Loading...
HomeMy WebLinkAboutDERR-2024-010903Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name PILOT TRAVEL CENTERS LLC Address PO BOX 10146 KNOXVILLE, TN 37909 Contact PILOT TRAVEL CENTERS LLC Phone Email joey.cupp@pilottravelcenters.com TANK LOCATION Name FLYING J TRAVEL PLAZA # 773 Address 25 E FLYING J DR RICHFIELD, UT 84701 A Operator Charles Hughes Phone (865) 206-5269 B Operator STEPHEN THOMAS HAMPTON Phone (614) 923-0154 Facility ID: 2000411 Inspection Date: 09/17/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 1/2 Gasoline Yes Steel Flex in Sump July 19, 1990 July 19, 1990 Yes No None None 2 - 3/4 Gasoline Yes Steel Flex in Sump July 19, 1990 July 19, 1990 Yes No None None 3 - 5/6 Gas/Diesel Yes Steel Flex in Sump July 19, 1990 July 19, 1990 Yes No None None 4 - 7/8 Gas/Diesel Yes Steel Flex in Sump July 19, 1990 July 19, 1990 Yes No None None 5 - 9/10 Gasoline Yes Steel Flex in Sump July 19, 1990 July 19, 1990 Yes No None None 6 - 11/12 Gasoline Yes Steel Flex in Sump July 19, 1990 July 19, 1990 Yes No None None 7 - 13 Main Diesel No Booted Steel Flex July 19, 1990 None Yes Yes None None 8 - 14M / 13S Diesel No Booted Steel Flex July 19, 1990 None Yes Yes None None 9 - 15M / 14S Diesel No Booted Steel Flex July 19, 1990 None Yes Yes None None 10 - 16M Diesel No Steel Flex Galvanic CP July 19, 1990 None Yes Yes None May 7, 2017 11 - 17M Diesel No Steel Flex Galvanic CP July 19, 1990 None Yes Yes None May 7, 2017 12 - 17 S Diesel No Steel Flex Galvanic CP July 19, 1990 None Yes No None May 7, 2017 13 - 15 S Diesel No Booted Steel Flex July 19, 1990 None Yes No None None 14 - 16 S Diesel No Steel Flex Galvanic CP July 19, 1990 None Yes No None May 7, 2017 TANK DETAILS 2024-09-17 Page 1 of 10 Tank ID/Alt ID 1 / 1 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 19, 1990 / 12000 / West Substance Stored Gasoline / Regular Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Veeder Root / TLS-450 CSLD Manifolded LTT Test None LLD Test April 25, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankSIR PipeAutoLineLeakDetection / PipeSIR CP Tank Test None CP Pipe Test None Tank ID/Alt ID 2 / 2 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 19, 1990 / 12000 / West Center Substance Stored Gasoline / Premium Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Veeder Root / TLS-450 CSLD Manifolded LTT Test None LLD Test April 25, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankSIR PipeAutoLineLeakDetection / PipeSIR CP Tank Test None CP Pipe Test None Tank ID/Alt ID 3 / 3 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc July 19, 1990 / 12000 / East Center Substance Stored Diesel / Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Veeder Root / TLS-450 CSLD Manifolded LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Siphon Bar / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankSIR PipeAutoLineLeakDetection / PipeSIR CP Tank Test None CP Pipe Test None 2024-09-17 Page 2 of 10 Tank ID/Alt ID 4 / 4 E-Gen/AST No / No Siphon/Compart Yes / No Tank Status Currently In Use Installed/Cap/Loc July 19, 1990 / 20000 / East Substance Stored Diesel / Tank Material- Mod Fiberglass Reinforced Plastic- None ATG Veeder Root / TLS-450 CSLD Manifolded LTT Test None LLD Test April 25, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / None Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless LD2000 Spill/Overfill/Sm Delivery 5 gal. Double Walled Spill Bucket / Automatic shutoff / No PST Fund/Other Type No / Insurance Tank/Pipe Rel Det TankSIR PipeAutoLineLeakDetection / PipeSIR CP Tank Test None CP Pipe Test None INSPECTION COMMENTS None 2024-09-17 Page 3 of 10 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Financial Responsibility Financial responsibility method is ok?Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?No C Operators trained?Yes TANK RESPONSES Tank 1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 1 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes 2024-09-17 Page 4 of 10 Tank 1 SIR/MTG SIR - Dispensers have current calibration stickers or proper calibration documentation? Yes SIR - Drop tubes are present and extend to within one foot of the tank bottom? Yes SIR - Inventory readings for product inputs, withdrawals, and the amount remaining in the tank are recorded and available for each operating day? Yes SIR - Product inputs are reconciled with delivery receipts by measurement of the tank inventory volume before and after deliveries? Yes SIR - Records include the appropriate number of water readings, and water readings are used to adjust inventory balances as necessary? Yes SIR/MTG - An appropriate calibration chart is used to convert product level readings to gallons, and is available for review? Yes SIR/MTG - Inventory readings are properly reconciled monthly (weekly and monthly for MTG) to the appropriate allowable amount? Yes SIR/MTG - Equipment used to take readings (ATG, Gauge Stick, etc.) is adequate, accessible, and operational? Yes SIR/MTG - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 2 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 2 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 2 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 2 SIR/MTG SIR - Dispensers have current calibration stickers or proper calibration