HomeMy WebLinkAboutDERR-2024-010903Utah Department of Environmental Quality - UST Release Detection
TANK OWNERSHIP
Name PILOT TRAVEL CENTERS LLC
Address PO BOX 10146
KNOXVILLE, TN 37909
Contact PILOT TRAVEL CENTERS LLC
Phone
Email joey.cupp@pilottravelcenters.com
TANK LOCATION
Name FLYING J TRAVEL PLAZA # 773
Address 25 E FLYING J DR
RICHFIELD, UT 84701
A Operator Charles Hughes
Phone (865) 206-5269
B Operator STEPHEN THOMAS HAMPTON
Phone (614) 923-0154
Facility ID: 2000411 Inspection Date: 09/17/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 1/2 Gasoline Yes Steel Flex in Sump July 19,
1990
July 19,
1990
Yes No None None
2 - 3/4 Gasoline Yes Steel Flex in Sump July 19,
1990
July 19,
1990
Yes No None None
3 - 5/6 Gas/Diesel Yes Steel Flex in Sump July 19,
1990
July 19,
1990
Yes No None None
4 - 7/8 Gas/Diesel Yes Steel Flex in Sump July 19,
1990
July 19,
1990
Yes No None None
5 - 9/10 Gasoline Yes Steel Flex in Sump July 19,
1990
July 19,
1990
Yes No None None
6 -
11/12
Gasoline Yes Steel Flex in Sump July 19,
1990
July 19,
1990
Yes No None None
7 - 13
Main
Diesel No Booted Steel Flex July 19,
1990
None Yes Yes None None
8 - 14M
/ 13S
Diesel No Booted Steel Flex July 19,
1990
None Yes Yes None None
9 - 15M
/ 14S
Diesel No Booted Steel Flex July 19,
1990
None Yes Yes None None
10 -
16M
Diesel No Steel Flex Galvanic
CP
July 19,
1990
None Yes Yes None May 7,
2017
11 -
17M
Diesel No Steel Flex Galvanic
CP
July 19,
1990
None Yes Yes None May 7,
2017
12 - 17
S
Diesel No Steel Flex Galvanic
CP
July 19,
1990
None Yes No None May 7,
2017
13 - 15
S
Diesel No Booted Steel Flex July 19,
1990
None Yes No None None
14 - 16
S
Diesel No Steel Flex Galvanic
CP
July 19,
1990
None Yes No None May 7,
2017
TANK DETAILS
2024-09-17 Page 1 of 10
Tank ID/Alt ID 1 / 1
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc July 19, 1990 / 12000 / West
Substance
Stored Gasoline / Regular
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD
Manifolded
LTT Test None
LLD Test April 25, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankSIR
PipeAutoLineLeakDetection /
PipeSIR
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 2 / 2
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc July 19, 1990 / 12000 / West
Center
Substance
Stored Gasoline / Premium
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD
Manifolded
LTT Test None
LLD Test April 25, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Automatic
shutoff / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankSIR
PipeAutoLineLeakDetection /
PipeSIR
CP Tank Test None
CP Pipe Test None
Tank ID/Alt ID 3 / 3
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc July 19, 1990 / 12000 / East
Center
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD
Manifolded
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Siphon Bar / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankSIR
PipeAutoLineLeakDetection /
PipeSIR
CP Tank Test None
CP Pipe Test None
2024-09-17 Page 2 of 10
Tank ID/Alt ID 4 / 4
E-Gen/AST No / No
Siphon/Compart Yes / No
Tank Status Currently In Use
Installed/Cap/Loc July 19, 1990 / 20000 / East
Substance
Stored Diesel /
Tank Material-
Mod
Fiberglass Reinforced Plastic-
None
ATG Veeder Root / TLS-450 CSLD
Manifolded
LTT Test None
LLD Test April 25, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
None
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless LD2000
Spill/Overfill/Sm
Delivery
5 gal. Double Walled Spill Bucket /
Automatic shutoff / No
PST Fund/Other
Type No / Insurance
Tank/Pipe Rel
Det
TankSIR
PipeAutoLineLeakDetection /
PipeSIR
CP Tank Test None
CP Pipe Test None
INSPECTION COMMENTS
None
2024-09-17 Page 3 of 10
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Financial Responsibility
Financial responsibility method is ok?Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?No
C Operators trained?Yes
TANK RESPONSES
Tank 1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 1 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 2 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
2024-09-17 Page 4 of 10
Tank 1 SIR/MTG
SIR - Dispensers have current
calibration stickers or proper calibration
documentation?
Yes
SIR - Drop tubes are present and
extend to within one foot of the tank
bottom?
Yes
SIR - Inventory readings for product
inputs, withdrawals, and the amount
remaining in the tank are recorded and
available for each operating day?
Yes
SIR - Product inputs are reconciled with
delivery receipts by measurement of
the tank inventory volume before and
after deliveries?
Yes
SIR - Records include the appropriate
number of water readings, and water
readings are used to adjust inventory
balances as necessary?
Yes
SIR/MTG - An appropriate calibration
chart is used to convert product level
readings to gallons, and is available for
review?
