HomeMy WebLinkAboutDDW-2024-010847
State of Utah
Department of
Environmental Quality
Kimberly D. Shelley
Executive Director
DIVISION OF DRINKING WATER
Nathan Lunstad, P.E.
Director
SPENCER J. COX
Governor
DEIDRE HENDERSON
Lieutenant Governor
January 26, 2024
Alliance Acquisitions LLC
℅ Tony Johnson
594 South 400 East
River Heights, Utah 84321
Subject: Initial Order for New Public Water System for USU Forestry Field Camp Spring
UTAH03125
Dear Tony Johnson:
According to a New Public Drinking Water System Information Form submitted by Tony Johnson to the
Division of Drinking Water on December 26, 2023, the USU Forestry Field Camp Spring (the System)
serves a population of 50 persons and has the capacity to serve 100 persons. This constitutes a public
water system under state and federal drinking water rules. Alliance Acquisitions LLC, a Utah limited
liability company, is the owner and/or operator of a public water system (PWS) as explained in the Utah
Safe Drinking Water Act and the Utah Public Drinking Water Rules in Utah Administrative Code (UAC)
R309-100-4. As a result, the Director of the Division of Drinking Water is required by law to initiate a
formal administrative process to recognize the system as a new public water system and to ensure that it
complies with both state and federal drinking water regulations. As part of that process, I have attached an
Initial Order for New Public Water System explaining the requirements for the system.
The Division understands that compliance with state and federal legal requirements can involve
significant administrative and financial burdens for public drinking water systems, especially new
systems. Those regulations are designed to ensure that public water systems are able to provide safe and
reliable drinking water to the people they serve. Coming into compliance with state and federal
regulations can require time and resources. Utah’s public water systems, including your system, provide
essential services that directly impact human health and welfare.
The attached order includes contact information for Division staff with expertise in the rules and
regulations that apply to public water systems. Containers for samples are available from all certified
laboratories. While the Division cannot recommend a specific laboratory, we have enclosed a list of
certified laboratories that perform water testing.
In all correspondence with our office and the laboratories, please indicate the public water system
number. The number for your water system is UTAH03125. Clearly mark the system number on all
samples. Enclosed is the inventory list for your system. Please carefully review this report and return it to
our office with any corrections.
Enclosed is also a copy of your Improvement Priority System (IPS) Report. IPS points are used to rate
and track a water system’s compliance with state and federal drinking water regulations. This report
indicates several dormant deficiencies associated with the required actions listed in the attached Order.
Alliance Acquisitions LLC
Page 2 of 2
January 26, 2024
These dormant deficiencies serve as a tracking tool and reminder; they do not affect the water system’s
points or rating unless the due date for the required task has expired. The dormant deficiencies are
removed from our database when the PWS completes the required tasks and notifies the Division.
The Division has online tools to help manage your water system, including:
● Waterlink.utah.gov: WaterLink is an online tool that allows public water systems to access
current system information, including the system’s inventory, monitoring schedules, IPS
Report, operator records, and the system’s Bacteriological record for the last 12 months. To
get full use out of these tools, you will need to create a Waterlink portal account. You can do
this by navigating to the Public/Portals menu on the top right side of the waterlink.utah.gov
home page and selecting the Portal. For help creating a WaterLink Portal account, please
contact Mz. (Tammie) Allen at (385) 272-5404 or tammieallen@utah.gov.
● Eqedocs.deq.utah.gov: Each water system’s public records are available here. These records
may include previous monitoring results, Division correspondence, former Consumer
Confidence Reports, and other documents related to the water system. Browse to your water
system listed alphabetically under “County” to see what we have on record for your system.
Please call the Division at (801) 536-4200 if you have any questions.
We are here to help you through this process. If you have any questions about this Order, please contact
Colt Smith at (385) 515-1529 or acsmith@utah.gov. To contest or appeal this Order, please contact Bret
Randall of the Attorney General’s office at (801) 536-0284 or bfrandall@agutah.gov (alternatively,
Elizabeth Burns of the Attorney General’s office at (385) 441-4789 or elizabethburns@agutah.gov).
Sincerely,
Nathan Lunstad P.E.
