HomeMy WebLinkAboutDAQ-2024-010535Yr,*sflF.^9"."s.r U tAH DEPAI1TMt-rNT OF Huntington Power Plant 8 miles west of Huntington, Utah on Hwy. j I P.O. Box 680 Huntington, Utah 84528 August 22,2024 Mr. Bryce Bird, Director Utah Department of Environmental Quality Division of Air Quality 195 North 1950 West P.O. Box 144820 Salt Lake City, UT 84114-4820 And Director, USEPA Region Vlll 8 ENF-AT 1595 \Afnkoop St. Denver, CO 80202 - 1129 RE: MATS Quarterly Gompliance Report,40 CFR 63 Subpart UUUUU, Huntington Power Plant (Title V Permit #1501001005) Boiler Units 1 and 2. Dear Mr. Bird: The reporting requirements for periodic compliance reports changed beginning on January 1,2024. $63.10031(g) requires MATS affected sources to begin submitting quarterly compliance reports beginning with the first calendar quarter o12024 using applicable data elements found in Appendix E to Subpart UUUUU. Huntington Power Plant's Title V Permit Conditions 11.B.2.9.3 and 11.8.3.f.3 require the Huntington Plant submit Compliance Reports according to the requirements of 40 CFR 563.10031(b). This submittal covers the period from April 1,2024, to June 30,2024, and is intended to satisfy those requirements. I am authorized to make this submission on behalf of the owners and operators of the affected source or affected units for which the submission is made. I certify under penalty of law that I have personally examined, and am familiar with, the statements and information submitted in this document and all its attachments. Based on my inquiry of those individuals with primary responsibility for obtaining the information, I certify that the statements and information are to the best of my knowledge and belief true, accurate, and complete. I am aware that there are significant penalties for submitting false statements and information, or omitting statements and information, including the possibility of fine or imprisonment. Should you have any questions regarding this information, please contact Terry Guthrie, Hunter and Huntington Plant Environmental Manager (435) 6874334 or me at (435) 687-4211. ENVt RONr,"4E NT/\t- Q{JAt". tTY DIVISION OF AIR OI,!AT ITY REVIEWED Initials JBR Date 9/30/24 Comp Status Meets File # 10238 Blue 2 meets Laren Huntsman Managing Director Hunter and Huntington Plant Responsible Official Enclosures: Mercury and Air Toxics Quarterly Compliance Report with attachments A thru C - Units 1 and2 cc: Youn Joo Kim - USEPA Region Vlll w/enclosure Josh Sewell - NTO Wo enclosure Scarlet Jackson - NTO Mo enclosure Russ Wllson - Huntington Plant - Files UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY AUG ?1 ?A?I DIVISION OF AIR OUALITY l?nclFlCoRP Huntington Power PIant MATS Quarterly Compliance Report Unit 1 40 cFR 63.10031(e) April 1, 2024- June 30, 2024 Section 1.0 - Unit I Report Summary Huntington Power Plant, 8 miles west of Huntington Utah on Hwy 31 P.O. Box 680 Huntington, Utah 84528 ldentification of eachhazardous air pollutant monitored at the affected source L Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On April3,20l8 the Utah Department of Environmental Quality - Division of Air Quality agreed that the Huntington Plant Unit I met the requirements to qualiff as a low emitting EGU (LEE) unit. The Huntington Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lblN4MBtu limit or 0.015 lb/MMBtu as required by the subpart. IL Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). III. Mercury (Hg), compliance demonstrated by an annualEPA Method 30B sorbent trap test to re-confirm LEE status. A brief description of the process unit L Huntington Unit I is an Electric Utility Steam Generating Unit, designed as a bottom tangentially-fired boiler, designed by Babcock and Wilcox. i. Rated Heat Input Capacity of 4,960 MMBtufrr. ii. The unit is equipped with the following add-on controls: L Pulse Jet Fabric Filter (baghouse) 2. Wet Flue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with separated over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. II. Unit Category i. Unit 1 is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUUUU of Part 63 III. The emission and operating parameter limitationsi. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lb/l\4MBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. ii. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of lb/MMBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20 lb/t\4MBtu. iii. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS, processes, or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent performance test results Table 1-1: Unit I Filterable Particulate Matter LEE Test Results Summary Table 1-2: Unit I Mercury LEE Test Results Summary Test ID Test Date Hg rate (lb/TBtu) MATS Hg Threshold Unit Status 2024 0613012024 0.01 0.12 LEE Achieved. Maintained with 06130/2024 LEE test Section 2.0 - Unit I MATS Compliance Report Root Data Elements Table 2-l: Root Data Elements 2.1 Facilirv ORIS Code 8069 2.2 Facilitv Name Huntington 2.3 Facility Registry Identifier (ORISPL)8069 2.4 Title 40 Part 63 2.5 Applicable Subpart UUUUU Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (lblwIW-hr) MATS PM Limit* Unit Status 2024 03119t2024 0.010 0.030 0.10 0.30 LEE Achieved in 2018. Maintained with 3119t2024 LEE test *Low Emitter Limits are 0.015 Ib/MM-BTU and 0.15 lbs/i\4W-HR 2.6 Calendar Year 2024 2.7 Calendar Ouarter 2nd Ouarter 2.8 Submission Comment (ontional)See cover letter Section 3.0 - Unit I Performance Stack Test Summary For applicable elements of Appendix E Section 3 .1-3 .14, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit I Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit 1 Conversion Parameters For applicable elements of Appendix E Section 6.1-6.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit I Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit 1 Compliance Averages Please see Attachment A-l which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit I Information Table 10-1: Unit Information Section Data Element Plant Data l0. r Unit ID;Unit I 10.2 Date of Last Tune-up; and December 14.2022 10.3 Emerqency Bypass Information.No emersencv bvoass occurred durins ouarter Section I 1.0 - Unit 1 Fuel Usage Information Table 11-1 Quarterly Fuel Usage Information Note: No new fuel types were combusted during the reporting period. Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons) April 0 49,914 May 0 46,414 June 1,870 46,910 Total 1,870 143,239 Section 12.0 and 13.0 - Unit I Malfunction, Deviations, and Monitoring Downtime Information Table 12-lMo ul Manufacturer and Model number Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ-ACN Carbon Dioxide (COz)'Thermo 4r0iQ-ACN Table 12-2: Most Recent CMS Certification or Audit Ul CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)4t30/2024 s1712024 Sulfur Dioxide (SOz)413012024 51712024 Table 