HomeMy WebLinkAboutDSHW-2024-008459Site Information
Finalized Yes
Facility Name Wasatch Resource Recovery
Facility_ID SW0410
Facility Name Wasatch Resource Recovery
Street Address 1370 W Center Street
City North Salt Lake
ZIP Code 84054
County Davis County
Inspection Date 09-25-2024
Type of Visit Routine Oversite
Is the Visit Announced?No
40.846123, -111.943785
Weather Conditions Sunny, 89 degrees
Inspection Goal Ensure compliance with the facility permit and Utah rules and regulations
Facility Contact Matt Myers
Participants Dan Davies, Assistant Plant Superintendent (Wasatch Resource Recovery),
Kelly Shaw (DWMRC)
Follow Up Inspection Needed?N/A
Recommended Follow Up Date
Depart Office Date 09-25-2024
Depart Office time 09:45 AM (-6 GMT)
Return to Office Date 09-25-2024
Return to Office time 03:00 PM (-6 GMT)
1. Pre-Inspection Review
1.1 Permit Review Yes
Comment The facility accepts food waste and byproducts that are processed to
produce compost, methane and CO2. Methane is pumped into the public
utilities grid.
1.2 Annual Report Review Yes
Comment 15,687 tons received and composted in 2023.
1.3 Previous Inspection Review Yes
Comment No discrepancies were noted
1.4 Facility Contacts Confirmed Yes
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 1 of 7
Comment Matt Myers continues to be the main facility contact
1.5 Facility Contacted (If an
announced inspection)
No
Comment
1.6 Local Health Contacted No
Comment Inspection was not planned 24 hours prior to the visit.
1.7 Other
Comment
2. Facility / Operational Controls (1-Good, 5-Poor)
2.1 Litter 1
2.2 Roads 1
2.3 Gate House Operations NA
2.4 Vectors 1
2.5 Communications 1
2.6 Recycling Area NA
2.7 Fugitive Dust Control NA
2.8 Waste Inspection Area NA
2.9 Scavenging Control NA
2.10 Open Burning NA
2.11 Fences, Gates, Locks,
Access Control
1
2.12 Working Face NA
2.13 Daily - Soil NA
2.14 Daily - Alternative NA
2.15 Leachate Collection System NA
2.16 Other
Comment (Required)The facility is well secured, and is not open to the public. Deliveries are
either brought to the receiving building or pumped directly into tanks.
3. Signs Required / Properly Posted
3.1 Operating Days / Hours N/A
3.2 Directions & Procedures Yes
3.3 Emergency Numbers Yes
3.4 List of Unacceptable Materials N/A
3.5 Other
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 2 of 7
Comment (Required)This facility is not open to the public
4. Operator / Representative / Employees
4.1 On-site While Open Yes
4.2 Training Yes
4.3 Other
Comment (Required)Thorough trainings are performed
5. Monitoring
5.1 Methane Yes
5.2 Random Inspections N/A
5.3 Leachate N/A
5.4 Ground Water N/A
5.5 Other
Comment (Required)Methane produced at the facility is pumped into the grid for public
consumption
6. Drainage / Erosion
6.1 Water Run-on N/A
6.2 Water Run-off N/A
6.3 Other
Comment (Required)Facility is indoors
7. Proper Storage / Isolation / Disposal
7.1 Special Waste N/A
7.2 Batteries N/A
7.3 Hazardous Waste N/A
7.4 Infectious Waste N/A
7.6 Dead Animals N/A
7.7 Asbestos N/A
7.8 Bulky Waste N/A
7.9 Contaminated Soil N/A
7.10 Ash N/A
7.11 Sludge Yes
7.12 Other
Comment (Required)Not applicable to this facility
8. Cover
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 3 of 7
8.1 Intermediate N/A
8.2 Final N/A
8.3 Vegetation N/A
8.4 Other
Comment (Required)Facility is indoors, cover is not necessary
9. Inspection Records
9.1 Random Inspection Report N/A
9.2 Gas Monitoring System Yes
9.3 Surface Drainage Control N/A
9.4 Daily Records Yes
9.5 Weight or Volumes Yes
9.6 Intermediate Cover N/A
9.7 Final Cover N/A
9.8 Self Inspection (Quarterly
Reports)
Yes
9.9 Deviation From Plans No
9.10 Permit, Permit Application,
and Rules Available
Yes
9.11 Other
Comment (Required)Trucks entering weigh in on a scale prior to progressing through the facility.
Dewatered material is sent for composting at Marriott Farms. Thorough
records are kept.
10. Monitoring / Sampling / Analysis Records
10.1 Explosive Gas Monitoring Yes
10.2 Leachate Sampling &
Treatment
N/A
10.3 Ground Water Sampling
Results
N/A
10.4 Other
Comment (Required)Methane produced is monitored. Methane is pumped into the public utilities
grid for consumption
11. Special Waste Records
11.1 Lab Analysis Results N/A
11.2 Manifests N/A
11.3 Treatment Certification N/A
11.4 Paint Filter Test Results N/A
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 4 of 7
11.5 Onsite Treatment
Documentation
N/A
11.6 Other
Comment (Required)Special waste is not received
12. Waste Tires
12.1 Acceptance procedures for
Waste Tires
N/A
12.2 Waste Tire Pile Segregated N/A
12.3 Estimated Quanitity of Waste
Tires
No
Number of Tires
12.4 Waste Tire Fund Training N/A
Comment (Required)Waste tires are not accepted.
13 Other Items
13.1 Notice of Inspections Form
Completed and Signed
N/A
13.2 N/A
13.3 N/A
13.4 N/A
Comment (Required)Not Applicable
14. Special Permit Requirements
14.1 N/A
14.2 N/A
14.3 N/A
Comment (Required)Not Applicable
General Comments
Comments The facility maintains thorough records. The receiving area is within a
building and no litter was observed outside the building. Vectors were not
observed during the inspection.
DWMRC Inspector Signature
DWMRC Inspector Name Kelly Shaw
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 5 of 7
Date/Time 09-25-2024
Photos
Attach Photos
Dewatered biosolids at the end of the process
Dewatered biosolids to be loaded on trucks and sent for composting at Marriott
Farms
Products to be placed in the crushing machine to remove the liquids
Process tanks
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 6 of 7
Receiving building tipping floor
Liquids containers going through the crusher machine in the receiving building
Receiving building tipping floor
Dewatering tank
Date Submitted: 09-26-2024 10:42 AM
Submitted By: kellyshaw@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 7 of 7