Loading...
HomeMy WebLinkAboutDSHW-2024-007798CIVCO Engineering, Inc. Civil Engineering Consultants PO Box 1758 * 1256 W 400 S, Suite 1 Vernal, Utah 84078 Phone (435)789-5448 * Fax (435)789-4485 Email: civco@civcoengineering.com ENVIRONMENT ENERGY INNOVATIONS PLEASANT VALLEY, UTAH CLOSURE COSTS The EEI facility is planned to close each cell as the waste reaches the final design grade. The closure cost for the EEI facility is based on the cost of the placement and grading of 18 inches of compacted soil, or equivalent, with a permeability of 1x10-5 cm/sec or less, or equivalent placed upon the final lifts and a 6-inch topsoil layer and seeding of topsoil. Closure cost estimates were obtained from an independent contractor. Upon closure of all cells the parking area, office spaces, and loading and unloading facilities will be removed and the area graded, topsoil layer added and seeding of topsoil to provide a natural looking surface. The cost of doing this work is estimated at $20,000. The closure cost of cell 7 is $1,055,000 as shown in Table 1. Closure Cost for Cell 7 Task Description Total Cost Details Closure Cost Per Cell Letter of Notification of Closure $2,000 Letter to DWMRC and County Cover and Topsoil Material $1,020,000 Seeding/Mulching $8,000 Contingency $25,000 Total Cost Per Cell $1,055,000 Table 1 Closure Costs POST CLOSURE CARE COSTS Post closure care of inactive sections of the EEI facility will consist of maintaining the integrity of the final and vegetative covers. Any areas subject to erosion will be corrected and appropriate measures will be implemented to identify and eliminate the run-on source. No active or technical devices are proposed for at the EEI facility. Best management practices will be implemented to minimize infiltration and assure the integrity of the run-on/run-off system. An evaluation of the system will be made during the quarterly inspections and corrective measures if any will be implemented. All run-on and run-off from events smaller than the 25-year storm will be controlled through drainage design. Post closure care costs are estimated by the cost of maintaining the previously described activities for a 30-year period. The estimated cost of the post closure care tasks is approximately $31,000 for cell 7 as shown in Table 2. Post Cost for EEI Facility Page | 2 Task Description Unit Cost Hours per year Unit Type Years Total Units Total Cost 28 years Details Inspections Quarterly 1st 2 years; $30 4 hours 2 8 $240 Semiannually for 28 years $30 2 hours 28 56 $1,680 Ground Water Testing Not required as investigations have revealed there is no ground water present near the site Report Quarterly 1st 2 years; $30 4 hours 2 8 $240 Semiannually for 28 years $30 2 hours 28 56 $1,680 Subtotal for 30 years $3,840 Maintenance Replacing topsoil 1 $24,000 Assumes 10% will need to be replaced Reseeding 1 $1,000 Assumes 10% will need to be replaced Subtotal for 30 years $28,840 Contingency $2,900 (10%) Post Closure Cost cell 7 $31,740 Table 2 Post Closure Care Costs