12-3: Unit Operating Time During the Reporting Period Ul Operating Period Hours of Unit Operation 2d Quarter,2024 2184.00 Table 12-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input based emission limits 5 Ul Excess Emissions Summary PM SOz Hg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.001f,0.0%0.0% Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 1.2 Emission Limitation Unit lb/IvIMBtu Ib/IVIMBtu lb/TBtu Emission period limitation averaging Annual Stack Testing 30 boiler operating-day Annual Stack Testing Table 12-5: CMS performance summarT For applicable elements of Appendix E Sections 12.l-12.3 and No deviations from rule requirements occurred other than those l3.l-13.5, see Attachments B and C. stated on this report and attachments. Ul CMS Performance Summary SOz Downtime percent of total operating hours 0.14% Totalhour of CMS downtime J Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions Hours due to quality assurance/quality control calibrations 0 Hours due to other known causes 2 Hours due to other unknown causes 0 Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 31.0 - Other Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUUUU of Part 63 is being submitted in pdf format with this quarterly compliance report. Report Certification Responsible offic I certiffing the accuracy of the report: ,/' Laren Huntsman / Responsible Official Managing Director - Huntington Power Plant I Nl.\ I\ (.)tt,ltlut[_r ( r,tttIliirtttr'l(r'|r11 llrrtttittllton I'rrrr.'r I'l.tnl I rril I Attachments: Attachment A: MATS 30-Day Rolling SOz lb/IvIMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A - MATS 30 Day Rolling Average P|ant: HUNTINGTON PLANT Repoft Period: 0410t/2024 Throuqh 0613012024 Source: UNIT1 Parameter: MT3SO2#B Date l-Day Avg 3O-Day Avg Total Operating Valid Operating Invalid Operating lfarrn Monitor Availability 4t1t2024 0.04 0.05 720 716 4 99.4o/o 4t212024 0.03 0.05 720 716 4 99.4% 4t3t2024 0.05 0.05 720 716 4 99.4% 4t4t2024 0.06 0.05 720 716 4 99.4% 4t5t2024 0.05 0.05 720 716 4 99.4o/o 4t6t2024 0.05 0.05 719 715 4 99.4% 4nn024 0.06 0.05 719 715 4 99.4% 4t8t2024 0.06 0.05 719 715 4 99.4o/o 4t9t2024 0.05 0.05 719 715 4 99.4o/o 4non024 0.07 0.05 719 715 4 99.4o/o 4t't1t2024 0.06 0.05 719 715 4 99.40h 4112t2024 0.07 0.05 719 715 4 99.40/ 4t13t2024 0.05 0.05 719 715 4 99.4o/o 4t14t2024 0.06 0.05 719 715 4 99.40/o 4t15D024 0.07 0.06 719 715 4 99.4o/o 4t1612024 0.04 0.05 719 715 4 99.40/o 4t17t2024 0.05 0.05 719 715 4 99.4o/o 4118t2024 0.07 0.06 719 715 4 99.4o/o 4t19t2024 0.05 0.06 719 7 5 4 99.4o/o 4t20t2024 0.05 0.06 719 7 5 4 99.4o/o 4t21t2024 0.06 0.06 719 7 5 4 99.4o/o 4t22t2024 0.08 0.06 719 7 5 4 99.4o/o 4123t2024 0.08 0.06 719 7 5 4 99.4% 4124t2024 0.06 0.06 719 7 I 0 100.0% 4t25t2024 0.07 0.06 719 719 0 100.0% 4t26t2024 0.05 0.06 719 719 0 100.0% 4127t2024 0.06 0.06 719 719 0 100.0% 4t28t2024 0.05 0.06 719 719 0 100.0% 4t25t2024 0.06 0.06 719 7',19 0 100.0% 4t30t2024 0.07 0.06 719 719 0 100.0% 5t1t2024 0.05 0.06 719 719 0 100.0% 5t2t2024 0.06 0.06 719 718 1 99.9% 513t2024 0.06 0.06 719 718 1 99.9% 51412024 0.07 0.06 719 718 1 99.9% 5t5t2024 0.06 0.06 719 718 1 99.9% 5t6DO24 0.05 0.06 720 719 1 99.9% 5n2024 0.02 0.06 720 719 1 99.9% 5t8t2024 0.02 0.06 720 719 1 99.9% 5t9t2024 0.02 0.06 720 719 1 99.9% 5t10t2024 0.04 0.06 720 719 'l 99.9% Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Generate d: 08 /O9 / 24 l3:tt Report Version 5.2 