HomeMy WebLinkAboutDDW-2024-011097Utah Department Of Environmental Quality Division Of Drinking Water Sanitary Survey Sanitary Survey General System Information Exception Granted: R309-550-7 | The Well 7 Transmission Line will be 8-inch ductile iron. This transmission line will cross Sand Hollow road just south of 3150 South in Hurricane, UT. (approximately Station13+60 of the Well 7 Transmission Line). Because the depth of the 8-inch PVC sewer line installed along the Sand Hollow Road is only at about four feet deep, the water line will need to cross under the sewer line to obtain adequate depth. Exception Granted: R309-550-7 | The basis for your request for an exception to R309-550-7 is that the Ash Creek SSD (ACSSD) is relocating a sewer trunk line across SR-9 (just west of the Sand Hollow Road intersection) that conflicts with a Washington County Water Conservancy District (WCWCD) 18-inch water trunk line. The current size of the sewer trunk line is 24 inches, and with this project the ACSSD plans to upsize the trunk line to 36 inches and shift horizontally to the east approximately 10 feet. The conflict is created in the upsize of the pipe to 36 inches, which would clip the bottom of the 18-inch water line. You have explored looping the water line over the top of the new sewer line. However, the water line is currently installed with minimum cover and looping over the sewer line would require mounding material over the pipe. Also, UDOT has plans of widening SR-9 and this utility crossing occurs very near to a future intersection. There would be a high probability of problems with a shallow 18-inch water line. Site Visit Date Surveyor Name 08/21/2024 Brent Arns WASHINGTON COUNTY WCD - SAND HOLLOW PWS ID: UTAH27073 Rating: Approved 06/05/1998 Active 1 Admin Contact (AC) [ eMail address is REQUIRED ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: ZACHARY *Last Name: RENSTROM *Organization: *Address: Redacted *City: ST GEORGE *State: UT *Zip: 84770 *Email: zach@wcwcd.org *Phone: 435-673-3617 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 1 of 117 2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: WASHINGTON COUNTY WCD *Address: 533 WATERWORKS DR *City: ST GEORGE *State: UT *Zip: 84770 *Email: brie@wcwcd.org *Phone: 435-673-3617 Emergency Phone: 435-669-7575 3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: *Last Name: *Organization: WASHINGTON COUNTY WCD *Address: 533 WATERWORKS DR *City: ST GEORGE *State: UT *Zip: 84770 *Email: brie@wcwcd.org *Phone: 435-673-3617 Emergency Phone: 435-669-7575 4 Direct Operator in Charge (DO) [ if no eMail address is available, enter NoeMail@utah.gov ] MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be designated as the owner of the system and name, address and phone number of such be supplied to the Division. *First Name: RYAN DAVID *Last Name: NAY *Organization: *Address: 2690 S 1100 W *City: HURRICANE *State: UT *Zip: 84737 *Email: ryann@wcwcd.org *Phone: 435-673-3617 5 Does the system serve a Residential population?Y 5A Population - Residential 300 5B Operating Period (Start Date) - Residential 01/01 5C Operating Period (End Date) - Residential 12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 2 of 117 Site Visit Info Management and Operations 6 Does the system serve a Transient population? (A transient population is a rotating population that is served by a water system that does not remain in the jurisdiction of the water system for long periods of time. Examples of a transient population include, but are not limited to, campers at a campground, users of a highway rest stop, skiers at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.) Y 6A Population - Transient 125 6B Operating Period (Start Date) - Transient 01/01 6C Operating Period (End Date) - Transient 12/31 7 Does the system serve a Non-Transient population? (A non-transient population is a population served by a water system that is the same population being served by the system for at least six months of the year, but is not a resident in the system. Examples of a non-transient population include, but are not limited to, employees of a restaurant, shop, or ski resort; teachers and students at a school, day-care center, or church; doctors, nurses, and other employees at a hospital or healthcare clinic.) N 8 Population - Wholesale :170000 9 Residential Connections:175 10 Commercial Connections:10 11 Industrial Connections:3 12 Agricultural Connections:0 13 Date of Survey (First Day of Field Work)08/21/2024 14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the header ** 08/21/2024 15 Date final report sent to system (questionnaire, deficiency report and capacity spreadsheet) 09/13/2024 16 Water system representative present during the survey:Yes 17 How much time was spent to prepare survey documents prior to field survey? (Round up to nearest quarter hour) 4 18 How much time was spent to complete the field survey (arrival to completion; include travel time between water system facilities)? (Round up to nearest quarter hour) 10 19 How much time was spent traveling from the office to system and back again at the end of the field survey? (Round up to nearest quarter hour) 6 20 How much time did it take to finish the Survey Report? (Round up to nearest quarter hour) 4 21 Did you survey multiple water systems in one trip? ... if yes, answer the following question(s) Y 21A If yes, how many?3 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 3 of 117 22 For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power option. SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system without naturally flowing water sources, such as springs or flowing wells, to have one or more of the system's sources equipped for operation during power outages. To ensure continuous service when the primary power has been interrupted, a redundant power supply is required. A redundant power supply may include a transfer switch for auxiliary power such as a generator or a power supply service with coverage from two independent substations. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 23 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through or in process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a different question] SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 24 Are there any individual home booster pumps installed in the distribution system (not for fire suppression)? SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3) C 25 Does the system haul water?N 26 For a community system serving 100 or more connections, at least 2 water sources are available. SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems serving more than 100 connections to have a minimum of two sources except where served by a water treatment plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 27 Does system have a consecutive connection to another water system not listed in the SOURCE section of Waterlink Report? If yes, answer the following question(s) N 28 Does the system have a deficiency meeting the required source capacity? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 29 Does the system have a deficiency meeting the required storage capacity DUE SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 30 Does the system have a deficiency meeting the required equalization storage capacity for indoor/outdoor demands (but not because of fire suppression needs)? (USE SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO." N 31 Does your water system have an Emergency Response Plan? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 4 of 117 Cross Connection and Operator Certification 31A Does your Emergency Response Plan include cybersecurity? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. Y 31B Does your water system use any computers, laptops, phones, tablets, or any other computer systems to manage, operate, or maintain the PWS (SCADA or Industrial Control Systems)? This includes any water sources, treatment, distribution or any process related to operation function Y 31C Does your water system use any computer systems in regular business operations such as accounting, billing, payroll, human resources, or management? Y 32 Legally adopted authority statement MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes a legally adopted and functional local authority to enforce the program (i.e., ordinance, bylaw, or policy). C 33 Documentation of annual public awareness and/or employee training MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. C 34 Documentation of personnel trained to manage the program (COMMUNITY WATER SYSTEMS POPULATION 500 AND ABOVE REQUIRE A DDW CERTIFIED CCC PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING) MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes an operator with adequate training in the area of cross connection control or backflow prevention. C 35 Does the water system have detailed records of cross connection control activities? (inventories of backflow assemblies, devices, and air gaps installed within the system) MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes written records of cross connection control activities. C 36 Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. C 37 Operator meets required level of certification for water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every community and NTNC water system and public water systems that utilize treatment/filtration to have at least one operator certified at the classified grade of the water system. Certification must be appropriate for the type of system operated (treatment and/or distribution). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 38 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED OPERATOR IS REQUIRED MARK COMPLIANT ) MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1 hour travel time, under normal work and home conditions, of each drinking water system for which he is considered in direct responsible charge. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 5 of 117 General Maintenance and Environment Distribution 39 Are there any visual indications of unsanitary conditions? SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The Secondary Maximum Contaminant Levels for public water systems deals with substances which affect the aesthetic quality of drinking water. They are presented here as recommended limits or ranges and are not grounds for rejection. The taste of water may be unpleasant and the usefulness of the water may be impaired if these standards are significantly exceeded. R309-105-18 The Director or the local health department shall be informed by telephone by a water supplier of any "emergency situation". The term "emergency situation... R309-215-4(3) If the water fails to meet minimum standards, then certain public notification procedures shall be carried out, as outlined in R309-220. Water suppliers shall also keep analytical records in their possession, for a required length of time, as outlined in R309-105-17. C 40 No unprotected connection between the distribution system and a source of contamination. (If there is an unprotected connection, describe the location in detail.) SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11) C 41 Are air release/vacuum valves in the distribution system? ... if yes, answer the following question(s) Y 41A Open end of vent line covered with #14 mesh screen SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 41B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or one foot above distribution line in a chamber that does not flood. SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 41C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or sump pump. SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be provided with a drain to daylight, if possible. Where this is not possible, underground gravel-filled absorption pits may be used if the site is not subject to flooding and conditions will assure adequate drainage. Sump pumps may also be considered if a drain to daylight or absorption pit is not feasible. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 6 of 117 General Disinfection 41D Open end of vent line down-turned. SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible screen and a downward elbow, and where possible, be extended to at least one foot above grade. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 42 Water system has a program to maintain, operate, or control the use of fire hydrants. REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the distribution system. In order to protect the quality and integrity of the water, fire hydrant access should be controlled. C 43 Blow offs or air release valves are not directly connected to a sanitary sewer line. SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states blow-offs or air relief valves shall not be connected directly to a sewer. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 44 Blow offs or air release valves do not discharge below flood level in ditches or streams. SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3) C 45 All water mains installed after 1995 that provide fire flow are at least 8 inches in diameter. MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis indicates that required flow and pressures can be maintained by 6-inch lines. C 46 Distribution system capable of providing minimum pressure of 20 psi at all service connections. SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution system shall maintain minimum pressures as required by R309-105-9 at all points of connection under all flow conditions. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 47 Was the water system constructed or new portions added after January 1, 2007? ... if yes, answer the following question(s) Y 47A Distribution system capable of maintaining the following pressures at all service connections: (a) 20 psi during fire flow and fire demand during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. SIG | 50pts | DS | D010 | R309-105-9, R309-550-5(1) | Rule states that unless otherwise specifically approved by the Director, public water systems constructed after January 1, 2007, shall be designed and shall meet the following minimum water pressures at points of connection: (a) 20 psi during conditions of fire flow and fire demand experienced during peak day demand; (b) 30 psi during peak instantaneous demand; and (c) 40 psi during peak day demand. