Loading...
HomeMy WebLinkAboutDSHW-2024-008335ENVIRONMENTAL CLEANUP PROGRAM – SITE VISIT REPORT SITE NAME: Fairchild Semi-conductor DATE: 9/16/2024 LOCATION: 3333 W 9000 S South Jordan UT PROJECT MANAGER: SITE STATUS Active Investigation Ongoing Cleanup Activities Confirmation Sampling X Long-term Institutional Controls in-place (Site Management Plan &/or Environmental Covenant) Long-term Groundwater Monitoring Closed w/ No More Work Needed OTHER (describe): PURPOSE OF SITE VISIT X Drive-by (windshield survey) Sample Observation &/or Collection Site Investigation Cleanup Activities Inspection Confirm Current Land Usage Confirm Cleanup Completed Confirm Integrity of Engineering Controls X Confirm SMP is Being Complied With Post-Closure Permit Verification Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: Fairchild semi-conductor is now occupied by Aligned Data Center. SAMPLE COLLECTION Were Environmental Samples Collected by the Consultant (& were any split samples taken by staff)? YES NO X COMMENTS: Is the Work Being Performed in a Manner Consistent with the Approved Workplan? YES NO COMMENTS: CURRENT LAND USAGE Residential X Commercial Industrial Mixed Commercial w/ Residential Under Construction &/or Development OTHER (Describe): FUTURE LAND USAGE Residential Mixed Commercial w/ Residential X Commercial Other: (describe below) Industrial POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES X NO COMMENTS: LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP &/or EC Currently Being Complied with? YES X NO COMMENTS: SITE VISIT CONCLUSIONS Site appears to be in compliance with SMP and EC. RECOMMENDATIONS ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES X NO SIGNATURE: Brad Lauchnor