HTNDAHS04\\reportuser Attachment A - MATS 30 Day Rolling Average Plant: HUNTINGTON PLANT Report Period: 04107/2024 Throush 0613012024 Source: UNIT1 Parameter: MT3SO2#B 5t't1t2024 0.05 0.05 720 719 1 99.9% 5t12t2024 0.03 0.05 720 719 1 99.9% 5t13t2024 0.03 0.05 720 719 1 99.9% 5t14n024 0.04 0.05 720 719 1 99.9% 5t15t2024 0.04 0.05 720 719 1 99.9% 5116t2024 0.05 0.05 720 719 1 99.9olo 5t17t2024 0.03 0.05 720 719 1 99.9% 5t18t2024 0.02 0.05 720 719 1 99.9% 5t19t2024 0.03 0.05 720 719 'l 99.9% 5t20t2024 0.03 0.05 718 716 2 99.7o/o 5121t2024 0.03 0.05 718 715 3 99.6olo 5t22t2024 0.05 0.05 718 715 3 99.6% 5123t2024 0.05 0.05 718 715 3 99.6% 5n4t2024 0.05 0.04 718 715 3 99.6% 512512024 0.03 0.04 717 714 3 99.6% 5t26t2024 0.02 0.04 7't7 714 3 99.6% 5t27t2024 0.05 0.04 717 714 3 99.6% 5t28t2024 0.06 0.M 717 714 3 99.6% 5t29t2024 0.06 0.04 717 714 3 99.6% 5130t2024 0.07 0.04 717 714 3 99.6% 5131t2024 0.05 0.04 717 714 3 99.6% 611t2024 0.02 0.04 717 715 2 99.7o/o 6t2t2024 0.03 0.04 717 715 2 99.7% 6t312024 0.03 0.04 717 715 2 99.70/o 6t4t2024 0.03 0.04 717 715 2 99.7o/o 6t5t2024 0.03 0.04 717 715 2 99.7o/o 6t612024 0.05 0.04 717 715 2 99.7o/o 6n/2024 0.04 0.04 717 715 2 99.7o/o 6t8t2024 0.02 0.04 717 715 2 99.7% 619t2024 0.05 0.04 717 715 2 99.7o/o 6t10t2024 0.03 0.04 717 715 2 99.7o/o 6t11t2024 0.03 0.04 717 715 2 99.7% 6t12t2024 0.03 0.04 717 715 2 99.70/o 6t13t2024 0.03 0.04 717 715 2 99.7% 6t14t2024 0.03 0.04 717 715 2 99.7% 6t15t2024 0.03 0.04 717 715 2 99.7o/o 6t16t2024 0.03 0.04 717 715 2 99.7o/o 6t17t2024 0.03 0.04 717 715 2 99.7o/o 6t18t2024 0.05 0.04 717 715 2 99.7% 6t19t2024 0.04 0.04 719 718 1 99.9% 6120t2024 0.05 0.04 719 719 0 100.0% 6t21t2024 0.06 0.04 719 719 0 100.0% 6t22t2024 0.08 0.04 719 719 0 100.0% Value = Offline Data Valuer = Averate represents a building 30D Average Value = Exceedance Report Generate d: Q8 /O9 /24 73 :tt Report Version 5.2 HTNDAHS04\\reportuser Attachment A - MATS 30 Day Rolling Average Plant: HUNTINGTON PLANT Report Period: 0410L12024 Throuqh 06130/2024 Source: UNIT1 Parameter: MT3SO2#B 6t23n024 0.09 0.04 719 719 0 100.0% 6t24t2024 0.07 0.M 720 720 0 100.0% 6t25t2024 0.07 0.04 720 720 0 100.0% 6t26t2024 0.05 0.05 720 720 0 100.0% 6t27t2024 0.05 0.04 720 720 0 100.0% 6t28t2024 0.05 0.M 720 720 0 100.0% 6t2912024 0.07 0.M 720 720 0 100.0olo 6t30t2024 0.07 0.05 720 720 0 100.0% Value = Offline Data Valuer = Average represents a building 30D Average Value = Exceedance Report Generated: 08/09/24 L3:LL Report Version 5.2 HTNDAHS04\\reportuser Attachment B CEMS Monitor Outage Report Sulfur Dioxide (SOz) System Monitor Outage (lb/MMBtu) +-tti.,.t''l r.fli:i "-:r,],1ij fr* 't}l;TII-::; ?E4d:..1.i':\ r fl:+ i'i;r,iil + ffil.3 I 512/2024 I 1:00 I l:59 I N N 723 d 2 5/20/2024 I l:00 I l:59 I N N 724 b J 5/2U2024 5:00 5:59 I N N 724 b Total duration of monitor downtime 3 hours Description of Causes/Corrective Actions. *Cause:723 Hours due to non-monitor malfunctions. 'Corrective Action: d Setting gas pressures and flow rates for daily cal or linearity test, then auto cal to verifu accuracy or quarterly linearity testing performed. (Setting up for lineariw test.)*Cause:724 Hours due to other known causes. 