HomeMy WebLinkAboutDDW-2024-011499Sanitary Survey - Deficiency Report
PWS Number:UTAH25155 Deficiency Points:165 Survey Date:09/26/2024
Survey Name:BUCK HOLLOW BOY SCOUT
CAMP
Surveyor:Chris Bowles
Sanitary Survey Category: SM
SDWIS Severity Code: Recommendation
Management and Operations | DS001 | UTAH25155 DISTRIBUTION SYSTEM
31. Does your water system have an Emergency Response Plan?
Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency
situations. In many areas of the state the possibility of earthquake damage shall be
realistically considered.
Notes:Small System
Deficiency Points: 0
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
35. Legally adopted authority statement
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes a legally adopted and functional local authority to enforce the program
(i.e., ordinance, bylaw, or policy).
Notes:Working on to be ready before spring start up 2025
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M003 CCC-LACKS LOCAL AUTHORITY
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
36. Documentation of annual public awareness and/or employee training
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes providing public education or awareness material or presentations.
Notes:Working on to be ready before spring start up 2025
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
37. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/
GREATER CCC TRAINING)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes an operator with adequate training in the area of cross connection control
or backflow prevention.
Notes:Working on to have some one trained before spring start up 2025
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
38. Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps
installed within the system)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes written records of cross connection control activities.
Notes:Working on to be ready to start Documentation for 2025 season
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M006 CCC-LACKS WRITTEN RECORDS OF CCC ACTIVITIES
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:No records as its been inactive, but working on implmenting enforcement and compliance
before spring start up 2025
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: OC
SDWIS Severity Code: Significant Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
40. Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT )
Rule: R309-105-11, R309-300-5(3)Rule requires every community and NTNC water system and public water systems that
utilize treatment/filtration to have at least one operator certified at the classified grade
of the water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
Notes:No Operator on record yet, but plan to have in place for 2025 season.
Deficiency Points: 50
Days until points become effective on IPS: 120
SDWIS Deficiency Description: C001 SYSTEM DIRECT RESPONSIBLE CHARGE OPERATORS NOT CERTIFIED AT THE
REQUIRED LEVEL
Sanitary Survey Category: OC
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH25155 DISTRIBUTION SYSTEM
41. Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT )
Rule: R309-300-5(14)Rule requires the operator to be within 1 hour travel time, under normal work and
home conditions, of each drinking water system for which he is considered in direct
responsible charge.
Notes:No Operator on record yet, but plan to have in place for 2025 season
Deficiency Points: 0
Days until points become effective on IPS: 0
SDWIS Deficiency Description: C002 OPERATOR NOT AVAILABLE WITHIN 1 HOUR TRAVEL TIME
Sanitary Survey Category: DS
SDWIS Severity Code: Recommendation
Distribution | DS001 | UTAH25155 DISTRIBUTION SYSTEM
45. Water system has a program to maintain, operate, or control the use of fire hydrants.
Rule: N/A Fire hydrants provide a direct access to the water in the distribution system. In order
to protect the quality and integrity of the water, fire hydrant access should be
controlled.
Notes:No program in place, but working to have program for 2025 season. Located 3 hydrants
along road from tank to camp sites.
Deficiency Points: 0
Days until points become effective on IPS: 0
SDWIS Deficiency Description: D012 FIRE HYDRANT USE POLICY INADEQUATE
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | WELL
61. Provisions available to periodically measure water levels
Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the
completed well.
Notes:No way to measure well levels and draw downs
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Wells | WS001 | WELL
63. Well head or well house and equipment protected from flooding
Rule: R309-515-6(6)(b)(vi), R309-515-
6(12)(d)(iii), R309-515-6(13)(a) to (d)
Top of well casing shall terminate at least 18” above ground level or 12” above well
house floor and for sites that flood at least 3’ above 100-year flood level or highest
known flood elevation. Well casing terminating in underground vault shall have a drain
to daylight and surface runoff directed away from vault access. Well house floor shall
be sloped for drainage, and have a drain to daylight unless highly impractical. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
Notes:Well Vault shall have excavation backfill to direct runoff away from vault. Drain shall be
installed to daylight and discharge 12" above grade and be screened with #4 mesh.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S020 WELL HEAD OR WELL HOUSE NOT PROTECTED FROM FLOODING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | WELL
67. Well discharge line has a check valve.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:Not visible in Vault
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S024 NO CHECK VALVE ON WELL DISCHARGE PIPING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS001 | WELL
70. Well discharge line has a shut-off valve (last item from the well head).
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:Not visible in Well Vault, need to verify if one of the valves on north side of tank can be used
as shut off valve for well.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S027 NO SHUT OFF VALVE ON WELL DISCHARGE PIPING