Loading...
HomeMy WebLinkAboutDERR-2024-010825by Waters, Sherrie 1200064 IRS 1160 W 1200 S Ogden, UT 84201 Piping Closure Pictures August 14, 2024 Left: Transition sump. Piping closure from the transition sump to the building. Right: Sump for tank 4, transition sump is behind the bushes towards the outside of the building. Middle: Sump and Trap on-site removing fuel (19 gallons) from the line. Bottom left: Transition sump (left line is the return, right line is the supply). Top left: Transition sump lines continue into the IRS building. Sample site for SS-1. Top right: Lines continue into the building and end. Left line is the supply, right line is the return. Top left: Lines in the building. SS-1 and USC-1 sample SS-2 taken on the other side of this exterior wall to the east of SS-1. Sump and Trap removed 16 gallons of fuel from the right pipe. It was not connected to the transition sump or to the sump for tank 4. Unknown where these lines end. Boiler level meter and generator level meter Meter levels did not change after 16 gallons of fuel was removed. Looking east into the building (exterior wall is on the right, samples were taken outside of the building). Using the yellow rags drum as reference. Piping for SS-1 is near the blue corrugated piping and piping for SS-2 is behind the red piping system. Transition sump lines capped. Left: Before being capped. Right: After being capped.