Loading...
HomeMy WebLinkAboutDDW-2024-011061Sanitary Survey - Deficiency Report PWS Number:UTAH27005 Deficiency Points:65 Survey Date:09/11/2024 Survey Name:GUNLOCK SPECIAL SERVICE DISTRICT Surveyor:Tom McOmie Sanitary Survey Category: SO SDWIS Severity Code: Significant Deficiency Springs | WS001 | GUNLOCK SPRING 60A. Overflow screened with #4 mesh screen Rule: R309-515-7(7)(d), R309-545-13(3)Overflow pipes on junction and collection boxes shall comply with R309-545 and be screened with No. 4 mesh non-corrodible screens. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:No screen Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: SS04 SPRING BOX OVERFLOW LACKS NO. 4 SCREEN Sanitary Survey Category: SO SDWIS Severity Code: Significant Deficiency Springs | WS001 | GUNLOCK SPRING 60B. Overflow has a minimum of 12 inch clearance above flood rim of receiving basin Rule: R309-515-7(7)(d), R309-545 Overflow pipes on junction and collection boxes shall comply with R309-545 and discharge a minimum of 12 inches above the ground surface or rim of the receiving basin. This significant deficiency must be corrected within 120 days of notification or have a corrective action plan approved by DDW. Notes:Grade has sloughed in around pipe and needs to be dug out. Deficiency Points: 25 Days until points become effective on IPS: 120 SDWIS Deficiency Description: SS14 SPRING BOX OVERFLOW OR DRAIN LACKS FREE FALL OF 12 TO 24 INCHES Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | GUNLOCK SPRING 67. Is a spring box vent present? ... if yes, answer the following question(s) Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect to venting. Therefore, a junction or collection box requires a vent to be fitted with #14 mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the entrance of contaminants, be located and sized to avoid blockage during winter, and have the end of the vent discharge a minimum of 24 inches above the earth on buried structures. Notes:No vent on box. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | GUNLOCK WELL 77. Provisions available to periodically measure water levels Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the completed well. Notes:The well doesn't have a what to check the draw down or water level. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Wells | WS002 | GUNLOCK WELL 84. Well discharge line has a pressure gauge. Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve. Notes:Existing Deficiency Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: S025 NO PRESSURE GAUGE ON WELL DISCHARGE PIPING