'Corrective Action: b Maintenance of another monitor required normal sampling to be intemrpted. The system was retumed to service followine the maintenance. Attachment C Unit I Excess Emissions Report PM Excess Emissions 0.030 lbA{MBtu (Quarterly Stack Testing) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lbA,IMBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction YAI Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Hg Excess Emissions L2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Lr UTRH OEPRRTMENT OF ENVIRONMENTAL QUALITY AUG 21 ?|,2/] l%ctFlEoRP Huntington Power PIant MATS Quarterly Compliance Report Unit 2 40 CFR 63.10031(e) April 1, 2024, to June 30,2024 Section 1.0 - Unit 2 Report Summary Name and address of the affected source Huntington Power Plant,6 miles west of Huntington Utah on Hwy 31 P.O. Box 680 Huntington, Utah 84528 Identification of each hazardous air pollutant monitored at the affected source I. Non-Mercury HAPS metals using a quarterly filterable particulate matter (PM) stack test as a surrogate to demonstrate compliance. On April3,20l8 the Utah Department of Environmental Quality - Division of Air Quality agreed that the Huntington Plant Unit 2 met the requirements to qualify as a low emitting EGU (LEE) unit. The Huntington Plant submitted a summary table showing three years of quarterly test data. Each particulate matter (PM) testing result was below one-half of the 0.030 lb/MMBtu limit or 0.015 lb/MMBtu as required by the subpart. II. Acid gases using sulfur dioxide (SOz) as a surrogate to demonstrate compliance by an SOz continuous emissions monitoring system (CEMS). IIL Mercury (Hg), compliance demonstrated by an annual EPA Method 30B sorbent trap test to re-confirm LEE status. I. A brief description of the process unit Huntington Unit 2 is an Electric Utility Steam Generating Unit, designed as a bottom tangentially-fired boiler, designed by Babcock and Wilcox. i. Rated Heat Input Capacity of 4,960 MMBtu/hr. ii. The unit is equipped with the following add-on controls: 1. Pulse Jet Fabric Filter (baghouse) 2. Wet Flue Gas Desulfurization (wet scrubber) 3. Low-NOx burner technology, with separated over-fire air iii. Fuels used are sub-bituminous coal using #2 fuel oil for startup fuel when needed. Unit Category i. Unit 1 is an existing coal-fired unit combusting non-low rank virgin coal demonstrating compliance with the emission limits found in Table 2 to Subpart UUUUU of Part 63 The emission and operating parameter limitations i. Filterable PM quarterly stack testing demonstrating compliance with a 0.030 lb/I\4MBtu emission limit. The unit has demonstrated and achieved low emitting EGU (LEE) status. ii. SOz CEMS as a surrogate for acid gases reporting hourly averages in units of lb/IvtMBtu demonstrating compliance with a 30 boiler-operating-day average limit of 0.20 lbAvIMBtu. II. II I. ur. Hg annual EPA Method 30B sorbent trap test reporting hourly averages in units of lb/TBtu demonstrating compliance with a 30 boiler-operating-day average of 1.2 lb/TBtu. A description of any changes in CMS, processes, or controls since the last reporting period No changes occurred during the reporting period that would affect compliance to MATS. Recent perforrnance test results Table 1-1: Unit 2 Filterable Particulate Matter LEE Test Results Summary Test ID Test Date Average PM rate (lb/mmBtu) MATS PM Limit* Average PM (lb/Ivlw-hr) MATS PM Limit* Unit Status 2024 0410912024 0.009 0.030 0.08 0.30 LEE Achieved in 2018. Maintained with 41912024 LEE test *Low Emitter Limits are 0.015 Ib/MM-BTU and 0.15 lbs/\4W-HR Table 1-2: Unit 2 Mercury LEE Test Results Summary Test ID Test Date Hg rate (lb/TBtu) MATS