .xml and .pdf formats.
Section 4.0 - Operating Limit Data (PM, CPMS, only)
No PM CPMS on unit. Section not applicable.
Section 5.0 - Unit I Performance Test Run Data
For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 6.0 - Unit 1 Conversion Parameters
For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 7 .0 - Unit I Quality Assurance Parameters
For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 8.0 - Averaging Group
Unit is not part of an averaging group.
Section 9.0 - Unit 1 Compliance Averages
Please see Attachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide.
Section 10.0 - Unit I Information
Table 10-1: Unit Information
Section Data Element Plant Data
l0. r Unit ID;Unit I
10.2 Date of Last Tune-up; and December 14.2022
10.3 Emerqency Bypass Information.No emersencv bvoass occurred durins ouarter
Section I 1.0 - Unit 1 Fuel Usage Information
Table 11-1 Quarterly Fuel Usage Information
Note: No new fuel types were combusted during the reporting period.
Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons)
April 0 49,914
May 0 46,414
June 1,870 46,910
Total 1,870 143,239
Section 12.0 and 13.0 - Unit I Malfunction, Deviations, and Monitoring
Downtime Information
Table 12-lMo ul Manufacturer and Model number
Pollutant Manufacturer Model Number
Sulfur Dioxide Thermo 43iQ-ACN
Carbon Dioxide
(COz)'Thermo 4r0iQ-ACN
Table 12-2: Most Recent CMS Certification or Audit
Ul CEMS Analyzer Latest RATA Date Latest Linearity Date
Carbon Dioxide (COz)4t30/2024 s1712024
Sulfur Dioxide (SOz)413012024 51712024
Table 12-3: Unit Operating Time During the Reporting Period
Ul Operating Period Hours of Unit Operation
2d Quarter,2024 2184.00
Table 12-4: Excess Emission Summary
I The COz analyzer is used as a diluent for calculating heat input based emission limits
5
Ul Excess Emissions
Summary PM SOz Hg
Total Hours of Exceedance 0 0 0
Exceedance percent of total
operating hours 0.001f,0.0%0.0%
Hours during startup and
shutdown 0 0 0
Hours during control equipment
problems 0 0 0
Hours during process hours 0 0 0
Hours during other know
problems 0 0 0
Hours during unknown causes 0 0 0
Emission Limit 0.030 0.20 1.2
Emission Limitation Unit lb/IvIMBtu Ib/IVIMBtu lb/TBtu
Emission
period
limitation averaging Annual Stack
Testing
30 boiler
operating-day
Annual Stack
Testing
Table 12-5: CMS performance summarT
For applicable elements of Appendix E Sections 12.l-12.3 and
No deviations from rule requirements occurred other than those
l3.l-13.5, see Attachments B and C.
stated on this report and attachments.
Ul CMS Performance Summary SOz
Downtime percent of total operating hours 0.14%
Totalhour of CMS downtime J
Hours due to monitoring equipment malfunctions 0
Hours due to non-monitoring equipment malfunctions
Hours due to quality assurance/quality control calibrations 0
Hours due to other known causes 2
Hours due to other unknown causes 0
Sections 14.0 through 30.0 - Reference Method Data
For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 31.0 - Other Information for Each Test or Test Series
In accordance with section 31.0 and to provide reporting transparency, all stack testing data
relevant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf format with
this quarterly compliance report.