Yes
SIR/MTG - Inventory readings are
properly reconciled monthly (weekly
and monthly for MTG) to the
appropriate allowable amount?
Yes
SIR/MTG - Equipment used to take
readings (ATG, Gauge Stick, etc.) is
adequate, accessible, and operational?
Yes
SIR/MTG - Documentation of valid
testing or monitoring is available (must
have records for the two most recent
months and 10 of last 12 months)?
Show results in the RD tab.
Yes
Tank 2 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 2 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 2 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 2 SIR/MTG
SIR - Dispensers have current
calibration stickers or proper calibration
documentation?
Yes
SIR - Drop tubes are present and
extend to within one foot of the tank
bottom?
Yes
SIR - Inventory readings for product
inputs, withdrawals, and the amount
remaining in the tank are recorded and
available for each operating day?
Yes
SIR - Product inputs are reconciled with
delivery receipts by measurement of
the tank inventory volume before and
after deliveries?
Yes
SIR - Records include the appropriate
number of water readings, and water
readings are used to adjust inventory
balances as necessary?
Yes
SIR/MTG - An appropriate calibration
chart is used to convert product level
readings to gallons, and is available for
review?
Yes
SIR/MTG - Inventory readings are
properly reconciled monthly (weekly
and monthly for MTG) to the
appropriate allowable amount?
Yes
SIR/MTG - Equipment used to take
readings (ATG, Gauge Stick, etc.) is
adequate, accessible, and operational?
Yes
SIR/MTG - Documentation of valid
testing or monitoring is available (must
have records for the two most recent
months and 10 of last 12 months)?
Show results in the RD tab.
Yes
Tank 3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 3 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
2024-09-17 Page 5 of 10
Tank 3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 3 Suction Piping Leak Detection
U.S. suction piping has a valid LTT
every 3 years or monthly monitoring?Yes
Piping qualifies as Safe Suction.
(Documentation is available and
verifiable to show that piping operates
at less than atmospheric pressure, has
only one check valve (under pump),
and has proper slope of piping. If all
these criteria are met, no leak
detection is required on the piping.)
Yes
Tank 3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 4 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank 3 SIR/MTG
SIR - Dispensers have current
calibration stickers or proper calibration
documentation?
Yes
SIR - Drop tubes are present and
extend to within one foot of the tank
bottom?
Yes
SIR - Inventory readings for product
inputs, withdrawals, and the amount
remaining in the tank are recorded and
available for each operating day?
Yes
SIR - Product inputs are reconciled with
delivery receipts by measurement of
the tank inventory volume before and
after deliveries?
Yes
SIR - Records include the appropriate
number of water readings, and water
readings are used to adjust inventory
balances as necessary?
Yes
SIR/MTG - An appropriate calibration
chart is used to convert product level
readings to gallons, and is available for
review?
Yes
SIR/MTG - Inventory readings are
properly reconciled monthly (weekly
and monthly for MTG) to the
appropriate allowable amount?
Yes
SIR/MTG - Equipment used to take
readings (ATG, Gauge Stick, etc.) is
adequate, accessible, and operational?
Yes
SIR/MTG - Documentation of valid
testing or monitoring is available (must
have records for the two most recent
months and 10 of last 12 months)?
Show results in the RD tab.
Yes
Tank 4 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 4 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
2024-09-17 Page 6 of 10
Tank 4 SIR/MTG
SIR - Dispensers have current
calibration stickers or proper calibration
documentation?
Yes
SIR - Drop tubes are present and
extend to within one foot of the tank
bottom?
Yes
SIR - Inventory readings for product
inputs, withdrawals, and the amount
remaining in the tank are recorded and
available for each operating day?
Yes
SIR - Product inputs are reconciled with
delivery receipts by measurement of
the tank inventory volume before and
after deliveries?
Yes
SIR - Records include the appropriate
number of water readings, and water
readings are used to adjust inventory
balances as necessary?
Yes
SIR/MTG - An appropriate calibration
chart is used to convert product level
readings to gallons, and is available for
review?
Yes
SIR/MTG - Inventory readings are
properly reconciled monthly (weekly
and monthly for MTG) to the
appropriate allowable amount?
Yes
SIR/MTG - Equipment used to take
readings (ATG, Gauge Stick, etc.) is
adequate, accessible, and operational?
Yes
SIR/MTG - Documentation of valid
testing or monitoring is available (must
have records for the two most recent
months and 10 of last 12 months)?
Show results in the RD tab.
Yes
DISPENSER RESPONSES
Dispenser 3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-09-17 Page 7 of 10
Dispenser 7/8
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 11/12
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 14M / 13S
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 16M
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 5/6
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 9/10
Flex connectors at the dispensers are
protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 13 Main
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 15M / 14S
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-09-17 Page 8 of 10
Dispenser 17 S
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 16 S
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 17M
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 15 S
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
MONTHLY LEAK DETECTION MONITORING
Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24
Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
NON-COMPLIANCE ITEMS
All items are in compliance.
2024-09-17 Page 9 of 10
Prepared by fueloperator.com
Inspection Information
Inspector:Warner, Sean
Record Created:Sept. 17, 2024, 1:54
p.m.
Inspection
Date:Sept. 17, 2024
2024-09-17 Page 10 of 10