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 7 of 117 WS020 - SAND HOLLOW WELL 7 - Proposed Source WS024 - SAND HOLLOW WELL 15 - Proposed Source OT001 - SAND SEPARATOR TANK (PRE 1 MG) - Inactive (RL - REPLACED) WS001 - SAND HOLLOW WELL 4 ABND - Inactive (AB - ABANDONED) 48 Water system follows AWWA disinfection procedures for new, repaired, or seasonal water mains and tanks. SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and appurtenances shall be disinfected in accordance with AWWA Standard C651. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 49 How often do you periodically disinfect any or all parts of your water system (i.e. batch disinfection) other than for repairs or maintenance? SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of Engineering Plans and Specifications R309-500-6 Plan Approval Procedure. C 53 Is this source in operation without an Operating Permit? SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 53A When is the anticipated date to request an Operating Permit? Explain in comments...2025 54 Is this source in operation without an Operating Permit? SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 54A When is the anticipated date to request an Operating Permit? Explain in comments...2025 50 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. Y 50A Is the facility incapable of allowing water or contamination to enter the drinking water system? Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 100pts | SM | A100 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 50B Is the facility physically disconnected from supplying water to the distribution system? Guidance: Is the equipment, pipe, etc, physically removed, disconnected. Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 50pts | SM | A075 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 8 of 117 WS002 - SAND HOLLOW WELL 3 - Inactive (AB - ABANDONED) PF003 - PURGATORY BOOSTER PUMP STATION - Proposed TP020 - ARSENIC BLEND FOR SHRP AND SH WELLS - Proposed 51 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. Y 51A Is the facility incapable of allowing water or contamination to enter the drinking water system? Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 100pts | SM | A100 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 51B Is the facility physically disconnected from supplying water to the distribution system? Guidance: Is the equipment, pipe, etc, physically removed, disconnected. Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 50pts | SM | A075 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 52 Does the water system still have physical access to this facility? Y/N Guidance: Answer NO if sold and no longer have security access or the facility is demolished and can not be inspected. Y 52A Is the facility incapable of allowing water or contamination to enter the drinking water system? Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 100pts | SM | A100 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 52B Is the facility physically disconnected from supplying water to the distribution system? Guidance: Is the equipment, pipe, etc, physically removed, disconnected. Yes(compliant) No(complete full question set for facility type and notify DDW) SIG | 50pts | SM | A075 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. Y 55 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 55A When is the anticipated date to request an Operating Permit? Explain in comments...2025 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 9 of 117 TP021 - ARSENIC BLEND POINT AT ST004 - Proposed TP022 - ARSENIC BLEND AT HURRICANE VALLEY WS - Proposed TP023 - GROUP WELLS SAMPLING STATION SS140 - Proposed WS014 - SAND HOLLOW ARTIFICAL SPRING - 56 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 56A When is the anticipated date to request an Operating Permit? Explain in comments...2025 57 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 57A When is the anticipated date to request an Operating Permit? Explain in comments...2025 58 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 58A When is the anticipated date to request an Operating Permit? Explain in comments...2025 59 Is this facility in operation without an Operating Permit? SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. N 59A When is the anticipated date to request an Operating Permit? Explain in comments...2025 60 Is this facility Active or Inactive? (Active status means used on a routine/seasonal basis without long periods of inactivity and water quality samples are routinely collected)) A 61 Operating Period (Start Date)01/01 62 Operating Period (End Date)12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 10 of 117 63 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 64 Area of equal or higher elevation within 50 feet of spring collection devices is fenced. MIN | 15pts | SO | SS02 | R309-515-7(7)(e) | Rule requires a stock-tight fence around the spring collection area. C 65 Surface water runoff diverted away from spring by diversion channel or berm. MIN | 15pts | SO | SS03 | R309-515-7(7)(g) | Rule requires a diversion channel or berm, constructed immediately inside the fenced area, capable of diverting all anticipated surface water runoff away from the spring collection area. C 66 Spring box has a means to release overflow? MIN | 15pts | SO | SS23 | R309-515-7(7)(d), R309-545-13(1) | All junction boxes and collection boxes, must comply with R309-545 with respect to access openings, venting, and tank overflow. Lids for these spring boxes shall be gasketed and the box adequately vented. Y 66A Overflow screened with #4 mesh screen SIG | 25pts | SO | SS04 | R309-515-7(7)(d), R309-545-13(3) | Overflow pipes on junction and collection boxes shall comply with R309-545 and be screened with No. 4 mesh non-corrodible screens. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 66B Overflow has a minimum of 12 inch clearance above flood rim of receiving basin SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction and collection boxes shall comply with R309-545 and discharge a minimum of 12 inches above the ground surface or rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 67 Drain has minimum of 12 inch clearance above flood rim of receiving basin SIG | 25pts | SO | SS14 | R309-515-7(7)(d), R309-545 | Overflow pipes on junction and collection boxes shall comply with R309-545 and discharge a minimum of 12 inches above the ground surface or rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 68 Spring collection area graded and no evidence of water ponding or flow on surface? SIG | 25pts | SO | SS06 | R309-515-7(7)(i) | Rule requires the spring to be developed as thoroughly as possible to minimize the possibility of excess water ponding within the collection area. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 11 of 117 69 If a liner is present, spring liner integrity is maintained. SIG | 50pts | SO | SS19 | R309-515-7(7)(b)(iv) | If a liner is present, it shall be installed to assure its integrity. No sharp-edged stones or stones two inches or larger shall be located within two inches of the liner. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 70 No deep-rooted vegetation is within the 50 ft collection area. SIG | 25pts | SO | SS07 | R309-515-7(7)(f) | All deep-rooted vegetation within the fenced collection area shall be removed by a means not negatively affecting water quality. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 71 No roots seen in collection boxes and junctions. SIG | 25pts | SO | SS08 | R309-105-10(4)(a), R309-515-8(1)(a) | Spring collection areas shall be periodically (preferably annually) cleared of deep-rooted vegetation to prevent root growth from clogging collection lines. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72 Is a spring collection box present? ... if yes, answer the following question(s) MIN | 5pts | SO | L014 | R309-515-7(7)(c) | Rule requires each spring collection area to be provided with at least one collection box to permit spring inspection and testing. Y 72A Spring box has shoe box type lid with 2 inch overlap around frame SIG | 25pts | SO | SS09 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall comply with R309-545 and be provided with a close-fitting, solid shoebox-type cover that extends down around the frame at least 2 inches. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72B Spring box lid is gasketed SIG | 25pts | SO | SS10 | R309-515-7(7)(d), R309-545-14 (2) | Access openings shall comply with R309-545 and be provided with a cover furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72C Spring box lid does not show evidence of a vacuum. MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. C 72D Spring box opening is at least 4 inches above the surface of the box or 18 inches above an earthen cover if the box is buried. MIN | 15pts | SO | SS12 | R309-515-7(7)(d), R309-545-14 (1), | Access openings shall comply with R309-545 and be framed at least 4 inches above the surface of the spring box roof at the opening or 18 inches above the ground surface on a buried spring box. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 12 of 117 72E Spring box lid is locked SIG | 25pts | SO | SS13 | R309-515-7(7)(d), R309-545-14 (3) | Access openings shall comply with R309-545 and the lids to the openings shall be locked. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 72F All openings/penetrations in the spring collection box are sealed. SIG | 50pts | SO | SS20 | R309-515-7(7)(d), R309-545-9(1) and (2) | All junction and collection boxes shall comply with R309-545 and shall have suitable watertight roofs and sidewalls that exclude birds, animals, insects, and excessive dust. All openings shall be kept to a minimum and be watertight. Pipes that may contain water of lesser quality than drinking water shall not penetrate the spring box. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 73 Is a spring box vent present? ... if yes, answer the following question(s) MIN | 5pts | SO | SS11 | R309-515-7(7)(d), R309-545-15 | Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Y 73A Vent is down-turned. SIG | 25pts | SO | SS16 | R309-515-7(7)(d), R309-545-15(1) | All vents on junction and collection boxes shall comply with R309-545 and be downturned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 73B Vent has #14 or finer non-corrodible mesh screen and a protective screen/covering if 6-inch diameter or greater. SIG | 25pts | SO | SS17 | R309-515-7(7)(d), R309-545-15(4) and (5) | All vents on junction and collection boxes shall comply with R309-545 and be fitted with No. 14 or finer non-corrodible mesh screen. Vents 6-inch diameter or larger shall be fitted with additional heavy gage screen or substantial covering to protect the No. 14 mesh screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 73C End of vent has sufficient clearance to prevent ice/snow blockage or is at least 24 inches above the earthen cover SIG | 25pts | SO | SS18 | R309-515-7(7)(d), R309-545-15(2) and (3) | All vents on junction and collection boxes shall comply with R309-545 and shall be located and sized to avoid blockage during winter. The end of a vent on a buried spring box shall discharge a minimum of 24 inches above the ground. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 13 of 117 WS003 - SAND HOLLOW WELL 9 - Active 74 Spring has a permanent flow-measuring device. MIN | 5pts | SO | SS01 | R309-515-7(7)(h) | Rule requires a spring to have a permanent flow measuring device. C 75 Is this facility Active or Inactive?A 76 Operating Period (Start Date)01/01 77 Operating Period (Ending Date)12/31 78 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 79 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 80 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 81 Is the well casing vented? ... if yes, answer the following question(s)Y 81A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 81B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 81C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 14 of 117 82 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 82A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 82B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 82C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 83 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 84 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 85 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 86 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 87 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 15 of 117 88 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 89 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 90 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 91 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 92 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 93 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 93A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 93B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 93C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 16 of 117 WS004 - SAND HOLLOW WELL 17 - Active 94 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 95 Does well require oil-lubrication?Y 95A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 96 Is this facility Active or Inactive?A 97 Operating Period (Start Date)01/01 98 Operating Period (Ending Date)12/31 99 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 100 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 101 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 102 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 17 of 117 102A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 102B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 102C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 103 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 103A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 