Report Certification
Responsible offic I certiffing the accuracy of the report:
,/' Laren Huntsman
/ Responsible Official
Managing Director - Huntington Power Plant
I
Nl.\ I\ (.)tt,ltlut[_r ( r,tttIliirtttr'l(r'|r11 llrrtttittllton I'rrrr.'r I'l.tnl I rril I
Attachments:
Attachment A: MATS 30-Day Rolling SOz lb/IvIMBtu Average Data
Attachment B: SOz Monitor Downtime Events Report
Attachment C: Excess Emissions Report
Attachment A - MATS 30 Day Rolling Average
P|ant: HUNTINGTON PLANT
Repoft Period: 0410t/2024 Throuqh 0613012024
Source: UNIT1 Parameter: MT3SO2#B
Date l-Day Avg 3O-Day Avg Total
Operating
Valid
Operating
Invalid
Operating
lfarrn
Monitor
Availability
4t1t2024 0.04 0.05 720 716 4 99.4o/o
4t212024 0.03 0.05 720 716 4 99.4%
4t3t2024 0.05 0.05 720 716 4 99.4%
4t4t2024 0.06 0.05 720 716 4 99.4%
4t5t2024 0.05 0.05 720 716 4 99.4o/o
4t6t2024 0.05 0.05 719 715 4 99.4%
4nn024 0.06 0.05 719 715 4 99.4%
4t8t2024 0.06 0.05 719 715 4 99.4o/o
4t9t2024 0.05 0.05 719 715 4 99.4o/o
4non024 0.07 0.05 719 715 4 99.4o/o
4t't1t2024 0.06 0.05 719 715 4 99.40h
4112t2024 0.07 0.05 719 715 4 99.40/
4t13t2024 0.05 0.05 719 715 4 99.4o/o
4t14t2024 0.06 0.05 719 715 4 99.40/o
4t15D024 0.07 0.06 719 715 4 99.4o/o
4t1612024 0.04 0.05 719 715 4 99.40/o
4t17t2024 0.05 0.05 719 715 4 99.4o/o
4118t2024 0.07 0.06 719 715 4 99.4o/o
4t19t2024 0.05 0.06 719 7 5 4 99.4o/o
4t20t2024 0.05 0.06 719 7 5 4 99.4o/o
4t21t2024 0.06 0.06 719 7 5 4 99.4o/o
4t22t2024 0.08 0.06 719 7 5 4 99.4o/o
4123t2024 0.08 0.06 719 7 5 4 99.4%
4124t2024 0.06 0.06 719 7 I 0 100.0%
4t25t2024 0.07 0.06 719 719 0 100.0%
4t26t2024 0.05 0.06 719 719 0 100.0%
4127t2024 0.06 0.06 719 719 0 100.0%
4t28t2024 0.05 0.06 719 719 0 100.0%
4t25t2024 0.06 0.06 719 7',19 0 100.0%
4t30t2024 0.07 0.06 719 719 0 100.0%
5t1t2024 0.05 0.06 719 719 0 100.0%
5t2t2024 0.06 0.06 719 718 1 99.9%
513t2024 0.06 0.06 719 718 1 99.9%
51412024 0.07 0.06 719 718 1 99.9%
5t5t2024 0.06 0.06 719 718 1 99.9%
5t6DO24 0.05 0.06 720 719 1 99.9%
5n2024 0.02 0.06 720 719 1 99.9%
5t8t2024 0.02 0.06 720 719 1 99.9%
5t9t2024 0.02 0.06 720 719 1 99.9%
5t10t2024 0.04 0.06 720 719 'l 99.9%
Value = Offline Data
Valuer = Average represents a building 30D Average
Value = Exceedance
Report Generate d: 08 /O9 / 24 l3:tt
Report Version 5.2
HTNDAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PLANT
Report Period: 04107/2024 Throush 0613012024
Source: UNIT1 Parameter: MT3SO2#B
5t't1t2024 0.05 0.05 720 719 1 99.9%
5t12t2024 0.03 0.05 720 719 1 99.9%
5t13t2024 0.03 0.05 720 719 1 99.9%
5t14n024 0.04 0.05 720 719 1 99.9%
5t15t2024 0.04 0.05 720 719 1 99.9%
5116t2024 0.05 0.05 720 719 1 99.9olo
5t17t2024 0.03 0.05 720 719 1 99.9%
5t18t2024 0.02 0.05 720 719 1 99.9%
5t19t2024 0.03 0.05 720 719 'l 99.9%
5t20t2024 0.03 0.05 718 716 2 99.7o/o