Director
Division of Drinking Water
Enclosures: Initial Order for New Public Water Systems
Improvement Priority System (IPS) Report
Inventory List
Total Coliform Sample Site Plan Template
cc: Terry Smith, Rural Water Association of Utah, tsmith@rwau.net
Hunter Payne, Division of Drinking Water, hnpayne@utah.gov
Cameron Draney, Division of Drinking Water, cdraney@utah.gov
Shauna Benvegnu-Springer, Utah Division of Public Utilities, sbenvegn@utah.gov
Brandon Mellor, Utah Division of Water Rights, bmellor@utah.gov
Rachel Shilton, Utah Division of Water Resources, rachelshilton@utah.gov
Ben Harker, Bear River Health Department, bharker@brhd.org
Bret F. Randall, Assistant Attorney General, bfrandall@agutah.gov -or
Elizabeth A. Burns, Assistant Attorney General, elizabethburns@agutah.gov
Christopher Brown, EPA Region 8, brown.christopher.t@epa.gov
EQDWMonitoring, EQDWCOA, and EQDWFS
1
UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF DRINKING WATER
In the Matter of:
USU Forestry Field Camp Spring, a Utah
Public Water System (UTAH03125)
INITIAL ORDER FOR NEW PUBLIC
WATER SYSTEM
Docket No. UTAH03125-2024-01
This INITIAL ORDER FOR NEW PUBLIC WATER SYSTEM (“Order”) is issued by the
Director of the Utah Division of Drinking Water (“Director”) under the Director’s legal authorities
described below. This Order is issued to Alliance Acquisitions, LLC, a Utah limited liability
company, in its capacity as the “Supplier,” who is legally responsible for the water system.
STATUTORY AND REGULATORY AUTHORITY
1. In 1974, Congress enacted the federal Safe Drinking Water Act, codified at 42 U.S.C. §
300f et seq., as amended. 42 U.S.C. § 300g-2 allows states to achieve primary enforcement
responsibility after the Environmental Protection Agency (“EPA”) has determined that the
state has adopted and can implement a state program that is no less stringent than the federal
public drinking water program (“Primacy”).
2. The Utah legislature has enacted the Utah Safe Drinking Water Act, codified at Utah Code
§ 19-4-101, with the intent of achieving Primacy.
3. Utah Code § 19-4-104 authorizes the Utah Drinking Water Board (the “Board”), among
other things, to make rules regulating public water systems in the state of Utah. Utah Code
§ 19-4-104(1)(c)(vi) charges the Board to “meet the requirements of federal law related or
pertaining to drinking water.” The Board has promulgated the Utah Public Drinking Water
Rules, codified at Utah Administrative Code (“UAC”) R309.
4. In 1980, the EPA Administrator determined, in accordance with 40 C.F.R. § 142.11, that
the Utah public drinking water program met the federal requirements for Primacy. See 45
Fed. Reg. 6647 (January 29, 1980). In accordance with 40 C.F.R. § 142.17, the EPA
Administrator has reviewed, and continues to review annually, the Utah public drinking
water program to evaluate its continuing compliance with the requirements set forth in 40
C.F.R. Part 142.
5. The Board has defined public water systems under the Utah Public Drinking Water Rules,
UAC R309-110-4.
6. UAC R309-100-7 requires the Director to “assign a rating to each public water supply in
order to provide a concise indication of its condition and performance” in accordance with
2
R309-400. This rule is generally known as the Improvement Priority System (“IPS”) rating
system.
7. The IPS rating system “is a point system used by the division to evaluate a public water
system’s performance and compliance with the drinking water rules in Title 309,
Environmental Quality, Drinking Water.” UAC R309-400-3(1). Under the IPS rating
system, each public water system is assigned a rating “to characterize the water system’s
compliance with drinking water rules and overall operation and performance.” UAC R309-
400-3(2). The IPS rating system is “used by the division to assign compliance ratings to
public water systems and to prioritize enforcement action based on points assessed for
noncompliance with drinking water rules.” UAC R309-400-1(1).
8. UAC R309-400-5 provides that a water system’s IPS rating shall be assigned “based on
the total number of points assessed for noncompliance” based on a point system established
by the Board. Generally, the number of points represents the threat to the quality of the
water and therefore, public health.
9. UAC R309-400-4(1)(a)(ii) sets the maximum number of points any given type of system
may have before it is rated by the Director as “Not Approved” status. For systems
exceeding the point threshold, the Director is required to issue a “Not Approved” rating.
The thresholds are as follows: (i) for community water systems, 150 points; (ii) for non-
transient, non-community water systems, 120 points; and (iii) for non-community water
systems, 100 points.