Hg Threshold Unit Status 2024 04129/2024 0.01 0.12 LEE Achieved. Maintained with 412912024 LEE test Section 2.0 - Unit 2 MATS Compliance Report Root Data Elements Table 2-1: Root Data Elements 2.1 Faci tv ORIS Code 8069 2.2 Faci ty Name Huntinston 2.3 Faci ty Resistry Identifier (ORISPL)8069 2.4 Title 40 Part 63 2.5 Aoolicable Suboart UUUUU 2.6 Calendar Year 2024 2.7 Calendar Ouarter 2nd Ouarter 2.8 Submission Comment (optional)See cover letter Section 3.0 - Unit 2 Performance Stack Test Summary For applicable elements of Appendix E Section 3.1-3.14, see stack testing reports submiued for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 4.0 - Operating Limit Data (PM, CPMS, only) No PM CPMS on unit. Section not applicable. Section 5.0 - Unit 2 Performance Test Run Data For applicable elements of Appendix E Section 5.1-5.8, see stack testing reports submitted forthe quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 6.0 - Unit 2 Conversion Parameters For applicable elements of Appendix E Section 6.1-6-3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 7 .0 - Unit 2 Quality Assurance Parameters For applicable elements of Appendix E Section 7.1-7.3, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 8.0 - Averaging Group Unit is not part of an averaging group. Section 9.0 - Unit 2 Compliance Averages Please see Attachment A-1 which includes 30-boiler-operating-day average data for sulfur dioxide. Section 10.0 - Unit 2 Information Section I 1.0 - Unit 2 Fuel Usage Information Table 11-1 Note: No new fuel types were combusted during the reporting period. Table 10-l: Unit Information Section Data Element Plant Data 10.1 Unit ID Unit2 10.2 Date of Last Tune-up December 4.2023 10.3 Emergency Bypass Information.No emergency bypass occurred durins quarter Qua Fuel Usage Information Month #2 Fuel Oil Burned (gallons)Sub-Bituminous Coal Burned (tons) April 0 47,513 May 0 42,733 June 1,296 45,137 Total 1,296 135,383 Section 12.0 and 13.0 - Unit 2 Malfunction, Deviations, and Monitoring Downtime Information Table 12-1 Monitoring Equi Ma fact and Model bennulacturernumDer Pollutant Manufacturer Model Number Sulfur Dioxide Thermo 43iQ-ACN Carbon Dioxide (COz)r Thermo 4l0iQ-ACN Table 12-2: Most Recent CMS Certification or Audit U2 CEMS Analyzer Latest RATA Date Latest Linearity Date Carbon Dioxide (COz)411U2024 5t22/2024 Sulfur Dioxide (SOz)4t1v2024 5122t2024 Table 12-3: Unit Operating Time During the Reporting Period U2 Operating Period Hours of Unit Operation 2d Quarter,2024 2176.32 Table 12-4: Excess Emission Summary I The COz analyzer is used as a diluent for calculating heat input based emission limits 5 U2 Excess Emissions Summary PM SOz Irg Total Hours of Exceedance 0 0 0 Exceedance percent of total operating hours 0.0010 0.0%0.0v, Hours during startup and shutdown 0 0 0 Hours during control equipment problems 0 0 0 Hours during process hours 0 0 0 Hours during other know problems 0 0 0 Hours during unknown causes 0 0 0 Emission Limit 0.030 0.20 1.2 Emission Limitation Unit lbsilr,tMBtu lbs/MMBtu lbs/TBtu Emission limitation averaging period Quarterly Stack Testing 30 boiler operating-day 30 boiler operating-day uracy ofthe report: Table 12-5: CMS performance summary U2 CMS Performance Summary SOz Downtime percent of total operating hours 0.0 % Totalhour of CMS downtime 0 Hours due to monitoring equipment malfunctions 0 Hours due to non-monitoring equipment malfunctions 