documentation? Yes SIR - Drop tubes are present and extend to within one foot of the tank bottom? Yes SIR - Inventory readings for product inputs, withdrawals, and the amount remaining in the tank are recorded and available for each operating day? Yes SIR - Product inputs are reconciled with delivery receipts by measurement of the tank inventory volume before and after deliveries? Yes SIR - Records include the appropriate number of water readings, and water readings are used to adjust inventory balances as necessary? Yes SIR/MTG - An appropriate calibration chart is used to convert product level readings to gallons, and is available for review? Yes SIR/MTG - Inventory readings are properly reconciled monthly (weekly and monthly for MTG) to the appropriate allowable amount? Yes SIR/MTG - Equipment used to take readings (ATG, Gauge Stick, etc.) is adequate, accessible, and operational? Yes SIR/MTG - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 3 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes 2024-09-17 Page 5 of 10 Tank 3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 3 Suction Piping Leak Detection U.S. suction piping has a valid LTT every 3 years or monthly monitoring?Yes Piping qualifies as Safe Suction. (Documentation is available and verifiable to show that piping operates at less than atmospheric pressure, has only one check valve (under pump), and has proper slope of piping. If all these criteria are met, no leak detection is required on the piping.) Yes Tank 3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 4 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank 3 SIR/MTG SIR - Dispensers have current calibration stickers or proper calibration documentation? Yes SIR - Drop tubes are present and extend to within one foot of the tank bottom? Yes SIR - Inventory readings for product inputs, withdrawals, and the amount remaining in the tank are recorded and available for each operating day? Yes SIR - Product inputs are reconciled with delivery receipts by measurement of the tank inventory volume before and after deliveries? Yes SIR - Records include the appropriate number of water readings, and water readings are used to adjust inventory balances as necessary? Yes SIR/MTG - An appropriate calibration chart is used to convert product level readings to gallons, and is available for review? Yes SIR/MTG - Inventory readings are properly reconciled monthly (weekly and monthly for MTG) to the appropriate allowable amount? Yes SIR/MTG - Equipment used to take readings (ATG, Gauge Stick, etc.) is adequate, accessible, and operational? Yes SIR/MTG - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 4 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes 2024-09-17 Page 6 of 10 Tank 4 SIR/MTG SIR - Dispensers have current calibration stickers or proper calibration documentation? Yes SIR - Drop tubes are present and extend to within one foot of the tank bottom? Yes SIR - Inventory readings for product inputs, withdrawals, and the amount remaining in the tank are recorded and available for each operating day? Yes SIR - Product inputs are reconciled with delivery receipts by measurement of the tank inventory volume before and after deliveries? Yes SIR - Records include the appropriate number of water readings, and water readings are used to adjust inventory balances as necessary? Yes SIR/MTG - An appropriate calibration chart is used to convert product level readings to gallons, and is available for review? Yes SIR/MTG - Inventory readings are properly reconciled monthly (weekly and monthly for MTG) to the appropriate allowable amount? Yes SIR/MTG - Equipment used to take readings (ATG, Gauge Stick, etc.) is adequate, accessible, and operational? Yes SIR/MTG - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes DISPENSER RESPONSES Dispenser 3/4 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 1/2 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-09-17 Page 7 of 10 Dispenser 7/8 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 11/12 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 14M / 13S Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 16M Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 5/6 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 9/10 Flex connectors at the dispensers are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 13 Main Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 15M / 14S Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-09-17 Page 8 of 10 Dispenser 17 S Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 16 S Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 17M Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 15 S Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes MONTHLY LEAK DETECTION MONITORING Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Tank 1 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 2 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 3 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Tank 4 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass NON-COMPLIANCE ITEMS All items are in compliance. 2024-09-17 Page 9 of 10 Prepared by fueloperator.com Inspection Information Inspector:Warner, Sean Record Created:Sept. 17, 2024, 1:54 p.m. Inspection Date:Sept. 17, 2024 2024-09-17 Page 10 of 10