HomeMy WebLinkAboutDDW-2024-011197
September 24, 2024
Justin Jackson
Fairview City
P.O. Box 97
Fairview, Utah 84629
Subject:Plan Approval, Spring Supply Pipeline & Access Hatch Replacement Project (WS001 & WS002); Fairview City, System #20012, File #16508
Dear Justin Jackson:The Division of Drinking Water (the Division) received the plans and specifications for the proposed Spring Supply Pipeline & Access Hatch Replacement Project from
your consultant, David Dillman with Horrocks Engineering on September 10, 2024. Written review comments were provided to your consultant on September 11, 2024. The Division received
the revised plans and specifications on September 13, 2024. This project has met the conditions for receiving a plan approval.
Our understanding of the project is that approximately 1,200 feet of new 10-inch diameter HDPE pipeline will be installed between the Lower Tollgate Spring (WS002) and the Little Bear
Spring (WS003). This new spring supply pipeline will remove two aerial creek crossings by keeping the new pipeline on the south side of Cottonwood Creek. In addition to replacing that
section of the spring supply pipeline, this project includes replacing the existing access hatches on the Upper Tollgate Spring Box (WS001) and the Lower Tollgate Spring Box (WS002).
We have completed our review of the plans and specifications, stamped, and signed by David H. Dillman, P.E., dated September 10, 2024, as well as the addendum dated September 13, 2024,and
found they basically comply with the applicable portions of Utah’s Administrative Rules for Public Drinking Water Systems in R309. On this basis, the plans for the Spring Supply Pipeline
& Access Hatch Replacement Projectare hereby approved.
This approval pertains to construction only. An Operating Permit must be obtained from the Director before the Spring Supply Pipeline may be put in service. A checklist outlining the
items required for operating permit issuance is enclosed for your information.Approvals or permits from the local authority or the county may be necessary before beginning construction
of this project. As the project proceeds, notice of any changes in the approved design, as well as any change affecting the quantity or quality of the delivered water, must be submitted
to the Division. We may also conduct interim and final inspections of this project. Please notify us when actual construction begins so that these inspections can be scheduled.
This approval must be renewed if construction has not begun or if substantial equipment has not been ordered within one year of the date of this letter.
If you have any questions regarding this approval, please contact John Chartier, P.E., DEQ Central District Engineer, at (435) 559-1969, or me at (385) 515-1464.
Sincerely,
Michael Newberry, P.E.
Permitting and Engineering Support Manager
JLC/mrn/mdbEnclosures –Operating Permit Checklistcc:Eric Larsen, Central Utah Public Health, elarsen@centralutahhealth.org David Dillman, P.E.,Horrocks Engineering, dave@horrocks.com
Justin Jackson, Fairview City, fairviewcitysewer@gmail.com John Chartier, P.E., DEQ Central District Engineer, jchartier@utah.gov jchartier 20012 16508 PA
Utah Division of Drinking Water ― Checklist for Issuing Operating PermitsWater System Name:System Number: Project Description:File Number:
Items 1 through 8 below must be submitted to the Division and found to be acceptable prior to operating permit issuance (unless a water line project meets the requirements of R309-500-7
and is not required to obtain an Operating Permit).
Distribution lines (not including in-line booster pump stations) requiring Plan Approval may be placed into service prior to submitting all of the following items and receipt of Operating
Permit if the water system has received items 1 and 4 below.☐1.Certification of Rule Conformance by a professional engineer (P.E.) that all conditions of Plan Approval were accomplished,
and if applicable, changes made during construction were in conformance with rules R309-500 through 550☐2.As-built or record drawings incorporating all changes to approved plans and
specifications (unless no changes were made to the previously approved plans during construction)☐3.Confirmation that as-built or record drawings have been received by the water system☐4.Satisfactory
bacteriological samples as evidence of proper disinfection and flushing in accordance with the appropriate ANSI/AWWA standards:
☐ANSI/AWWA C651-14 AWWA Standard for Disinfecting Water MainsTwo consecutive sample sets at least 16 hours apart, none positive (e.g., every 1,200 feet, end-of-line, each branch)☐ANSI/AWWA
C652-11 AWWA Standard for Disinfection of Water-Storage FacilitiesOne or more samples, none positive☐ANSI/AWWA C653-13 AWWA Standard for Disinfection of Water Treatment PlantsTwo consecutive
samples per unit, none positive, no less than 30 minutes apart☐ANSI/AWWA C654-13 AWWA Standard for Disinfection of WellsTwo consecutive samples, none positive, no less than 30 minutes
apart☐5.Water quality data, where appropriate [For example, include raw and finished water data that demonstrate satisfactory performance of the treatment facility; sample should be
taken from a storage tank for residual volatile organic compounds after tank interior re-coating; etc.]☐6.If applicable, all other documentation that may have been required during the
plan review process☐7.If applicable, confirmation that the water system owner has received the O&M manual for the new facility☐8.If applicable, location data of new storage tank, treatment
facility, or source