0 Hours due to quality assurance/quality control calibrations 0 Hours due to other known causes 0 Hours due to other unknown causes 0 For applicable elements of Appendix E Sections l2.l-12.3 and 13.1-13.5, see Attachments B and C. No deviations from rule requirements occurred other than those stated on this report and attachments. Sections 14.0 through 30.0 - Reference Method Data For applicable elements of Appendix E Sections 14-30, see stack testing reports submitted for the quarter. Stack testing data is being provided in both .xml and .pdf formats. Section 31.0 - Other Information for Each Test or Test Series In accordance with section 31.0 and to provide reporting transparency, all stack testing data relevant to compliance with Subpart UUUUU of Pan 63 is being submitted in pdf format with this quarterly compliance report. Report Certification Managing Director - Huntington Power Plant ,.'' Io^r", Ki /r? f 25 i,/lt/ 6 Responsible offi \l\ l\ (.)tttrtletlr ( otttltlt,:rrr'r llt|urt llLtrrtili,:irrr lrlrrr'r'l'llrnt I ntl I Attachments: Attachment A: MATS 30-Day Rolling SOz lb/]vlMBtu Average Data Attachment B: SOz Monitor Downtime Events Report Attachment C: Excess Emissions Report Attachment A - MATS 30 Day Rolling Average Plant: HUNTINGTON PLANT Report Period: 0410112024 Throuqh 0613012024 Source: UNIT2 Parameter: MT3SO2#B Date 1-Day Avg 30-Day Avg Total Operating Valid Operating Invalid Operating Monitor AvallabiliW 4t1t2024 0.01 o.o2 720 718 2 99.7% 4t212024 0.0'l 0.02 720 7',18 2 99.7% 4t3t2024 0.01 0.02 720 718 2 99.7% 414t2024 0.01 0.02 720 718 2 99.7o/o 415t2024 0.02 0.02 720 7',18 2 99.70/o 4t6t2024 o.o2 0.02 720 718 2 99.7o/o 4t7DO24 0.02 0.02 720 718 2 99.7Yo 4t8t2024 0.03 o.o2 720 718 2 99.7o/o 4t9t2024 0.04 0.02 720 718 2 99.70/o 4t10t2024 0.04 0.02 720 718 2 99.7o/o 4t11t2024 0.03 o.o2 720 718 2 99.7o/o 4t1212024 0.03 0.02 720 718 2 99.7o/o 4113t2024 0.03 0.02 720 7',!8 2 99.7o/o 4t14t2024 0.05 0.02 720 718 2 99.7o/o 4t15t2024 0.04 0.02 720 718 2 99.7o/o 4t1612024 0.01 0.02 720 718 2 99.7% 4t17D024 o.o2 o.o2 720 718 2 99.70/o 4t18t2024 0.02 0.02 720 718 2 99.7% 4t19t2024 0.03 0.02 720 718 2 99.7o/o 4t20t2024 0.02 0.02 720 718 2 99.704 4t21t2024 0.02 0.02 720 718 2 99.7o/o 4122t2024 0.03 0.02 716 714 2 99.7% 4t23t2024 0.02 0.02 716 714 2 99.7o/o 4t2412024 o.o2 0.02 716 716 0 100.0% 4125t2024 o.o2 0.02 716 716 0 100.0% 4t26t2024 o.o2 0.02 716 716 0 100.0% 4127t2024 0.03 0.02 716 716 0 100.0% 4t28t2024 o.02 o.o2 716 716 0 100.0% 4t2912024 0.03 o.o2 7'.t6 716 0 100.0% 4t30t2024 0.04 o.o2 716 716 0 100.0% 5t1t2024 0.02 0.02 716 716 0 100.0% 5t2t2024 0.02 0.02 716 716 0 100.0% 5t312024 0.03 0.03 716 716 0 100.0% 5t4t2024 o.o2 0.03 716 716 0 100.0% 515t2024 0.01 0.03 716 716 0 100.0% 5t6t2024 o.o2 0.03 716 716 0 100.0% 5n/2024 0.01 0.03 716 716 0 100.0% 5t812024 o.o2 0.03 716 716 0 100.0% 5t9t2024 0.02 o.o2 716 716 0 100.0% 5t10t2024 0.02 0.02 716 716 0 100.0% Value = Offline Data Valuer = Averate represents a building 30D Average Value = Exceedance Report Generate d: 08/ 09 / 24 L3:L2 Report Version 5.2 HTNDAHS04\\reportuser Attachment A - MATS 30 Day Rolling Average Plant: HUNTINGTON PI-ANT Repoft Period: 0410112024 Throuqh 0613012024 Source: UNIT2 Parameter: MT3SO2#B 5t11t2024 0.04 0.02 716 716 0 100.0% 5112t2024 0.03 0.02 716 716 0 100.0% 5t13t2024 0.03 o.o2 716 716 0 100.0% 5l't4t2024 0.03 0.02 716 716 0 100.0% 5t15t2024 0.03 o.o2 716 716 0 100.0olo 5t16t2024 