Loading...
HomeMy WebLinkAboutDDW-2024-011138Sanitary Survey - Deficiency Report PWS Number:UTAH02003 Deficiency Points:55 Survey Date:08/26/2024 Survey Name:BOTHWELL TOWN WATER SYSTEM Surveyor:Ben Harker Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH02003 DISTRIBUTION SYSTEM 37. Documentation of personnel trained to manage the program (ALL COMUNITY WATER SYSTEMS REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. Notes:No current Cross Connection Control Program Administrator currently. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M005 CCC-LACKS OPERATOR TRAINING Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH02003 DISTRIBUTION SYSTEM 39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:"Documentation of personnel trained to manage the program" was deficient, so on-going enforcement is deficient. Once a Program Administrator is put in place, this deficiency can be removed as well. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: FW SDWIS Severity Code: Significant Deficiency Storage Tanks | ST001 | EAST TANK 109A. Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin Rule: R309-545-10(1)(d)If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Drain line was buried underground. This has already been remediated and will be reflected on an IPS Deficiency Correction Notice. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: V016 END OF TANK DRAIN LINE LACKS A CLEARANCE OF AT LEAST 12 INCHES