5121t2024 0.03 0.05 718 715 3 99.6olo
5t22t2024 0.05 0.05 718 715 3 99.6%
5123t2024 0.05 0.05 718 715 3 99.6%
5n4t2024 0.05 0.04 718 715 3 99.6%
512512024 0.03 0.04 717 714 3 99.6%
5t26t2024 0.02 0.04 7't7 714 3 99.6%
5t27t2024 0.05 0.04 717 714 3 99.6%
5t28t2024 0.06 0.M 717 714 3 99.6%
5t29t2024 0.06 0.04 717 714 3 99.6%
5130t2024 0.07 0.04 717 714 3 99.6%
5131t2024 0.05 0.04 717 714 3 99.6%
611t2024 0.02 0.04 717 715 2 99.7o/o
6t2t2024 0.03 0.04 717 715 2 99.7%
6t312024 0.03 0.04 717 715 2 99.70/o
6t4t2024 0.03 0.04 717 715 2 99.7o/o
6t5t2024 0.03 0.04 717 715 2 99.7o/o
6t612024 0.05 0.04 717 715 2 99.7o/o
6n/2024 0.04 0.04 717 715 2 99.7o/o
6t8t2024 0.02 0.04 717 715 2 99.7%
619t2024 0.05 0.04 717 715 2 99.7o/o
6t10t2024 0.03 0.04 717 715 2 99.7o/o
6t11t2024 0.03 0.04 717 715 2 99.7%
6t12t2024 0.03 0.04 717 715 2 99.70/o
6t13t2024 0.03 0.04 717 715 2 99.7%
6t14t2024 0.03 0.04 717 715 2 99.7%
6t15t2024 0.03 0.04 717 715 2 99.7o/o
6t16t2024 0.03 0.04 717 715 2 99.7o/o
6t17t2024 0.03 0.04 717 715 2 99.7o/o
6t18t2024 0.05 0.04 717 715 2 99.7%
6t19t2024 0.04 0.04 719 718 1 99.9%
6120t2024 0.05 0.04 719 719 0 100.0%
6t21t2024 0.06 0.04 719 719 0 100.0%
6t22t2024 0.08 0.04 719 719 0 100.0%
Value = Offline Data
Valuer = Averate represents a building 30D Average
Value = Exceedance
Report Generate d: Q8 /O9 /24 73 :tt
Report Version 5.2
HTNDAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PLANT
Report Period: 0410L12024 Throuqh 06130/2024
Source: UNIT1 Parameter: MT3SO2#B
6t23n024 0.09 0.04 719 719 0 100.0%
6t24t2024 0.07 0.M 720 720 0 100.0%
6t25t2024 0.07 0.04 720 720 0 100.0%
6t26t2024 0.05 0.05 720 720 0 100.0%
6t27t2024 0.05 0.04 720 720 0 100.0%
6t28t2024 0.05 0.M 720 720 0 100.0%
6t2912024 0.07 0.M 720 720 0 100.0olo
6t30t2024 0.07 0.05 720 720 0 100.0%
Value = Offline Data
Valuer = Average represents a building 30D Average
Value = Exceedance
Report Generated: 08/09/24 L3:LL
Report Version 5.2
HTNDAHS04\\reportuser
Attachment B
CEMS Monitor Outage Report
Sulfur Dioxide (SOz) System Monitor Outage (lb/MMBtu)
+-tti.,.t''l r.fli:i
"-:r,],1ij fr*
't}l;TII-::;
?E4d:..1.i':\ r
fl:+ i'i;r,iil +
ffil.3
I 512/2024 I 1:00 I l:59 I N N 723 d
2 5/20/2024 I l:00 I l:59 I N N 724 b
J 5/2U2024 5:00 5:59 I N N 724 b
Total duration of monitor downtime 3 hours
Description of Causes/Corrective Actions.
*Cause:723 Hours due to non-monitor malfunctions.
'Corrective Action: d Setting gas pressures and flow rates for daily cal
or linearity test, then auto cal to verifu accuracy or
quarterly linearity testing performed. (Setting up
for lineariw test.)*Cause:724 Hours due to other known causes.
'Corrective Action: b Maintenance of another monitor required normal
sampling to be intemrpted. The system was
retumed to service followine the maintenance.
Attachment C
Unit I Excess Emissions Report
PM Excess Emissions
0.030 lbA{MBtu (Quarterly Stack Testing)
Total time for all excess emissions QQ hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No PM Excess Emissions occurred during the reporting period
No PM Malfunction occurred during the reporting period
SOz Excess Emissions
0.20 lbA,IMBtu (30 Boiler Operating Day Average)
Total time for all excess emissions 0.0 hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No SOz Excess Emissions occurred during the reporting period
SOz monitor equipment malfunctions noted in Attachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
YAI Cause Corrective
Action
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
Hg Excess Emissions
L2 lb/TBtu (30 Boiler Operating Day Average)
Total time for all excess emissions 0.0 hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No Hg Excess Emissions occurred during the reporting period
Hg monitor equipment malfunctions noted in Attachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
Lr
UTRH OEPRRTMENT OF
ENVIRONMENTAL QUALITY
AUG 21 ?|,2/]
l%ctFlEoRP
Huntington Power PIant
MATS Quarterly Compliance Report Unit 2
40 CFR 63.10031(e)
April 1, 2024, to June 30,2024
Section 1.0 - Unit 2 Report Summary
Name and address of the affected source
Huntington Power Plant,6 miles west of Huntington Utah on Hwy 31
P.O. Box 680
Huntington, Utah 84528
Identification of each hazardous air pollutant monitored at the affected source
I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack
test as a surrogate to demonstrate compliance. On April3,20l8 the Utah Department
of Environmental Quality - Division of Air Quality agreed that the Huntington Plant
Unit 2 met the requirements to qualify as a low emitting EGU (LEE) unit. The
Huntington Plant submitted a summary table showing three years of quarterly test data.
Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu
limit or 0.015 lb/MMBtu as required by the subpart.
II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an
SOz continuous emissions monitoring system (CEMS).
IIL Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap
test to re-confirm LEE status.
I.
A brief description of the process unit
Huntington Unit 2 is an Electric Utility Steam Generating Unit, designed as a bottom
tangentially-fired boiler, designed by Babcock and Wilcox.
i. Rated Heat Input Capacity of 4,960 MMBtu/hr.
ii. The unit is equipped with the following add-on controls:
1. Pulse Jet Fabric Filter (baghouse)
2. Wet Flue Gas Desulfurization (wet scrubber)
3. Low-NOx burner technology, with separated over-fire air
iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when
needed.
Unit Category
i. Unit 1 is an existing coal-fired unit combusting non-low rank virgin coal
demonstrating compliance with the emission limits found in Table 2 to Subpart
UUUUU of Part 63
The emission and operating parameter limitations
i. Filterable PM quarterly stack testing demonstrating compliance with a 0.030
lb/I\4MBtu emission limit. The unit has demonstrated and achieved low
emitting EGU (LEE) status.
ii. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of
lb/IvtMBtu demonstrating compliance with a 30 boiler-operating-day average
limit of 0.20 lbAvIMBtu.
II.
II I.
ur. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in
units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day
average of 1.2 lb/TBtu.
A description of any changes in CMS, processes, or controls since the last reporting
period
No changes occurred during the reporting period that would affect compliance to MATS.
Recent perforrnance test results
Table 1-1: Unit 2 Filterable Particulate Matter LEE Test Results Summary
Test ID Test Date
Average
PM rate
(lb/mmBtu)
MATS
PM
Limit*
Average
PM
(lb/Ivlw-hr)
MATS
PM
Limit*
Unit Status
2024 0410912024 0.009 0.030 0.08 0.30
LEE
Achieved in
2018.
Maintained
with
41912024
LEE test
*Low Emitter Limits are 0.015 Ib/MM-BTU and 0.15 lbs/\4W-HR
Table 1-2: Unit 2 Mercury LEE Test Results Summary
Test ID Test Date
Hg rate
(lb/TBtu)
MATS
Hg
Threshold
Unit Status
2024 04129/2024 0.01 0.12
LEE Achieved.
Maintained with
412912024 LEE test
Section 2.0 - Unit 2 MATS Compliance Report Root Data Elements
Table 2-1: Root Data Elements
2.1 Faci tv ORIS Code 8069
2.2 Faci ty Name Huntinston
2.3 Faci ty Resistry Identifier (ORISPL)8069
2.4 Title 40 Part 63
2.5 Aoolicable Suboart UUUUU
2.6 Calendar Year 2024
2.7 Calendar Ouarter 2nd Ouarter
2.8 Submission Comment (optional)See cover letter
Section 3.0 - Unit 2 Performance Stack Test Summary
For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submiued for the
quarter. Stack testing data is being provided in both .xml and .pdf formats.
Section 4.0 - Operating Limit Data (PM, CPMS, only)
No PM CPMS on unit. Section not applicable.