0.03 0.02 716 716 0 100.0olo 5t17t2024 0.01 0.02 716 7',16 0 100.0% 5t18t2024 0.01 0.02 716 716 0 100.0% 5t19t2024 0.02 0.02 716 716 0 100.0% 5t20t2024 0.02 o.o2 716 716 0 100.0% 5t21t2024 0.01 0.02 716 716 0 100.0% 512212024 o.o2 0.02 720 720 0 100.0% 5t23t2024 0.02 o.o2 720 720 0 100.0% 5124t2024 0.01 o.o2 720 720 0 100.0% 5t25t2024 0.00 0.02 720 720 0 '100.0% 5t26t2024 0.01 0.02 720 720 0 100.0% 5127t2024 0.02 0.02 720 720 0 100.0% 5t28t2024 0.04 0.02 720 720 0 100.0% 5t29t2024 0.04 o.o2 720 720 0 100.0% 5t30t2024 0.04 o.o2 720 720 0 100.0% 5t31t2024 0.02 0.02 720 720 0 100.0% 6t112024 0.01 0.02 720 720 0 100.0% 6t2t2024 o.o2 0.02 720 720 0 100.0o/o 6t3t2024 0.02 o.o2 720 720 0 100.0% 6t4t2024 o.o2 0.02 720 720 0 100.0% 6t5t2024 0.02 0.02 720 720 0 100.0% 6t6t2024 0.03 0.02 720 720 0 100.0% 6nt2024 0.03 0.02 720 720 0 00.0% 6t8t2024 0.01 o.o2 720 720 0 00.0% 6t9t2024 0.02 0.02 720 720 0 00.0% 6t10t2024 0.02 0.02 720 720 0 00.0% 6t11t2024 0.01 0.02 720 720 0 00.0% 6112t2024 0.01 0.02 720 720 0 00.0% 6t13t2024 0.02 0.02 720 720 0 00.0% 6t14t2024 0.02 0.02 720 720 0 00.0% 6t1512024 o.02 0.02 720 720 0 00.0% 6116t2024 o.o2 0.02 720 720 0 00.0% 6t17t2024 o.02 0.02 720 720 0 100.0% 6t18t2024 o.02 0.02 720 720 0 100.0% 6119t2024 o.o2 o.o2 720 720 0 100.0% 6t20t2024 0.03 0.02 720 720 0 100.0% 6121t2024 0.03 0.02 720 720 0 100.0% 6t22t2024 0.03 0.02 720 720 0 100.0% Value = Offline Data Valuer = AveraSe represents a building 30D Average Value = Exceedance Report Generated: 08/ 09 / 24 73 :72 Report Version 5.2 HTNDAHS04\\reportuser Attachment A - MATS 30 Day Rolling Average P|ant: HUNTINGTON PLANT Report Period: 0410112024 Throuqh 0613012024 Source: UNIT2 Parameter: MT3SO2#B 6t23t2024 0.05 o.o2 720 720 0 '100.0% 6t24t2024 0.05 0.02 720 720 0 100.0% 6t25t2024 0.03 0.o2 720 720 0 100.0% 6t2612024 0.02 0.02 720 720 0 100.0% 6t27t2024 0.03 o.o2 720 720 0 100.0% 612812024 0.02 0.o2 720 720 0 100.0% 6t29t2024 o.o2 0.02 717 717 0 100.0% 6t30t2024 0.02 o.o2 713 713 0 100.0% Value = Offline Data Valuer = Averate represents a building 30D Average Value = Exceedance Report Generate d: 08 / 09 / 24 t3:12 Report Version 5.2 HTNDAHS04\\reportuser Attachment B CEMS Monitor Outage Report Sulfur Dioxide (SOz) System Monitor Outage (lb/IIMBtu) Total duration of monitor downtime 0 hours Description of Causes/Corective Actions. *Cause: 'Corrective Action: Attachment C Unit L Excess Emissions Report PM Excess Emissions 0.030 lbA,IMBtu (Quarterly Stack Testing) Total time for all excess emissions 0.0 hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No PM Excess Emissions occurred during the reporting period No PM Malfunction occurred during the reporting period SOz Excess Emissions 0.20 lbiMMBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No SOz Excess Emissions occurred during the reporting period SOz monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action llg Excess Emissions 1.2 lb/TBtu (30 Boiler Operating Day Average) Total time for all excess emissions QQ hours Total time for excess emissions occurring during startup/shutdown or malfunction 0.0 hours Malfunction reason and corrective /preventive action taken) No Hg Excess Emissions occurred during the reporting period Hg monitor equipment malfunctions noted in Attachment B. Excess Emission Incident Number Magnitude of Excess Emissions lb/MMBtu Date Time Beginning Time Ending Hours Involved Malfunction Y/N Cause Corrective Action