Loading...
HomeMy WebLinkAboutDSHW-2024-008459Site Information Finalized Yes Facility Name Wasatch Resource Recovery Facility_ID SW0410 Facility Name Wasatch Resource Recovery Street Address 1370 W Center Street City North Salt Lake ZIP Code 84054 County Davis County Inspection Date 09-25-2024 Type of Visit Routine Oversite Is the Visit Announced?No 40.846123, -111.943785 Weather Conditions Sunny, 89 degrees Inspection Goal Ensure compliance with the facility permit and Utah rules and regulations Facility Contact Matt Myers Participants Dan Davies, Assistant Plant Superintendent (Wasatch Resource Recovery), Kelly Shaw (DWMRC) Follow Up Inspection Needed?N/A Recommended Follow Up Date Depart Office Date 09-25-2024 Depart Office time 09:45 AM (-6 GMT) Return to Office Date 09-25-2024 Return to Office time 03:00 PM (-6 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Comment The facility accepts food waste and byproducts that are processed to produce compost, methane and CO2. Methane is pumped into the public utilities grid. 1.2 Annual Report Review Yes Comment 15,687 tons received and composted in 2023. 1.3 Previous Inspection Review Yes Comment No discrepancies were noted 1.4 Facility Contacts Confirmed Yes Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 7 Comment Matt Myers continues to be the main facility contact 1.5 Facility Contacted (If an announced inspection) No Comment 1.6 Local Health Contacted No Comment Inspection was not planned 24 hours prior to the visit. 1.7 Other Comment 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 1 2.2 Roads 1 2.3 Gate House Operations NA 2.4 Vectors 1 2.5 Communications 1 2.6 Recycling Area NA 2.7 Fugitive Dust Control NA 2.8 Waste Inspection Area NA 2.9 Scavenging Control NA 2.10 Open Burning NA 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face NA 2.13 Daily - Soil NA 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other Comment (Required)The facility is well secured, and is not open to the public. Deliveries are either brought to the receiving building or pumped directly into tanks. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours N/A 3.2 Directions & Procedures Yes 3.3 Emergency Numbers Yes 3.4 List of Unacceptable Materials N/A 3.5 Other Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 7 Comment (Required)This facility is not open to the public 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other Comment (Required)Thorough trainings are performed 5. Monitoring 5.1 Methane Yes 5.2 Random Inspections N/A 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other Comment (Required)Methane produced at the facility is pumped into the grid for public consumption 6. Drainage / Erosion 6.1 Water Run-on N/A 6.2 Water Run-off N/A 6.3 Other Comment (Required)Facility is indoors 7. Proper Storage / Isolation / Disposal 7.1 Special Waste N/A 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals N/A 7.7 Asbestos N/A 7.8 Bulky Waste N/A 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge Yes 7.12 Other Comment (Required)Not applicable to this facility 8. Cover Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 7 8.1 Intermediate N/A 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other Comment (Required)Facility is indoors, cover is not necessary 9. Inspection Records 9.1 Random Inspection Report N/A 9.2 Gas Monitoring System Yes 9.3 Surface Drainage Control N/A 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes 9.9 Deviation From Plans No 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other Comment (Required)Trucks entering weigh in on a scale prior to progressing through the facility. Dewatered material is sent for composting at Marriott Farms. Thorough records are kept. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring Yes 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other Comment (Required)Methane produced is monitored. Methane is pumped into the public utilities grid for consumption 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A 11.4 Paint Filter Test Results N/A Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 7 11.5 Onsite Treatment Documentation N/A 11.6 Other Comment (Required)Special waste is not received 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training N/A Comment (Required)Waste tires are not accepted. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A 13.4 N/A Comment (Required)Not Applicable 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)Not Applicable General Comments Comments The facility maintains thorough records. The receiving area is within a building and no litter was observed outside the building. Vectors were not observed during the inspection. DWMRC Inspector Signature DWMRC Inspector Name Kelly Shaw Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 7 Date/Time 09-25-2024 Photos Attach Photos Dewatered biosolids at the end of the process Dewatered biosolids to be loaded on trucks and sent for composting at Marriott Farms Products to be placed in the crushing machine to remove the liquids Process tanks Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 7 Receiving building tipping floor Liquids containers going through the crusher machine in the receiving building Receiving building tipping floor Dewatering tank Date Submitted: 09-26-2024 10:42 AM Submitted By: kellyshaw@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 7