10. UAC R309-400-4 allows the Director to assess points against public water systems upon
their failure to comply with Division directives and orders.
11. UAC R309-400-5 allows the Director to rate any public water system as “Not Approved”
at any time if an immediate threat to public health exists.
12. UAC R309-400-5 provides that a public water system may qualify for a “Corrective
Action” rating for its public water system upon submission of a written agreement stating
a willingness to comply with the requirements set forth in the Rules and complying with
other requirements.
13. Pursuant to Utah Code § 19-4-106(d), the Director may enforce rules promulgated by the
Board through the issuance of orders. See also UAC R309-100-8.
14. Utah Code § 19-4-107 provides that upon discovery of any violation of a rule or order of
the Board, the Director shall promptly notify the supplier of the violation, state the nature
of the violation, and issue an order requiring correction of that violation.
15. Utah Code § 19-4-109 provides that any person who violates the Act or a rule or order
made or issued pursuant to the Act may be subject to an administrative penalty of up to
$1,000 per day of violation or a civil penalty of up to $5,000 per day of violation.
16. The Director’s jurisdiction to issue this Order is based, in part, on Section 1447(a) of the
Safe Drinking Water Act, codified at 42 U.S.C. § 300j-6. The federal act provides that if a
3
state has achieved enforcement primacy, then federal agencies are subject to the
jurisdiction of the state agency with enforcement primacy. In directing federal facilities to
be subject to and to comply with all state requirements “in the same manner and to the
same extent as any [non-governmental entity,],” the explicit language of the federal act
demonstrates Congress’ intention that federal facilities be treated as any other public water
system covered by the federal act and, in turn, the state law (the Utah Safe Drinking Water
Act) and rules that implement the federal act. Thus, the Director is required to assert
jurisdiction over the Supplier in this matter in the same manner and to the same extent as
any non-governmental entity.
FINDINGS
Based on information available to the Director, the Director makes the following Findings for
purposes of this Order:
17. Alliance Acquisitions, LLC (“Respondent”) is a Utah limited liability company based on
public records on file with the Utah Division of Corporations:
(a) Respondent has the following registered business address: 594 South 400 East
River Heights, Utah 84321
(b) The principal or owner of Respondent is Tony Johnson with the following address:
594 South 400 East River Heights, Utah 84321
(c) The legal registered agent of Respondent is Tony R. Johnson, with the following
registered agent address: 594 South 400 East River Heights, Utah 84321
18. A public water system (the “System”) exists located approximately one-half mile south of
Tony Grove along the east side of Highway 89 in Cache County, Utah. The System is a
public water system based on the following facts:
(a) Respondent owns a camp used for day and overnight camping and education events.
Utah State University formerly managed the camp. Still, according to records and
interviews conducted by the Division of Drinking Water, the camp was never
regulated as a public system during Utah State University’s ownership. The System
serves approximately 100 transient users. Respondent serves culinary water to the
foregoing population.
(b) The System has a groundwater spring serving an independent distribution system
serving approximately three service connections. Respondent owns and operates
the System and is responsible for its maintenance and repair.
19. On December 26, 2023, Respondent submitted a New Public Drinking Water System Form
signed and submitted by Tony Johnson.
4
20. Tony Johnson is the Division’s administrative contact for the System.
CONCLUSIONS OF LAW
Based on the foregoing Findings of Fact, the Director hereby makes the following conclusions of
law:
21. Respondent is the owner and operator of the System, which is a public drinking water system
within the meaning of the Utah Safe Drinking Water Act and the Utah Public Drinking
Water Rules.
22. Respondent is a “Supplier” within the meaning of the Utah Safe Drinking Water Act, Utah
Code § 19-4-102(10).
23. The System qualifies as a transient non-community Public Water System under the Utah
Public Drinking Water Rules.
ORDER
Based on the foregoing Findings of Fact and Conclusions of Law, IT IS HEREBY ORDERED as
follows:
24. System Status: The System is hereby rated as an active but “unrated” transient non-
community water system under the Division’s water rating system rules, UAC R309-400.
A water system’s rating can only become “approved” after it obtains an Operating Permit
from the Director for the entire water system, including its drinking water sources.
25. Plan Review
(a) Engineering Evaluation Report: Because the System has been in existence and
operation prior to the date of this Order, Respondent shall submit an
Engineering Evaluation Report prepared by a Professional Engineer
licensed to practice in Utah to the Division on or before 180 days from the
date of issuance of this order. The engineering evaluation report shall contain
detailed information of all current drinking water facilities including source
springs and/or wells, storage tanks, pumps, distribution system, number of
connections, water rights, System schematics, etc., and hydraulic model report.
