Loading...
HomeMy WebLinkAboutDERR-2024-010658[)cpartritcnt of nvironntcntal Quali hir:rhur li i) {111.J1.", August 08,2024 MIKE BEAUPARLANT RED MESA TRADING CO. INC 501 AIRPORT DR. SUITE 1OO FARMINGTON, NM 87401 RE: Request for Petroleum Storage Tank Records RED MESA EXPRESS #516, located at HWY 262, MONTEZUMA CREEK Facility ldentification No. 5000329 Dear MIKE BEAUPARLANT PST operators are required to ensure that certain tests are conducted for their tank system Dates highlighted in "Yellow" - tests are due soon. Dates highlighted in "Red" - tests are due and you are out of compliance. Tank lD/Alt ID Description LTT Spill Bucket Tank or Flex ATG LLD Overfill Pipe CP Sump 1/105-UGTA Gasol ine-Regular-6000 2t216-UGrA Gasoline-Premium-6000 3/217-UGTA Diesel-Diesel#2(U.L.S.)-6000 LTT - Line Tightness Test LLD - Line Leak Detector Overfill - Overfill Device Tank or Flex/Pipe CP - Corrosion Tests ATG - Automatic Tank Gauging Sump - Tank Top Sump and applicable Dispenser Sumps Please note that UDG tests are not listed, but are required on your facility's next sump test cycle starting July 1 ,2023, if applicable. Also, effective immediately pressure vent valves must be tested every three years for gasoline tanks. Please submit a copy of the required tests to the DERR within 30 days of the date due. lf you have any questions please call David Wilson at 801-536-4100. N/A N/A 912312024 N/A N/A N/A N/A N/A N/A N/A 9123t2024 N/A N/A N/A N/A N/A N/A N/A 912312024 N/A N/A N/A N/A N/A Statc ol Utah SPEI.JCEq J COX (-irt *,tn'tr DE!DRE HENDEPSOI, l.t, il!t tt,.tttI {. /,t t'rit) d)PEt/RPl200-19 APPENDIX C.3 Facility Name: Red Mesa Express #516 Owner: Red mesa Trading Co. Address: U$ Hwy.262 & lH 35 Address: 501 Airport Dr. ste 100 City, State, Zip Code: Montezuma Creek,UT. 95434 City, State, Zip Code: Farmington,N.M. 87401 Facility l.D. #: 5000329 Phone #: 505 326 5571 Testing Company: BioTech Remediation lnc.Phone #:Dale: 8-1-24 This procedure is to test the leak integrity of single and double-walled spill buckets. See PEl,zRPl2OO Section 6.2 for hydrostatic test method, Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method. Tank Number #1 #2 #3 Product Stored UL/R UL/S DSL Spill Bucket Capacity 5 Gal.5 Gal.5 Gal Manufacturer EBW EBW OPW,1C series Construction m Single-walled ! Double-walled E Single-walled E Double-walled E Single-walled I Double-walled n Single-walled n Double-walled n Single-walled E Double-walled n Single-walled I Double-walled Test Type B Hydrostatic n Vacuum ! Single-walledI Double-walled m Hydrostatic D Vacuum D Single-walled n Double-walled K Hydrostatic n Vacuum n Single-walled n Double-walled n Hydrostatic D Vacuum n Singlewalled E Double-walled I Hydrostatic D Vacuum D Single-walled D Double-walled E Hydrostatic ! Vacuum n Single-walled n Double-walled Spill Bucket Type E Product E Vapor E Product ! vapor DI Product D Vapor ! Product D Vapor n Product nVapor I Product n Vapor Liquid and debris removed from spill bucket?* XYes DNo ElYes nNo ElYes DNo trYes flNo trYes ! No nYes nNo Visual lnspection (No cracks, loose parts or separa- tion of the bucket from the fill pipe.) E Pass n Fail El Pass n Fail E Pass D Fait D Pass tr Fail fl Pass ! Fail tr Pass tr Fail Tank riser cap included in test? EYes nNo !NA EYes nNo f] NA ElYes tr No trNA flYes ENo trNA EYes ENo NNA flYes nNo trNA Drain valve included in test? EYes n No trNA DIYes n No NNA EYes E No NNA nYes DNo DNA DYes trNo DNA trYes DNo trNA Starting Level 9"8'11.25" Test Start Time 10:25 10:2Q Ending Level 9.8"11.25" Test End Time 11:45 12:15 11:45 Test Period '1 Hr 20 min 1Hr,t hr 25 min Level Change 0"0'0' Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1il8 inch; Vacuum single-walled only: Maintain at least 26 inches water column; Vacuum double-walled: maintain at least 12 inches water column. Tegt Reeults E Pass I Fait Ei Pass X Fail E Pass n Fail I Pass D Fait D Pass n Fail n trPass Drain valve in UL/S spill bucket not seating properly, remove drain valve assembly and clean o-ring and plunger and reinstall. Comments: SPILL BUCKET INTEGRITY TESTING HYDROSTATTC TEST METHOD SINGIE. AND DOUBLE.WALLED VACUUM TEST METHOD *All liquids and debris must be Tester's Name (print) pei.org@ M,re of properly. Tester's Signatu 11:15