Section 5.0 - Unit 2 Performance Test Run Data
For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted forthe quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 6.0 - Unit 2 Conversion Parameters
For applicable elements of Appendix E Section 6.1-6-3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 7 .0 - Unit 2 Quality Assurance Parameters
For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 8.0 - Averaging Group
Unit is not part of an averaging group.
Section 9.0 - Unit 2 Compliance Averages
Please see Attachment A-1 which includes 30-boiler-operating-day average data for sulfur dioxide.
Section 10.0 - Unit 2 Information
Section I 1.0 - Unit 2 Fuel Usage Information
Table 11-1
Note: No new fuel types were combusted during the reporting period.
Table 10-l: Unit Information
Section Data Element Plant Data
10.1 Unit ID Unit2
10.2 Date of Last Tune-up December 4.2023
10.3 Emergency Bypass Information.No emergency bypass occurred durins quarter
Qua Fuel Usage Information
Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons)
April 0 47,513
May 0 42,733
June 1,296 45,137
Total 1,296 135,383
Section 12.0 and 13.0 - Unit 2 Malfunction, Deviations, and Monitoring
Downtime Information
Table 12-1 Monitoring Equi Ma fact and Model bennulacturernumDer
Pollutant Manufacturer Model Number
Sulfur Dioxide Thermo 43iQ-ACN
Carbon Dioxide
(COz)r Thermo 4l0iQ-ACN
Table 12-2: Most Recent CMS Certification or Audit
U2 CEMS Analyzer Latest RATA Date Latest Linearity Date
Carbon Dioxide (COz)411U2024 5t22/2024
Sulfur Dioxide (SOz)4t1v2024 5122t2024
Table 12-3: Unit Operating Time During the Reporting Period
U2 Operating Period Hours of Unit Operation
2d Quarter,2024 2176.32
Table 12-4: Excess Emission Summary
I The COz analyzer is used as a diluent for calculating heat input based emission limits
5
U2 Excess Emissions
Summary PM SOz Irg
Total Hours of Exceedance 0 0 0
Exceedance percent of total
operating hours 0.0010 0.0%0.0v,
Hours during startup and
shutdown 0 0 0
Hours during control
equipment problems 0 0 0
Hours during process hours 0 0 0
Hours during other know
problems 0 0 0
Hours during unknown causes 0 0 0
Emission Limit 0.030 0.20 1.2
Emission Limitation Unit lbsilr,tMBtu lbs/MMBtu lbs/TBtu
Emission limitation averaging
period
Quarterly Stack
Testing
30 boiler
operating-day
30 boiler
operating-day
uracy ofthe report:
Table 12-5: CMS performance summary
U2 CMS Performance Summary SOz
Downtime percent of total operating hours 0.0 %
Totalhour of CMS downtime 0
Hours due to monitoring equipment malfunctions 0
Hours due to non-monitoring equipment malfunctions 0
Hours due to quality assurance/quality control calibrations 0
Hours due to other known causes 0
Hours due to other unknown causes 0
For applicable elements of Appendix E Sections l2.l-12.3 and 13.1-13.5, see Attachments B and C.
No deviations from rule requirements occurred other than those stated on this report and attachments.
Sections 14.0 through 30.0 - Reference Method Data
For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter.
Stack testing data is being provided in both .xml and .pdf formats.
Section 31.0 - Other Information for Each Test or Test Series
In accordance with section 31.0 and to provide reporting transparency, all stack testing data
relevant to compliance with Subpart UUUUU of Pan 63 is being submitted in pdf format with
this quarterly compliance report.