An Engineering Evaluation Report is a document used to start the process of the
Division’s review of all the existing drinking water facilities associated with your
system to ensure compliance with the current design and construction standards
for public drinking water systems (UAC R309-550). The Division will use this
report to enter all drinking water facilities into the Division’s database and to
determine all drinking water facilities meet applicable UAC R309-500
requirements to protect the public’s drinking water.
5
The Division will issue after-the-fact Plan Approval and an Operating Permit for
all drinking water facilities detailed in the Engineering Evaluation Report. A new
water system’s rating becomes “approved” after it obtains an Operating Permit
from DDW. Please contact Hunter Payne (hnpayne@utah.gov), if you have any
questions regarding the engineering evaluation report.
(b) Plan Review Files: UAC R309-500 through 550 govern the design, construction,
operation, maintenance, and plan review procedure requirements for drinking
water projects. Drinking Water Projects are defined in UAC R309-500-5(1) as
any part of the project that includes the construction of, addition to, or
modification of a public drinking water facility that may affect the quality or
quantity of water delivered.
If improvements need to be made to the existing water system, all Drinking
Water Projects must have Division Plan Approval prior to construction and
Division issuance of an Operating Permit before facilities can be placed into
service. Please see our website for general information on the Plan Review
process, documentation required, and contact Hunter Payne
(hnpayne@utah.gov) from the Division’s Permitting Section regarding the
permitting process.
(c) Operating Permit: Respondent shall complete all of the Director’s
requirements to obtain an After-the-Fact Operating Permit on or before 18
months from the date of issuance. The Division will assess 50 deficiency
points for using unapproved facilities and 200 deficiency points for using an
unapproved water source if this water system is in operation and does not obtain
an Operating Permit for the entire water system on or before 18 months from
the date of issuance.
26. Capacity Development Evaluation
(a) UAC R309-800 requires an assessment of a new water system’s technical,
managerial, and financial capabilities.
(b) Respondent shall comply with UAC R309-800 by documenting the
System’s capabilities using one of the methods described on the Division’s
website.
(i) Existing water systems should submit completed copies of the Capacity
Assessment Evaluation forms, located on the Division’s website at:
https://documents.deq.utah.gov/drinking-water/forms/DDW-2018-
003083.pdf; or
(ii) New or proposed water systems shall submit a business plan as described in
UAC R309-800-5(4) for Division review and approval within one year of the
date of issuance of this Order.
6
(c) Receiving approval for the capacity assessment worksheets or the business plan
is a prerequisite for issuing an Operating Permit for this water system. Please
contact Michael Grange at (801) 536-0069 (mgrange@utah.gov) for assistance
related to Capacity Development/Assessment.
27. Sanitary Survey and Emergency Response
(a) Sanitary Survey: Respondent shall schedule the onsite inspection/sanitary
survey on or before 365 days from the date of issuance of this order and
before an operating permit can be issued. Please contact Ryan Dearing at
801-419-6785 or rdearing@utah.gov if you have any questions regarding the
scheduling of the onsite inspection or engineering review.
(b) In the event of any situation constituting an emergency, the Supplier is required
to contact the Division within eight hours of identifying the emergency as
outlined in UAC R309-105-18. Division personnel may be reached at all times
by calling our Emergency Response Line at 801-560-8456. Emergency
situations include any of the following:
(i) Malfunction of any disinfection or treatment facility.
(ii) Malfunction of any treatment plant clearwell, which constitutes a
turbidity spike of 5 NTU for greater than fifteen minutes.
(iii) Water discoloration for a significant number of connections cannot
be explained by air entrainment or re-suspension of sediments
normally deposited within the distribution system.
(iv) Malfunction or accident that could introduce surface water or other
potential contamination into the distribution system, e.g., cross
connection, major water break, chemical spill or overfeed pressure
loss, or natural disaster.
(v) The threat of sabotage or acts of vandalism to any drinking water
facility.
(vi) Any instance where a customer reports sickness from drinking the
water and that claim is substantiated by a doctor.
(c) The supplier is advised to develop contingency plans to cope with possible
emergency situations, including earthquakes, wildfires, flooding, and other
natural or human-caused disasters.