103B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 103C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 104 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 105 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 18 of 117 106 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 107 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 108 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 109 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 110 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 111 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 112 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 113 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 114 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 19 of 117 WS005 - SAND HOLLOW WELL 2 - 114A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 114B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 114C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 115 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 116 Does well require oil-lubrication?N 117 Is this facility Active or Inactive?I 117A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not in Use 118 Operating Period (Start Date)01/01 119 Operating Period (Ending Date)12/31 120 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 20 of 117 121 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 122 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 123 Is the well casing vented? ... if yes, answer the following question(s)Y 123A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 123B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 123C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 124 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 124A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 124B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 21 of 117 124C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 125 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 126 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 127 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 128 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 129 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 130 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 131 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 22 of 117 WS006 - SAND HOLLOW WELL 8 - Active 132 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 133 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 134 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 135 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 135A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 135B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 135C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 136 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 137 Does well require oil-lubrication?N 138 Is this facility Active or Inactive?A 139 Operating Period (Start Date)01/01 140 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 23 of 117 141 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 142 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 143 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 144 Is the well casing vented? ... if yes, answer the following question(s)Y 144A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 144B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 144C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 145 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 145A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 24 of 117 145B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 145C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 146 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 147 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 148 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 149 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 150 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 151 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 25 of 117 WS007 - SAND HOLLOW WELL 1 - Active 152 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 153 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 154 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 155 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 156 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 156A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 156B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 156C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 157 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 158 Does well require oil-lubrication?N DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 26 of 117 159 Is this facility Active or Inactive?A 160 Operating Period (Start Date)01/01 161 Operating Period (Ending Date)12/31 162 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 163 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 164 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 165 Is the well casing vented? ... if yes, answer the following question(s)Y 165A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 165B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 165C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 166 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 27 of 117 166A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 166B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 166C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 167 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 168 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 169 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 170 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 171 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 28 of 117 172 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 173 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 174 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 175 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 176 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 177 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 177A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 177B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 177C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 29 of 117 WS008 - SAND HOLLOW #18 - Active 178 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 179 Does well require oil-lubrication?Y 179A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 180 Is this facility Active or Inactive?A 181 Operating Period (Start Date)01/01 182 Operating Period (Ending Date)12/31 183 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 184 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 185 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 186 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 30 of 117 186A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 186B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 186C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 187 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 187A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 187B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 187C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 188 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 189 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 31 of 117 190 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 191 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 192 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 193 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 194 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 195 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 196 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 197 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 198 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 32 of 117 WS009 - SAND HOLLOW #19 - Active 198A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 198B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 198C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 199 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 200 Does well require oil-lubrication?Y 200A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 201 Is this facility Active or Inactive?A 202 Operating Period (Start Date)01/01 203 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 33 of 117 204 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 205 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 206 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 207 Is the well casing vented? ... if yes, answer the following question(s)Y 207A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 207B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 207C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 208 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 208A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 34 of 117 208B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 208C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 209 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 210 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 211 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 212 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 213 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 214 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 35 of 117 215 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 216 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 217 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 218 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 219 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 219A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 219B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 219C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 220 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 221 Does well require oil-lubrication?Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 36 of 117 WS010 - SAND HOLLOW #21 - 221A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 222 Is this facility Active or Inactive?I 222A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not in Use 223 Operating Period (Start Date)01/01 224 Operating Period (Ending Date)12/31 225 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 226 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 227 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 228 Is the well casing vented? ... if yes, answer the following question(s)Y 228A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 37 of 117 228B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 228C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 229 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 229A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 229B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 229C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 230 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 231 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 232 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 38 of 117 233 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 234 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 235 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 236 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 237 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 238 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 239 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 240 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 240A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 240B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 39 of 117 WS011 - SAND HOLLOW #22 - 240C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 241 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 242 Does well require oil-lubrication?Y 242A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 243 Is this facility Active or Inactive?I 243A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not in Use 244 Operating Period (Start Date)01/01 245 Operating Period (Ending Date)12/31 246 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 247 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 40 of 117 248 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 249 Is the well casing vented? ... if yes, answer the following question(s)Y 249A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 249B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 249C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 250 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 250A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 250B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 250C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 251 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 252 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 41 of 117 253 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 254 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 255 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 256 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 257 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 258 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 259 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 260 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 261 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 42 of 117 WS012 - SAND HOLLOW #23 - Active 261A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 261B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 261C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 262 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 263 Does well require oil-lubrication?Y 263A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 264 Is this facility Active or Inactive?A 265 Operating Period (Start Date)01/01 266 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 43 of 117 267 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 268 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 269 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 270 Is the well casing vented? ... if yes, answer the following question(s)Y 270A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 270B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 270C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 271 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 271A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 44 of 117 271B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 271C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 272 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 273 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 274 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 275 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 276 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 277 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 45 of 117 278 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 279 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 280 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 281 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 282 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 282A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 282B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 282C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 283 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 284 Does well require oil-lubrication?Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 46 of 117 WS013 - SAND HOLLOW #20 - 284A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 285 Is this facility Active or Inactive?I 285A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not in Use 286 Operating Period (Start Date)01/01 287 Operating Period (Ending Date)12/31 288 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 289 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 290 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 291 Is the well casing vented? ... if yes, answer the following question(s)Y 291A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 47 of 117 291B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 291C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 292 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 292A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 292B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 292C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 293 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 294 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 295 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 48 of 117 296 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 297 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 298 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 299 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 300 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 301 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 302 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 303 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 303A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 303B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 49 of 117 WS016 - SAND HOLLOW WELL 5 - Active 303C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 304 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 305 Does well require oil-lubrication?Y 305A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 306 Is this facility Active or Inactive?A 307 Operating Period (Start Date)01/01 308 Operating Period (Ending Date)12/31 309 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 310 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 50 of 117 311 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 312 Is the well casing vented? ... if yes, answer the following question(s)Y 312A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 312B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 312C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 313 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 313A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 313B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 313C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 314 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 315 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 51 of 117 316 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 317 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 318 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 319 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 320 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 321 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 322 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 323 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 324 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 52 of 117 WS017 - SAND HOLLOW WELL 6 - Active 324A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 324B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 324C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 325 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 326 Does well require oil-lubrication?N 327 Is this facility Active or Inactive?A 328 Operating Period (Start Date)01/01 329 Operating Period (Ending Date)12/31 330 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 53 of 117 331 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 332 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 333 Is the well casing vented? ... if yes, answer the following question(s)Y 333A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 333B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 333C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 334 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 334A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 334B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 54 of 117 334C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 335 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 336 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 337 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 338 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 339 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 340 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 341 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 55 of 117 WS018 - SAND HOLLOW WELL 10 - Active 342 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 343 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 344 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 345 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 345A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 345B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 345C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 346 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 347 Does well require oil-lubrication?N 348 Is this facility Active or Inactive?A 349 Operating Period (Start Date)01/01 350 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 56 of 117 351 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 352 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 353 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 354 Is the well casing vented? ... if yes, answer the following question(s)Y 354A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 354B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 354C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 355 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 355A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 57 of 117 355B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 355C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 356 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 357 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 358 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 359 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 360 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 361 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 58 of 117 362 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 363 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 364 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 365 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 366 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 366A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 366B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 366C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 367 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 368 Does well require oil-lubrication?Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 59 of 117 WS019 - SAND HOLLOW WELL 4 REPL1 - Active 368A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 369 Is this facility Active or Inactive?A 370 Operating Period (Start Date)01/01 371 Operating Period (Ending Date)12/31 372 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 373 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 374 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 375 Is the well casing vented? ... if yes, answer the following question(s)Y 375A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 375B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 60 of 117 375C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 376 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 376A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 376B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 376C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 377 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 378 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 379 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 380 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 61 of 117 381 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 382 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 383 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 384 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 385 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 386 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 387 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) N 388 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 389 Does well require oil-lubrication?Y 389A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 62 of 117 WS021 - SAND HOLLOW WELL 11 - Active 390 Is this facility Active or Inactive?A 391 Operating Period (Start Date)01/01 392 Operating Period (Ending Date)12/31 393 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 394 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 395 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 396 Is the well casing vented? ... if yes, answer the following question(s)Y 396A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 396B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 396C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 397 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 63 of 117 397A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 397B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 397C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 398 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 399 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 400 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 401 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 402 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 64 of 117 403 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 404 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 405 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 406 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 407 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 408 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 408A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 408B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 408C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 65 of 117 WS022 - SAND HOLLOW WELL 12 - Active 409 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 410 Does well require oil-lubrication?Y 410A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 411 Is this facility Active or Inactive?A 412 Operating Period (Start Date)01/01 413 Operating Period (Ending Date)12/31 414 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 415 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 416 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 417 Is the well casing vented? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 66 of 117 417A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 417B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 417C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 418 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 418A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 418B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 418C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 419 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 420 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 67 of 117 421 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 422 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 423 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 424 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C 425 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 426 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 427 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 428 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 429 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 68 of 117 WS023 - SAND HOLLOW WELL 13 - Active Exception Granted: R309-515-4(6), R309-600-13(3) | Currently, sewer lines, which are not constructed in accordance with these rules, exist within source protection zone two for the Sand Hollow Well 13. 