Report Certification
Managing Director - Huntington Power Plant
,.'' Io^r", Ki /r? f 25
i,/lt/
6
Responsible offi
\l\ l\ (.)tttrtletlr ( otttltlt,:rrr'r llt|urt llLtrrtili,:irrr lrlrrr'r'l'llrnt I ntl I
Attachments:
Attachment A: MATS 30-Day Rolling SOz lb/]vlMBtu Average Data
Attachment B: SOz Monitor Downtime Events Report
Attachment C: Excess Emissions Report
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PLANT
Report Period: 0410112024 Throuqh 0613012024
Source: UNIT2 Parameter: MT3SO2#B
Date 1-Day Avg 30-Day Avg Total
Operating
Valid
Operating
Invalid
Operating
Monitor
AvallabiliW
4t1t2024 0.01 o.o2 720 718 2 99.7%
4t212024 0.0'l 0.02 720 7',18 2 99.7%
4t3t2024 0.01 0.02 720 718 2 99.7%
414t2024 0.01 0.02 720 718 2 99.7o/o
415t2024 0.02 0.02 720 7',18 2 99.70/o
4t6t2024 o.o2 0.02 720 718 2 99.7o/o
4t7DO24 0.02 0.02 720 718 2 99.7Yo
4t8t2024 0.03 o.o2 720 718 2 99.7o/o
4t9t2024 0.04 0.02 720 718 2 99.70/o
4t10t2024 0.04 0.02 720 718 2 99.7o/o
4t11t2024 0.03 o.o2 720 718 2 99.7o/o
4t1212024 0.03 0.02 720 718 2 99.7o/o
4113t2024 0.03 0.02 720 7',!8 2 99.7o/o
4t14t2024 0.05 0.02 720 718 2 99.7o/o
4t15t2024 0.04 0.02 720 718 2 99.7o/o
4t1612024 0.01 0.02 720 718 2 99.7%
4t17D024 o.o2 o.o2 720 718 2 99.70/o
4t18t2024 0.02 0.02 720 718 2 99.7%
4t19t2024 0.03 0.02 720 718 2 99.7o/o
4t20t2024 0.02 0.02 720 718 2 99.704
4t21t2024 0.02 0.02 720 718 2 99.7o/o
4122t2024 0.03 0.02 716 714 2 99.7%
4t23t2024 0.02 0.02 716 714 2 99.7o/o
4t2412024 o.o2 0.02 716 716 0 100.0%
4125t2024 o.o2 0.02 716 716 0 100.0%
4t26t2024 o.o2 0.02 716 716 0 100.0%
4127t2024 0.03 0.02 716 716 0 100.0%
4t28t2024 o.02 o.o2 716 716 0 100.0%
4t2912024 0.03 o.o2 7'.t6 716 0 100.0%
4t30t2024 0.04 o.o2 716 716 0 100.0%
5t1t2024 0.02 0.02 716 716 0 100.0%
5t2t2024 0.02 0.02 716 716 0 100.0%
5t312024 0.03 0.03 716 716 0 100.0%
5t4t2024 o.o2 0.03 716 716 0 100.0%
515t2024 0.01 0.03 716 716 0 100.0%
5t6t2024 o.o2 0.03 716 716 0 100.0%
5n/2024 0.01 0.03 716 716 0 100.0%
5t812024 o.o2 0.03 716 716 0 100.0%
5t9t2024 0.02 o.o2 716 716 0 100.0%
5t10t2024 0.02 0.02 716 716 0 100.0%
Value = Offline Data
Valuer = Averate represents a building 30D Average
Value = Exceedance
Report Generate d: 08/ 09 / 24 L3:L2
Report Version 5.2
HTNDAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
Plant: HUNTINGTON PI-ANT
Repoft Period: 0410112024 Throuqh 0613012024
Source: UNIT2 Parameter: MT3SO2#B
5t11t2024 0.04 0.02 716 716 0 100.0%
5112t2024 0.03 0.02 716 716 0 100.0%
5t13t2024 0.03 o.o2 716 716 0 100.0%
5l't4t2024 0.03 0.02 716 716 0 100.0%
5t15t2024 0.03 o.o2 716 716 0 100.0olo
5t16t2024 0.03 0.02 716 716 0 100.0olo
5t17t2024 0.01 0.02 716 7',16 0 100.0%
5t18t2024 0.01 0.02 716 716 0 100.0%
5t19t2024 0.02 0.02 716 716 0 100.0%
5t20t2024 0.02 o.o2 716 716 0 100.0%
5t21t2024 0.01 0.02 716 716 0 100.0%
512212024 o.o2 0.02 720 720 0 100.0%
5t23t2024 0.02 o.o2 720 720 0 100.0%
5124t2024 0.01 o.o2 720 720 0 100.0%
5t25t2024 0.00 0.02 720 720 0 '100.0%
5t26t2024 0.01 0.02 720 720 0 100.0%
5127t2024 0.02 0.02 720 720 0 100.0%
5t28t2024 0.04 0.02 720 720 0 100.0%
