HomeMy WebLinkAboutDDW-2024-011061Sanitary Survey - Deficiency Report
PWS Number:UTAH27005 Deficiency Points:65 Survey Date:09/11/2024
Survey Name:GUNLOCK SPECIAL
SERVICE DISTRICT
Surveyor:Tom McOmie
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | GUNLOCK SPRING
60A. Overflow screened with #4 mesh screen
Rule: R309-515-7(7)(d), R309-545-13(3)Overflow pipes on junction and collection boxes shall comply with R309-545 and be
screened with No. 4 mesh non-corrodible screens. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
Notes:No screen
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS04 SPRING BOX OVERFLOW LACKS NO. 4 SCREEN
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | GUNLOCK SPRING
60B. Overflow has a minimum of 12 inch clearance above flood rim of receiving basin
Rule: R309-515-7(7)(d), R309-545 Overflow pipes on junction and collection boxes shall comply with R309-545 and
discharge a minimum of 12 inches above the ground surface or rim of the receiving
basin. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
Notes:Grade has sloughed in around pipe and needs to be dug out.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS14 SPRING BOX OVERFLOW OR DRAIN LACKS FREE FALL OF 12 TO 24 INCHES
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | GUNLOCK SPRING
67. Is a spring box vent present? ... if yes, answer the following question(s)
Rule: R309-515-7(7)(d), R309-545-15 Rule requires junction boxes and collection boxes to comply with R309-545 with respect
to venting. Therefore, a junction or collection box requires a vent to be fitted with #14
mesh or finer non-corrodible screen, be fitted with a protective heavy-gauge screen or
covering if 6 inches in diameter or greater, be down-turned and shielded to prevent the
entrance of contaminants, be located and sized to avoid blockage during winter, and
have the end of the vent discharge a minimum of 24 inches above the earth on buried
structures.
Notes:No vent on box.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS11 SPRING BOX LACKS A MEANS OF VENTING
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS002 | GUNLOCK WELL
77. Provisions available to periodically measure water levels
Rule: R309-515-6(12)(e ), R309-515-6(12)(c)(vi)Rule requires provisions be made to permit periodic measurement of water levels in the
completed well.
Notes:The well doesn't have a what to check the draw down or water level.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S015 WELL LACKS A MEANS TO MEASURE WATER LEVELS PERIODICALLY
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Wells | WS002 | GUNLOCK WELL
84. Well discharge line has a pressure gauge.
Rule: R309-515-6(12)(d)(iv)Rule requires the discharge piping to be equipped with (in order of placement from the
wellhead) a smooth nosed sampling tap, a check valve, a pressure gauge, a means of
measuring flow, and a shutoff valve.
Notes:Existing Deficiency
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: S025 NO PRESSURE GAUGE ON WELL DISCHARGE PIPING