Utah Division of Drinking Water ― Checklist for Issuing Operating Permits
Water System Name: System Number:
Project Description: File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating
permit issuance (unless a water line project meets the requirements of R309-500-7 and is not required
to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed
into service prior to submitting all of the following items and receipt of Operating Permit if the water
system has received items 1 and 4 below.
☐ 1. Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of
Plan Approval were accomplished, and if applicable, changes made during construction were
in conformance with rules R309-500 through 550
☐ 2. As-built or record drawings incorporating all changes to approved plans and specifications
(unless no changes were made to the previously approved plans during construction)
☐ 3. Confirmation that as-built or record drawings have been received by the water system
☐ 4. Satisfactory bacteriological samples as evidence of proper disinfection and flushing in
accordance with the appropriate ANSI/AWWA standards:
☐ ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water Mains
Two consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200
feet, end-of-line, each branch)
☐ ANSI/AWWA C652-11 AWWA Standard for Disinfection of Water-Storage Facilities
One or more samples, none positive
☐ ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment Plants
Two consecutive samples per unit, none positive, no less than 30 minutes apart
☐ ANSI/AWWA C654-13 AWWA Standard for Disinfection of Wells
Two consecutive samples, none positive, no less than 30 minutes apart
☐ 5. Water quality data, where appropriate [For example, include raw and finished water data
that demonstrate satisfactory performance of the treatment facility; sample should be taken
from a storage tank for residual volatile organic compounds after tank interior re-coating;
etc.]
☐ 6. If applicable, all other documentation that may have been required during the plan review
process
☐ 7. If applicable, confirmation that the water system owner has received the O&M manual for
the new facility
☐ 8. If applicable, location data of new storage tank, treatment facility, or source
Penneys Grill
Installation of a liquid sodium
hypochlorite chlorinator system (TP001)
23075
13047
x
x
x
x
x
x
x
Attached is the updated CT Calculation with two (2) 80-gallon
disinfection tanks and 2 mg/L residual chlorine.x
x
Disinfection system is located in the basement of Penny's Cafe at
approximately 40o23'20.27"N, 112o23'10.54"W.