5t29t2024 0.04 o.o2 720 720 0 100.0%
5t30t2024 0.04 o.o2 720 720 0 100.0%
5t31t2024 0.02 0.02 720 720 0 100.0%
6t112024 0.01 0.02 720 720 0 100.0%
6t2t2024 o.o2 0.02 720 720 0 100.0o/o
6t3t2024 0.02 o.o2 720 720 0 100.0%
6t4t2024 o.o2 0.02 720 720 0 100.0%
6t5t2024 0.02 0.02 720 720 0 100.0%
6t6t2024 0.03 0.02 720 720 0 100.0%
6nt2024 0.03 0.02 720 720 0 00.0%
6t8t2024 0.01 o.o2 720 720 0 00.0%
6t9t2024 0.02 0.02 720 720 0 00.0%
6t10t2024 0.02 0.02 720 720 0 00.0%
6t11t2024 0.01 0.02 720 720 0 00.0%
6112t2024 0.01 0.02 720 720 0 00.0%
6t13t2024 0.02 0.02 720 720 0 00.0%
6t14t2024 0.02 0.02 720 720 0 00.0%
6t1512024 o.02 0.02 720 720 0 00.0%
6116t2024 o.o2 0.02 720 720 0 00.0%
6t17t2024 o.02 0.02 720 720 0 100.0%
6t18t2024 o.02 0.02 720 720 0 100.0%
6119t2024 o.o2 o.o2 720 720 0 100.0%
6t20t2024 0.03 0.02 720 720 0 100.0%
6121t2024 0.03 0.02 720 720 0 100.0%
6t22t2024 0.03 0.02 720 720 0 100.0%
Value = Offline Data
Valuer = AveraSe represents a building 30D Average
Value = Exceedance
Report Generated: 08/ 09 / 24 73 :72
Report Version 5.2
HTNDAHS04\\reportuser
Attachment A - MATS 30 Day Rolling Average
P|ant: HUNTINGTON PLANT
Report Period: 0410112024 Throuqh 0613012024
Source: UNIT2 Parameter: MT3SO2#B
6t23t2024 0.05 o.o2 720 720 0 '100.0%
6t24t2024 0.05 0.02 720 720 0 100.0%
6t25t2024 0.03 0.o2 720 720 0 100.0%
6t2612024 0.02 0.02 720 720 0 100.0%
6t27t2024 0.03 o.o2 720 720 0 100.0%
612812024 0.02 0.o2 720 720 0 100.0%
6t29t2024 o.o2 0.02 717 717 0 100.0%
6t30t2024 0.02 o.o2 713 713 0 100.0%
Value = Offline Data
Valuer = Averate represents a building 30D Average
Value = Exceedance
Report Generate d: 08 / 09 / 24 t3:12
Report Version 5.2
HTNDAHS04\\reportuser
Attachment B
CEMS Monitor Outage Report
Sulfur Dioxide (SOz) System Monitor Outage (lb/IIMBtu)
Total duration of monitor downtime 0 hours
Description of Causes/Corective Actions.
*Cause:
'Corrective Action:
Attachment C
Unit L Excess Emissions Report
PM Excess Emissions
0.030 lbA,IMBtu (Quarterly Stack Testing)
Total time for all excess emissions 0.0 hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No PM Excess Emissions occurred during the reporting period
No PM Malfunction occurred during the reporting period
SOz Excess Emissions
0.20 lbiMMBtu (30 Boiler Operating Day Average)
Total time for all excess emissions QQ hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No SOz Excess Emissions occurred during the reporting period
SOz monitor equipment malfunctions noted in Attachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action
llg Excess Emissions
1.2 lb/TBtu (30 Boiler Operating Day Average)
Total time for all excess emissions QQ hours
Total time for excess emissions occurring during startup/shutdown or malfunction 0.0
hours
Malfunction reason and corrective /preventive action taken)
No Hg Excess Emissions occurred during the reporting period
Hg monitor equipment malfunctions noted in Attachment B.
Excess
Emission
Incident
Number
Magnitude
of Excess
Emissions
lb/MMBtu
Date Time
Beginning
Time
Ending
Hours
Involved
Malfunction
Y/N Cause Corrective
Action