429A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 429B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 429C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 430 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 431 Does well require oil-lubrication?Y 431A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 432 Is this facility Active or Inactive?A 433 Operating Period (Start Date)01/01 434 Operating Period (Ending Date)12/31 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 69 of 117 435 Undocumented sources shall not be physically connected to the drinking water system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT") SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) | R309-105-6(1) requires plans and specifications for all public drinking water projects to be approved in writing by the Director prior to the commencement of construction. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 436 Well casing is at least 18 inches above finished ground surface and 12 inches above well house floor. SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515- 6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above the final ground surface and 12 inches above the pump house floor; at sites subject to flooding, the top of the casing must terminate at least 3 feet above the 100-year flood level or highest known flood elevation, whichever is higher. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 437 Wellhead is sealed to prevent contamination. SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515- 6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and discharge piping. This significant deficiency should be corrected within 120 days of notification or have a corrective action plan approved by C 438 Is the well casing vented? ... if yes, answer the following question(s)Y 438A Vent screened with #14 mesh screen SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen. C 438B Vent down-turned SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of surface water or rainwater. C 438C Vent has adequate clearance to prevent contamination from entering the well SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309- 550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap. C 439 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y 439A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood rim. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 70 of 117 439B Pump to waste line equipped with #4 non-corrodible mesh screen SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 439C Pump to waste line downturned if it discharges to sewer/storm drain or allowing complete drainage if not downturned SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to- waste line shall be downturned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 440 Provisions available to periodically measure water levels MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires provisions be made to permit periodic measurement of water levels in the completed well. C 441 Wellhead secured to protect quality water SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 442 Well head or well house and equipment protected from flooding SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515- 6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or 12” above well house floor and for sites that flood at least 3’ above 100-year flood level or highest known flood elevation. Well casing terminating in underground vault shall have a drain to daylight and surface runoff directed away from vault access. Well house floor shall be sloped for drainage, and have a drain to daylight unless highly impractical. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 443 There are no unprotected cross-connections in well discharge piping. SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the well discharge piping to be protected against the entrance of contamination. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 444 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well house or near well head? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 445 Well discharge line has a smooth-nosed sampling tap, which samples the well water before any chemical injection. (first item from the wellhead). MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the first item from the well head and the shut-off valve as the last item) C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 71 of 117 446 Well discharge line has a check valve. MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 447 Well discharge line has a pressure gauge. MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 448 Well discharge line has a means to measure flow. MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 449 Well discharge line has a shut-off valve (last item from the well head). MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. C 450 Is there an air/vac valve on the well discharge line? If yes, answer the following question(s) Y 450A Air vacuum relief valve on well discharge piping downturned SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be down-turned. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 450B Air vacuum relief valve on well discharge piping screened with #14 mesh screen SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be covered with a #14 mesh corrosion-resistant screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 450C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance above floor SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping on an air release/vacuum relief valve on the well discharge piping to be at least 6 inches above the well house floor. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 451 Wells that pump directly into a distribution system have means to release trapped air from pump discharge piping (for example, pumps directly to a tank, has an air release valve or pump to waste line) MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps directly into the distribution system be equipped with an air release/vacuum relief valve located upstream of the check valve, unless the wellhead valve and piping provide for pumping to waste all trapped air before water is introduced into the distribution system. C 452 Does well require oil-lubrication?Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 72 of 117 NF001 - SAND SEPARATOR TANK (PRE 1 MG) - Active 452A Well shaft lubricants ANSI/NSF 60 certified SIG | 25pts | SO | S031 | R309-105-10(7), R309-515-6(6)(a) | Rules require all oil- lubricated pumps for drinking water wells to utilize food-grade mineral oil suitable for human consumption as determined by the Director. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. <a href="https://www.youtube.com/watch?v=UABQMeeUz1g">Click here for addition training</a> C 453 Is this facility Active or Inactive?A 454 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 0 (Notes: Not Finished water volume calc) 455 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 456 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 457 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 458 Are air vents present? ... if yes, answer the following question(s)N 459 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 459A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 73 of 117 459B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 459C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 460 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 461 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 462 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 463 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 464 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 465 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 465A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 74 of 117 NF002 - BACKWASH CLARIFIER TK - Active 465B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 465C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 466 Are the drain line and overflow combined?N 466A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 467 Is this facility Active or Inactive?A 468 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 0 (Notes: Not Finished water volume calc) 469 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 470 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 471 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 472 Are air vents present? ... if yes, answer the following question(s)N DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 75 of 117 473 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 473A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 473B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 473C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 474 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 475 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 476 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 477 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 478 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 76 of 117 ST001 - SKY RANCH STORAGE - Active 479 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 479A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 479B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 479C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 480 Are the drain line and overflow combined?N 480A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 481 Is this facility Active or Inactive?A 482 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 140000 483 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 77 of 117 484 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 485 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 486 Are air vents present? ... if yes, answer the following question(s)Y 486A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 486B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 486C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 486D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 487 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 487A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 78 of 117 487B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 487C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 488 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 489 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 490 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 491 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 492 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 493 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 493A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 79 of 117 ST002 - CLIFF DWELLERS STORAGE - Active 493B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 493C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 494 Are the drain line and overflow combined?N 494A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 495 Is this facility Active or Inactive?A 496 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 125000 497 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 498 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 499 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 500 Are air vents present? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 80 of 117 500A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 500B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 500C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 500D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 501 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 501A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 501B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 501C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 81 of 117 502 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 503 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 504 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 505 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 506 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 507 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 507A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 507B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 507C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 508 Are the drain line and overflow combined?N DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 82 of 117 ST003 - 1 MILLION GALLON RESERVOIR - Active 508A Drain line shall terminate at least 12 inches above ground or flood rim of receiving basin SIG | 25pts | FW | V016 | R309-545-10(1)(d) | If the local authority allows discharge to a storm drain, the rule requires the drain discharge to have a physical clearance of at least 12 inches between the discharge end of the pipe and the overflow rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 509 Is this facility Active or Inactive?A 510 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 1000000 511 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 512 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 513 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 514 Are air vents present? ... if yes, answer the following question(s)Y 514A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 514B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 83 of 117 514C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 514D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 515 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 515A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 515B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 515C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 516 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 517 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 84 of 117 ST004 - 2 MILLION GALLON RESERVOIR - Active 518 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 519 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 520 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 521 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 521A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 521B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 521C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 522 Are the drain line and overflow combined?Y 523 Is this facility Active or Inactive?A 524 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 2000000 DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 85 of 117 525 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 526 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C 527 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 528 Are air vents present? ... if yes, answer the following question(s)Y 528A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 528B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 528C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 528D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 86 of 117 529 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 529A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 529B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 529C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 530 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 531 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 532 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 533 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 534 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 87 of 117 ST005 - WARNER VALLEY TANK (3 MG) - Active 535 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 535A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 535B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 535C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 536 Are the drain line and overflow combined?Y 537 Is this facility Active or Inactive?A 538 Storage tank capacity in gallons (from SDWIS; if different explain why in the comments) 3000000 539 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 540 Ladders, ladder guards, platform railings, or safely located entrance hatches are provided. MIN | 15pts | FW | V004 | R309-545-18 | Rule requires ladders, ladder guards, platform railings, and safely located entrance hatches where applicable for water storage tanks and requires safety practices to conform to pertinent laws and regulations of the Utah Occupational Safety and Health Division. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 88 of 117 541 Tank is vented. SIG | 25pts | FW | VL02 | R309-545-15 | Rule requires drinking water storage tanks to be vented. Overflows cannot be considered or used as vents. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 542 Are air vents present? ... if yes, answer the following question(s)Y 542A Vent is either down-turned or shielded from contaminants (at least 2 inches below the bottom of the opening) SIG | 25pts | FW | V005 | R309-545-15(1) | Rule requires inverted vents on water storage tanks to be down-turned a minimum of 2 inches below any opening and shielded to prevent the entrance of contaminants. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 542B End of vent terminates at least 24 inches above earthen cover (buried tank) and is located and sized to avoid blockage during winter. MIN | 15pts | FW | V006 | R309-545-15(2) | For buried structures, the rule requires the end of the vent discharge to be a minimum of 24 inches above the earthen covering. C 542C Vent covered with #14 or finer non-corrodible mesh screen. SIG | 25pts | FW | V007 | R309-545-15(4) | Rule requires a water storage tank vent to be fitted with #14 mesh or finer non-corrodible screen and vents 6-inches or greater in diameter to be fitted with additional heavy gauge screen or substantial covering to protect the #14 mesh screen from vandalism or damage. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 542D Vent 6-inch diameter and larger protected with additional heavy-gauge screen or substantial covering. MIN | 5pts | FW | V035 | R309-545-15(5) | Rule requires vents that are 6-inch diameter or greater to be fitted with additional heavy gauge screen or substantial covering, which will protect the No. 14 mesh screen against vandalism or damage. C 543 Are access openings present? ... if yes, answer the following question(s) MIN | 15pts | FW | VL03 | R309-545-14 and 14(1) | Rule requires drinking water storage tanks to be designed with reasonably convenient access to the interior for cleaning and maintenance. Y 543A Access opening framed at least 4 inches above roof surface or 18 inches above earthen cover. MIN | 15pts | FW | V008 | R309-545-14(1) | Rule requires tank access opening to be framed at least 4 inches above the surface of the roof, or on a buried tank, to be at least 18 inches above any earthen cover over the tank. C 543B Access opening shoe box type with at least 2 inches of overlap SIG | 25pts | FW | V010 | R309-545-14(2) | Rule requires the frame of an access opening to be provided with a close fitting solid shoebox type cover which extends down around the frame at least two inches and is furnished with a gasket(s) between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 89 of 117 543C Access opening lid properly gasketed SIG | 25pts | FW | V009 | R309-545-14(2) | Rule requires the access opening to a tank to be furnished with a gasket between the lid and frame. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 544 Access opening locked SIG | 25pts | FW | V029 | R309-545-14(3) | Rule requires the lid to any access opening to have a locking device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 545 Roof or wall penetrations sealed SIG | 100pts | FW | V017 | R309-545-6(1) and 545-9 | Rule requires openings in a storage tank roof or top, designed to accommodate control apparatus or pump columns, to be welded, gasketed, or curbed and sleeved and to have additional proper shielding to prevent vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 546 Area surrounding ground-level or buried storage tank is graded to prevent surface water from standing within 50 feet. SIG | 25pts | TR | V001 | R309-545-7(4) | Rule requires the area surrounding a ground-level or buried water storage tank be graded in a manner to prevent surface water from standing within 50 feet of the tank. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 547 Storage tank roof is sloped to prevent ponding MIN | 15pts | FW | V003 | R309-545-9(4) | Rule requires drainage of storage tank roofs to eliminate water ponding. C 548 Are there cracks in the walls or roof of the storage tank? (if yes, select only one of the following options) N 549 Is a tank overflow present? ... if yes, answer the following question(s) SIG | 25pts | FW | VL01 | R309-545-13 | Rule requires all storage tanks to be provided with an overflow that discharges at an an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 549A Overflow line discharges at least 12 inches above ground or the flood rim of receiving basin? SIG | 25pts | FW | V011 | R309-545-13 | Rule requires all water storage tanks to be provided with an overflow that discharges at an elevation between 12 and 24 inches above the ground surface or the rim of the receiving basin. C 549B Overflow line covered with #4 mesh non-corrodible screen SIG | 25pts | FW | V012 | R309-545-13(3) | Rule requires overflow pipes to be screened with #4 mesh non-corrodible screens installed at a location least susceptible to damage by vandalism. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 90 of 117 HD001 - CLIFF DWELLER HD TANKS (2 TANKS) -- Hydropneumatic Tanks - Active PF001 - CLIFF DWELLER BOOSTER STATION -- Pump Stations - Active 549C Overflow line connected or discharges to a sanitary sewer drain? SIG | 50pts | FW | V013 | R309-545-13(5) | Rule prohibits overflow pipes from connecting to, or discharging into, a sanitary sewer system. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 550 Are the drain line and overflow combined?Y 551 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 552 A tank located below ground allows for adequate drainage, ventilation, maintenance, and flood protection. MIN | 15pts | PU | PT14 | R309-540-6(2) | Rule requires diaphragm or air tanks and appurtenances located below ground to have adequate provisions for drainage, ventilation, maintenance, and flood protection. C 553 Is there a means to measure pressure to verify the tank is pressurizing properly? MIN | 15pts | PU | PT08 | R309-540-6(3) | A pressure gauge shall be installed on the pressure tank inlet line. C 554 Pump station/Hydropneumatic tank and controls not protected against hazard? SIG | 25pts | PU | PT13 | R309-540-5(1)(a)(i) | The pump station site meets the requirements for sanitary protection of water quality, hydraulics of the system, and protection against interruption of service by fire, flood, or any other hazard. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 555 Is this facility Active or Inactive?A 556 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 557 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 91 of 117 558 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 558A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 559 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 560 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 561 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 562 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) Y 562A End of air relief piping downturned SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a downward elbow. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 562B End of air relief piping covered with #14 mesh screen SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air relief vent pipe from automatic valves shall be provided with a #14 mesh, non- corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 562C End of air relief piping terminates at least 6 inches above floor SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air release valve discharge line terminate a minimum of 6 inches above the floor. C 563 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 92 of 117 PF002 - SH ARTIFICIAL SPRING PUMP STATION -- Pump Stations - TP001 - ARSENIC & MANGANESE WTP -- Treatment General - Active 564 Is this facility Active or Inactive?A 565 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 566 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible, Vertical turbine) Centrifugal 567 If the pump station is used to pressurize the distribution system, does it have at least two functioning pumping units? ... if yes, answer the following question(s) SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps, withdrawing water directly from distribution lines without storage and feeding water directly into distribution lines, shall have at least two pumping units. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Y 567A Demand is met by remaining pump(s) when largest pumping unit out of service SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two pumping units (such that with any one pump out of service, the remaining pump or pumps shall be capable of providing the peak day demand of the specific portion of the system serviced). This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 568 Pump station building and equipment are protected from flooding. MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station access shall be 6" above surrounding ground and located at least 3’ above 100-year flood elevation or highest recorded flood elevation; station is accessible at all times unless it can be taken out of service when inaccessible. C 569 There are no unprotected cross-connections in the pump station. SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly or device. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 570 Discharge piping has a pressure gauge. MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure gauge be installed on the pump discharge line. C 571 Does the pumping facility have an air relief valve located on the discharge piping? ... if yes, answer the following question(s) N 572 Pump station properly secured MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to prevent vandalism and entrance by animals or unauthorized persons. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 93 of 117 573 Is this facility Active or Inactive?A 574 There are no undocumented drinking water facilities (i.e. tanks, pump stations, treatment facilities, etc.) or recent modifications that have not gone through DDW review SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2) and (3) | Rule requires complete plans & specification for all public drinking water projects to be approved in writing by the Director. Any facility found that has not started DDW review shall be considered unapproved. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 575 Operating Period (Start Date)01/01 576 Operating Period (Ending Date)12/31 577 What is the objective of the treatment process and how do you know it is working? (e.g., surface water treatment, disinfection, arsenic removal, TDS removal etc.) arsenic removal 578 Walk me through the different process steps of your treatment plant. What is the purpose of each step? Show me how you determine you are meeting your Treatment Requirements. Compliant 579 What Chemicals are used? Why?Ferric Chloride 580 How is the chemical dose adjusted with flow and water quality? Prompts: What flow rate is used for the adjustment (influent, effluent, CFE)? What water quality parameters would make you change dose rate? Flow Rate 581 Does influent flow rate vary?Y 581A If yes, why does influent flow rate vary?Influent Flow Rate Variation 581B If yes, does chemical dose rate adjust to remain compliant at different flow conditions?Yes 582 Process control testing is consistent with the specific treatment process MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 583 There is a means to accurately measure the quantities of chemicals used. SIG | 25pts | TR | TD99 | R309-525-11(7)(d)(iv) | Provisions shall be made for measuring the quantities of chemicals used. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 584 Treatment plant properly secured to protect the quality of the treated water, R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 585 Are liquid chemicals used? ... if yes, answer the following question(s)Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 94 of 117 585A Proper cross-connection control is provided on the service water lines that feed the solution tanks SIG | 50pts | TR | TG53 | R309-525-11(9)(b)(i) | Rule requires cross connection control to be provided to assure that the make-up waterlines discharging to solution tanks shall be properly protected from backflow as required by the Utah Plumbing Code. This significant deficiency must be corrected within 120 days of notification or have a compliance action plan approved by DDW. C 585B There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C 585C If there is a day tank, the bulk tank and day tanks have separate screened vents. MIN | 15pts | TR | TG60 | R309-525-11(8)(b)(vi) | Rule requires acid storage tanks to be vented to the outside atmosphere, but not through vents in common with day tanks. C 585D Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals or liquids MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 585E No direct connections exist between a sewer and drain or overflow from the feeder, solution chamber, or tank. SIG | 50pts | DS | M020 | R309-105-12(1) | Rule states that a water supplier shall not allow a connection to his system which may jeopardize its quality and integrity. Cross connections are not allowed unless controlled by an approved and properly operating backflow prevention assembly. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 585F Chemical storage tank access opening properly covered? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 586 Treatment chemicals meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 587 Are all chemical feeders properly verified for accuracy? SIG | 25pts | TR | TG21 | R309-525-11(7)(a)(i) | Feeders shall supply, at all times, the necessary amounts of chemicals at an accurately controlled rate, throughout the anticipated range of feed. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 95 of 117 TP001 - ARSENIC & MANGANESE WTP -- Treatment - Chlorination General - Active 588 Spare parts are available for all chemical feeders MIN | 15pts | TR | TX09 | R309-525-11(7)(b)(i) and (ii) | R308-525-11(8)(b)(i) states that a means consistent with the nature of the chemical solution shall be provided in a solution tank to maintain a uniform strength of solution. Continuous agitation shall be provided to maintain slurries in suspension. 2 dem C 589 Incompatible chemicals stored separately SIG | 25pts | TR | TG19 | R309-525-11(7)(a)(iv) | Rule prohibits chemicals that are incompatible from being fed, stored, or handled together. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 590 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 591 Raw water compliance samples are collected before any treatment. R309-215-4(4) SIG | 25pts | TR | T006 | R309-525-15(10)(a)(i) | R309-525-15(10)(a)(i) Y 591A If yes, was location shown?Yes 592 Where are finished water quality monitoring samples collected?End of train 593 Does water system have a DEQ/DWQ (UPDES permit) discharge permit for the proper disposal of treatment plant waste to land or water? MIN | 15pts | SM | TGR3 | R309-105-6 | R309-105-6 C 594 Which parameters are watched when running treatment plant?Pressure 595 What type of alarm system is used?Scada 596 Does treatment plant have a SCADA system?Y 596A Can operators respond to all alarms in a normal day, or do they have to silence legitimate alarms? Yes 596B How are alarm set points adjusted and how are changes recorded?Hand 597 Proper lab equipment on site to support required operations & maintenance of the plant? SIG | 25pts | TR | T019 | R309-525-17(1) | Sufficient laboratory equipment shall be provided to assure proper operation and monitoring of the water plant. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 598 Is this facility Active or Inactive?A 599 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 96 of 117 600 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 601 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 602 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 603 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 604 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 605 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 606 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 607 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 607A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 608 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 97 of 117 TP002 - SAND HOLLOW WELL 8 CHLORINATOR -- Treatment - Chlorination General - Active 609 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 610 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 610A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 610B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 610C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 610D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 610E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 611 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 612 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 613 Is this facility Active or Inactive?A 614 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 615 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 98 of 117 616 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 617 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 618 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 619 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 620 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 621 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 622 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 622A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 623 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 624 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 625 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 99 of 117 TP004 - SAND HOLLOW WELL 2 CHLORINATOR -- Treatment - Chlorination General - Active 625A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 625B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 625C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 625D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 625E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 626 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 627 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 628 Is this facility Active or Inactive?I 628A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not used at this time 629 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 630 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 100 of 117 631 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 632 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 633 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 634 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 635 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 636 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 637 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 637A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 638 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 639 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 640 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 101 of 117 TP010 - WELL 21 CHLORINATOR -- Treatment - Chlorination General - Active 640A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 640B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 640C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 640D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 640E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 641 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 642 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 643 Is this facility Active or Inactive?A 644 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 645 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 646 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 102 of 117 647 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 648 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 649 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 650 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 651 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 652 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 652A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 653 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 654 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 655 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 655A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 655B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 655C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 103 of 117 TP014 - ARTIFICIAL SPRING CL2 -- Treatment - Chlorination General - 655D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 655E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 656 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 657 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 658 Is this facility Active or Inactive?I 658A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not used 659 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 660 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 661 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 662 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 104 of 117 663 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 664 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 665 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 666 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 667 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 667A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 668 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 669 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 670 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 670A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 670B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 670C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 670D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 105 of 117 TP019 - SAND HOLLOW WELL 4 REPL1 HYPOCHLORINATOR -- Treatment - Chlorination General - Active 670E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 671 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 672 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 673 Is this facility Active or Inactive?A 674 Is system required to provide primary disinfection? Prompt - If system knows they are required to chlorinate based on water quality issues and/or knows they are required to provide a minimum CT then follow-up by DDW is needed. N 675 When chlorination is required, disinfection has operated uninterrupted during the past year while supplying drinking water. SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of groundwater sources that do not consistently meet bacteriological quality standards, all surface water sources, and groundwater sources under the direct influence of surface water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 676 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60. SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to drinking water, including chlorine, chloramines and chemicals used to generate hypochlorite solutions and chlorine dioxide, shall be certified as complying with ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 677 If chemical dilution or dissolution is needed, cross-connection control is provided on water lines feeding solution tanks. SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross connection control shall be provided on make-up water lines feeding solution tanks. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 678 Water flow rate is measured to control chemical feed? SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) | Chemical feed rates shall be proportional to flows and a means to measure water flow rate shall be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 106 of 117 679 Solution tanks and tank refilling line entry points are properly labeled to identify the chemicals MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly labeled to designate the chemical contained. C 680 Free chlorine residual test equipment on-site or available? MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test equipment available capable of measuring residuals to the nearest 0.1 mg/l in the range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the nearest 0.5 mg/l above 1.0 mg/l. C 681 Spare parts are available to replace parts subject to wear and breakage MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September 2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all chlorinators to repair parts subject to wear and breakage. C 682 Is chlorine chemical dose rate adjusted due to different water demand flow rates and/or changing water quality? Y 682A If yes, which water flow rate is used? e.g. influent flow, effluent flow, filter flow.Influent Flow 683 Is there a designated chlorine Point of Entry (POE) sample location? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 684 POE is before first connection/customer? SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 685 Chlorine residual records are maintained and available... if yes answer following SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) Y 685A System is sampling distribution residuals throughout entire distribution system MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 685B Distribution chlorine residuals meet minimum concentration requirement SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d) C 685C "What is the maximum free chlorine residual measure? This value never exceeds 4.0 mg/L? " MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 685D System collects at least three distribution chlorine residual samples a week? MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 685E System is sampling distribution residuals in accordance with monitoring schedule MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 107 of 117 TP002 - SAND HOLLOW WELL 8 CHLORINATOR -- Gaseous Chlorination - Active 686 Treatment plant properly secured to protect the quality of the treated water. R309-520- 7(2)(f) SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the directive, the Director may assess 25 to 200 points to the water system. Points shall be assessed based upon the severity of the non-compliance, the threat to public health and the underlying basis for the original directive. C 687 Daily operating records reflect chemical dosages and total quantities used SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using chemical addition or specialized equipment for the treatment of drinking water to regularly complete operational reports. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 688 Is this facility Active or Inactive?A 689 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 690 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 691 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 692 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 693 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 694 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 108 of 117 TP010 - WELL 21 CHLORINATOR -- Gaseous Chlorination - Active 695 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 696 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 697 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 698 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 699 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 699A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 699B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 699C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 700 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 701 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 702 Is this facility Active or Inactive?A DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 109 of 117 703 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 704 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 705 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C 706 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 707 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 708 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 709 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 710 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 711 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 110 of 117 TP014 - ARTIFICIAL SPRING CL2 -- Gaseous Chlorination - 712 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 713 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 713A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 713B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C 713C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 714 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 715 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 716 Is this facility Active or Inactive?I 716A Explain why this facility is Inactive (Is this facility in stand-by mode?)Not used 717 If disinfection is required, standby chlorination equipment of sufficient capacity is available to replace the largest unit. SIG | 25pts | TR | TD22 | R309-520-7(1)(k)(ii) | Where chlorination is required for disinfection of the water supply, the rule requires standby equipment of sufficient capacity to be available to replace the largest unit in the event of its failure. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 718 Is the chlorinator room heated and has the ability to be protected from excessive heat? MIN | 15pts | TR | TD08 | R309-520-7(1)(l) | Rule requires chlorinator buildings to be heated, lighted, and ventilated as necessary to assure proper operation of the equipment and safety of the operators. C 719 If continuous disinfection is needed, automatic switch over of chlorine cylinders is provided. MIN | 15pts | TR | TD01 | R309-520-7(2)(a), R309-520-6(1) | Rule requires automatic switch over of chlorine cylinders be provided if continuous disinfection is required. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 111 of 117 720 Exhaust fan takes suction near the floor as far as practical from the door and air inlet, and discharges outside away from air inlets. MIN | 15pts | TR | TD09 | R309-520-7(2)(d)(iii) | Rule requires a chlorine room exhaust fan to take suction inside the chlorine room near the floor, as far as practical from the door and air inlet, and discharge air outside of the building away from air inlets. C 721 Air inlets are located near the ceiling and fitted with louvers. MIN | 15pts | TR | TD10 | R309-520-7(2)(d)(iv) | Rule requires chlorine room air inlets to be through wall louvers near the ceiling. C 722 Chlorine vent line discharges outside and above grade and is screened with #14 mesh screen. SIG | 25pts | TR | TD13 | R309-520-7(2)(e) | Rule requires the chlorine vent line to discharge outside, above grade, at a point least susceptible to vandalism, and to have the end covered with a #14 mesh non-corrodible screen. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 723 Separate switches for chlorine room fans and lights are located near the entrance to the room (or are located outside the chlorine room if housed in a water treatment plant). MIN | 15pts | TR | TD12 | R309-520-7(2)(d)(v) | Rule requires separate switches for the chlorine room fans and lights to be located near the entrance to the room and to be protected from vandalism. The switches are required to be located outside the chlorine room if housed in a water treatment plant. C 724 Chlorine cylinder is restrained in position to prevent upset. SIG | 25pts | TR | TD15 | R309-520-7(2)(h) | Rule requires chlorine cylinders to be restrained in position to prevent upset. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 725 Chlorine cylinder is not stored in direct sunlight or exposed to excessive heat. SIG | 25pts | TR | TD17 | R309-520-7(2)(f)(ii) | Rule prohibits chlorine cylinders from being stored in direct sunlight or exposed to excessive heat. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 726 Weight scale is provided for weighing chlorine gas cylinders/containers. SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 727 Is the chlorine cylinder 150 pounds in capacity? ... if yes, answer the following question(s) Y 727A Leak response/repair plan available MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 727B Bottle of ammonium hydroxide (56 % ammonia solution) is available for chlorine leak detection MIN | 15pts | TR | TD14 | R309-520-7(2)(l)(i) | Rule requires a bottle of ammonium hydroxide (56% ammonia solution) to be available for leak detection. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 112 of 117 TP001 - ARSENIC & MANGANESE WTP -- On-Site Generation - Active 727C Immediate access to NIOSH respirator available SIG | 25pts | TR | TD04 | R309-520-7(2)(k)(ii) | Where 150 pound chlorine cylinders are used, a respirator recommended the National Institute of Occupational Safety and Health must be available. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 728 Is the chlorine cylinder 1 ton in capacity? ... if yes, answer the following question(s)N 729 Is the (daily) scale weight or volume data recorded? Explain where in the comments... SIG | 25pts | TR | TD02 | R309-520-7(2)(i) | Rule requires scales to be provided for determining chlorine cylinder weight. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 730 Is this facility Active or Inactive?A 731 On-site hypochlorite generation system is certified to meet ANSI/NSF 61 SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall be ANSI-certified as meeting the requirements of NSF Standard 61. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 732 Make-up water used for on-site generation is of drinking water quality SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires make-up water used in on-site generation of hypochlorite solution to be of drinking water quality. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 733 Hydrogen gas generated in electrolytic cell is vented upward outside of building SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated in the electrolytic cell of the on-site generation system to be vented upward to the outside of the building in a dedicated, unobstructed line. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 734 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 735 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 113 of 117 TP004 - SAND HOLLOW WELL 2 CHLORINATOR -- Liquid Hypochlorination - Active 736 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (an eyewash station is not required) REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations and safety showers shall be provided at all hypochlorite installations where concentrated hypochlorite solutions, containing 5% or greater available chlorine by volume, are handled in containers greater than 55 gallons C 737 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C 738 Means are used to minimize the use of decayed hypochlorite solution, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 739 Is this facility Active or Inactive?A 740 Operational means provided to avoid injection of significantly decayed hypochlorite, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 741 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 742 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 743 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (a full eyewash station and shower is not required) SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 744 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 114 of 117 TP019 - SAND HOLLOW WELL 4 REPL1 HYPOCHLORINATOR -- Liquid Hypochlorination - Active 745 Records are kept to minimize the use of decayed hypochlorite solution MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 746 There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C 747 Is this facility Active or Inactive?A 748 Operational means provided to avoid injection of significantly decayed hypochlorite, such as solution strength testing and delivery records MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C 749 Solution tank is covered to minimize corrosive vapors MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept covered. C 750 Where concentrated hypochlorite solutions (5% or greater) are handled in containers LARGER than 55 gallons: emergency eyewash station and a safety shower present SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 751 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or LESS: some method of emergency eyewash provided (a full eyewash station and shower is not required) SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used at remote locations or in quantities of 55 gallons or less on site, safety showers are not required and alternative emergency eyewash may be provided. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 752 Hypochlorite solution storage area is protected from excessive heat and direct sunlight MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall be designed to minimize the decay in strength of concentrated hypochlorite solutions from excessive heat or direct sunlight. C 753 Records are kept to minimize the use of decayed hypochlorite solution MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide an operational means, such as keeping records of the delivery date of the hypochlorite solution, to avoid the injection of significantly decayed hypochlorite solutions. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 115 of 117 TP001 - ARSENIC & MANGANESE WTP -- Coagulation TP001 - ARSENIC & MANGANESE WTP -- Filtration - General 754 There are adequate spill containment provisions for acid and caustic liquids. MIN | 15pts | TR | TG59 | R309-525-11(6)(a)(iv)(B), R309-525-11(8)(b)(viii) | Rule requires liquid chemical storage tanks to have an overflow and receiving basin or drain capable of receiving accidental spills or overflows, and meeting all the requirements of R309-525-23. C 755 Primary coagulant used at all times the plant is in operation Y 756 What primary coagulant is being used?F 757 Is a coagulant aid or filter aid being added?Y 758 Is there a means to determine coagulant dosage? MIN | 15pts | TR | T083 | R309-525-11(2)(a) and (d) | R309-525-11(2)(a) and (d) C 759 Instrumentation and controls for the process are operational, and in service SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 760 Is turbidity monitoring required? ... if yes, answer the following question(s)Y 760A How often is the turbidity meter calibrated?Monthly 760B How often is the flow of turbidity meter verified?Monthly 760C Is continuous turbidity monitoring in operation. SIG | 50pts | TR | T005 | R309-525-15(4)(b)(vi), R309-525-15(4)(c)(vii) | Each dual media and tri-media filter must be provided with equipment which shall continuously monitor turbidity in the filtered water. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C 761 What is the maximum filtration rate throughout the year (in gpm/sf)?30 MGD 762 What criteria are used to determine when a filter backwash is needed?T 763 What criteria are used to determine filtration is functioning properly? (PSI, Turbidity, Headloss, Flow rate, water quality parameter) Turbidity 764 Criteria is used to determine filter loading rate meets the manufacturers recommendations? R309-525-15(2) Explain in comments... MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for regulatory followup to address concerns. C 765 What criteria are used to determine if filter media needs to be replaced?Headloss 766 Is backwash flow rate verified to determine it meets minimum requirements? MIN | 15pts | TR | T076 | R309-525-15(7) | Rule requires that backwash systems be designed and operated to provide for adequate backwash with minimum media loss. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 116 of 117 767 If system filters by Direct Filtration, the plant is configured to shut down automatically when a source water exceeds 20 NTU for longer than 3 hours, or when the source water turbidity exceeds 30 NTU at any time? R309-530-5(3)(g) SIG | 25pts | TR | T021 | R309-100 - R309-600 | All instrumentation needed to verify that treatment processes are sufficient shall be properly calibrated and maintained. At a minimum, this shall include turbidimeters. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. C DEQ | Drinking Water Run Date: 09/13/2024 10:38:48 | Rating: Approved UTAH27073 WASHINGTON COUNTY WCD - SAND HOLLOW page 117 of 117