28. Cross-Connection Control Program:
The Respondent shall develop a cross-connection control program for the System to prevent
any cross-contamination. There are five elements to a cross-connection control program:
7
local authority statement, annual public education or awareness, operator training, written
records, and ongoing enforcement. If you have any questions about the cross-connection
control program, please contact Gary Rager at (801) 536-4498 (grager@utah.gov).
(a) Respondent shall complete the local authority statement on or before 90 days
from the date of issuance.
(b) Respondent shall complete the annual public education or awareness, operator
training, written records, and ongoing enforcement on or before 180 days from
the date of issuance.
29. Source Protection Program
(a) A Preliminary Evaluation Report (PER) and full Drinking Water Source
Protection (DWSP) plan is required for all sources connected to the System.
Guidance for preparing the PER and full DWSP plan can be found online at
https://deq.utah.gov/drinking-water/preparing-source-protection-plans. Please
call (801)536-4200 and ask to speak to the source protection staff if you have
questions about this requirement. Respondent shall submit the PER and full
DWSP plan on or before 180 days from the date of issuance.
30. Monitoring and Reporting Requirements
(a) Total Coliform Monitoring
Respondent shall take at least one routine coliform bacteriological
sample from the distribution system and submit it to a certified laboratory
for each calendar month that the water system is used. It is the responsibility
of the Respondent to send a copy of the results to our office by the 10th of the
following month. In the event of a coliform positive result, the Respondent
shall take three repeat samples and a triggered source Escherichia coli sample
for each groundwater source in service at the time of the original positive
sample. For any questions regarding the Total Coliform Rule or Groundwater
Rule, contact Sitara Federico at (385) 515-1459 (sfederico@utah.gov).
(b) Total Coliform Sample Site Plan
Respondent shall develop a written sample site plan that identifies
sampling sites and sample collection schedules that are representative of
water throughout the distribution system. Respondent shall collect the total
coliform samples according to the written sample site plan template.
Included with this Order is a blank copy of the Total Coliform Sample Site
Plan. For any questions regarding the bacteriologic sample site plan, contact
Sitara Federico at (385) 515-1459 (sfederico@utah.gov).
(c) Seasonal Start-Up
Prior to opening to the public each year, this system is required to perform
a seasonal start-up procedure and submit certification of that process to the
8
Utah Division of Drinking Water. This start-up procedure must include but
is not limited to the Supplier inspecting the System facilities to assess needed
repairs, flushing and disinfecting water lines, and collecting a satisfactory
investigative bacteriological sample. Results must be reported to DDW at
seasonalstartup.utah.gov.
(d) Chemical Monitoring
Respondent shall monitor New Source Inorganics and Metals. After the
initial analysis has been done, and if the results are in compliance, then your
source will be required to be sampled for Nitrate once a year and Sulfate
every three years. Please contact David Kruse at (385) 566-7789
(dbkruse@utah.gov) with questions.
(e) Monitoring Schedule
A current monitoring schedule for the System has been enclosed.
Respondent shall become current with System total coliform monitoring
and submit a sample site plan to the Division by June 1, 2024, and
chemical monitoring by July 31, 2024. Please contact Mark Berger at (801)
641-6457 (mberger@utah.gov) for general monitoring schedule questions.
GENERAL PROVISIONS
31. Upon satisfactory compliance with the requirements in the Order section, the Director may
issue a subsequent administrative order changing the status of the System to “Approved” in
accordance with UAC R309-100-7 and R309-400. Pursuant to such subsequent order, the
Director may also take other appropriate actions or impose appropriate conditions based on
the facts presented.
32. This Order does not in any way relieve the Supplier of any other obligation imposed under
the Act or any other state, federal, or local law, rule, or regulation.
33. Nothing contained in this Order shall preclude the Director from taking actions to include
additional penalties against the Supplier for future violations of State or Federal law.
34. The Date of Issuance shall be the date that the Director signs this Order.
35. The dates set forth in the Order section may be extended in writing by the Director, in the
Director’s sole discretion, based on the Supplier’s showing of good cause. Good cause for
an extension generally means events outside of the reasonable control of the Supplier, such
as force majeure, inclement weather, contractor or supplier delays, and similar
circumstances. However, the Director expects the Supplier to employ reasonable means to
limit foreseeable causes of delay. The timeliness of the Supplier’s request for an extension
shall constitute an important factor in the Director’s evaluation.
