HomeMy WebLinkAboutDDW-2024-011256Sanitary Survey - Deficiency Report
PWS Number:UTAH23085 Deficiency Points:75 Survey Date:09/24/2024
Survey Name:ENERGY SOLUTIONS Surveyor:Wade Tolbert
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST003 | MIXED WASTE AREA STORAGE TANK
89C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:The seal isn't intact. It was inside the seal area.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST004 | DECON ACCESS CONTROL BLD TANK
102C. Vent covered with #14 or finer non-corrodible mesh screen.
Rule: R309-545-15(4)Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-
corrodible screen and vents 6-inches or greater in diameter to be fitted with additional
heavy gauge screen or substantial covering to protect the #14 mesh screen from
vandalism or damage. This significant deficiency must be corrected within 120 days of
notification or have a compliance action plan approved by DDW.
Notes:The vent is covered but has been squished and should be replaced.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V007 STORAGE TANK VENT LACKS NO. 14 SCREEN
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST004 | DECON ACCESS CONTROL BLD TANK
103C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:Not able to confirm. The delivery pipe of the hauled water has been hard plumbed into the
access lid. It can be taken apart and the seal could have been verified but was not done on
the survey. The seal should be verified.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME