Loading...
HomeMy WebLinkAboutDDW-2024-011051Sanitary Survey - Deficiency Report PWS Number:UTAH13019 Deficiency Points:35 Survey Date:08/30/2024 Survey Name:NAVAJO LAKE LODGE Surveyor:Luke Treutel Sanitary Survey Category: SM SDWIS Severity Code: Recommendation Management and Operations | DS001 | UTAH13019 DISTRIBUTION SYSTEM 31. Does your water system have an Emergency Response Plan? Rule: R309-105-18 All suppliers are advised to develop contingency plans to cope with possible emergency situations. In many areas of the state the possibility of earthquake damage shall be realistically considered. Notes:No current emergency response plan. Surveyor provided resources to help system develop plan. Deficiency Points: 0 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M001 NO CURRENT EMERGENCY RESPONSE PROGRAM Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH13019 DISTRIBUTION SYSTEM 36. Documentation of annual public awareness and/or employee training Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes providing public education or awareness material or presentations. Notes:No records of public education or employee training for cross connection control. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M004 CCC-NO ANNUAL PUBLIC EDUCATION OR AWARENESS Sanitary Survey Category: SM SDWIS Severity Code: Minor Deficiency Cross Connection and Operator Certification | DS001 | UTAH13019 DISTRIBUTION SYSTEM 39. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments) Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program that includes test history and documentation of on-going enforcement activities. Notes:No records of on-going cross connection control enforcement activities. Deficiency Points: 15 Days until points become effective on IPS: 0 SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION Sanitary Survey Category: SO SDWIS Severity Code: Minor Deficiency Springs | WS001 | LARSON LODGE SPRING 69. Spring has a permanent flow-measuring device. Rule: R309-515-7(7)(h)Rule requires a spring to have a permanent flow measuring device. Notes:System lacks a permanent flow-measuring device for this spring. Deficiency Points: 5 Days until points become effective on IPS: 0 SDWIS Deficiency Description: SS01 LACKS A PERMANENT DEVICE FOR MEASURING SPRING FLOW