COMPLIANCE AND PENALTY NOTICE
9
36. All violations of the Utah Safe Drinking Water Act, the Drinking Water Rules, and this
Order will be strictly enforced during the time that this Order remains in effect. The Utah
Safe Drinking Water Act, Utah Code § 19-4-109, provides that any person who violates a
rule or order made or issued pursuant to the Act may be subject to an administrative penalty
of up to $1,000 per day of violation or, in a civil proceeding, to a civil penalty of up to
$5,000 per day of violation. Under certain circumstances of willfulness or gross negligence,
a Utah district court judge may impose an additional penalty up to $5,000 per day of
violation. Under the act, each day may be considered a separate violation. A violator may
also be subject to injunctive relief pursuant to Utah Code § 19-4-107(2).
CONTEST AND APPEAL RIGHTS
37. This Order is effective immediately and shall become final unless contested in writing
within thirty (30) days of the date of its issuance. This Order may be contested by filing
a written Request for Agency Action in accordance with UAC R305-7. Filing a request for
a hearing or a general statement of disagreement is not sufficient under Utah Code § 63G-
4-201(3)(a) to preserve your right to contest this Order. A request for Agency Action must
include the information specified in UAC R305-7. Contest proceedings are also governed
by Utah Code Section 19-1-301. Failure to file a Request for Agency Action within the
period provided waives any right of administrative contest, reconsideration, review, or
judicial appeal. An extension is only available under UAC R305-7.
38. To contest this Order, the Supplier must respond in writing and must comply with the
applicable procedural requirements found at UAC R305-7 and with the applicable
requirements of the Utah Administrative Procedures Act, including Utah Code §§ 63G-4-
201(3)(a) and (b). The Supplier’s written Request for Agency Action must be filed and
served in accordance with UAC R305-7-104(5) within 30 days of the date of issuance of
this Order. For U.S. Mail delivery under UAC R305-7, the Director’s address is Director,
Division of Drinking Water, P.O. Box 144830, Salt Lake City, UT 84114-4830.
IT IS SO ORDERED.
DIVISION OF DRINKING WATER
By:_____________________________
Nathan Lunstad P.E.
Director
Date:___________________________
January 26, 2024
System Name: USU Forestry Field Camp Spring
System Number: UTAH03125
Administrative Contact: Tony Johnson
Email: lexi.johnson@amlutah.com
Phone Number: 435-764-2200
New System Order Due Dates
Date of Issuance: January 25, 2024
Plan Review
Item
25(a)(b)
Engineering Evaluation Report Rule Citation
R309-500
Action Completion Due Date
Submit an Engineering Evaluation Report prepared by a Utah
licensed engineer containing detailed information on all
system facilities.
Within 180 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Hunter Payne
(385) 278-9837
hnpayne@utah.gov
Item
25(c)
Operating Permit Rule Citation
R309-500-4
Action Completion Due Date
The respondent shall complete all requirements to obtain an
Operating Permit.
Within 545 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Hunter Payne
(385) 278-9837
hnpayne@utah.gov
3. Capacity Development Evaluation
Item 26 Capacity Development Evaluation Rule Citation
R309-800
Action Completion Due Date
The respondent shall complete all requirements for their
capacity development.
Within 545 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Michael Grange
801-674-2563
mgrange@utah.gov
4. Sanitary Survey and Emergency Response
Item 27 Sanitary Survey Rule Citation
R309-100-6
Action Completion Due Date
The respondent shall schedule an onsite inspection/sanitary
survey.
Within 365 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Ryan Dearing
801-419-6785
rdearing@utah.gov
5. Cross Connection Control
Item
28(a)
Local Authority Statement Rule Citation
R309-105-12(2)
Action Completion Due Date
The respondent shall submit a complete Cross Connection
Control Local Authority Statement to the Division.
Within 90 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Gary Rager
385-549-7609
grager@utah.gov
Item
28(b)
Public Education, Operator Training, Record Keeping,
On-Going Enforcement Implementation
Rule Citation
R309-105-12(2)
Action Completion Due Date
The respondent shall complete the annual public education or
awareness, operator training, record keeping and on-going
enforcement plan and submit evidence to the Division.
Within 180 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Gary Rager
385-549-7609
grager@utah.gov
6. Source Protection Program
Item 29a Preliminary Evaluation Report Rule Citation
R309-600-13
Action Completion Due Date
Respondent shall submit a Preliminary Evaluation Report. Within 180 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Deidre Beck
(385) 271-7046
dbeck@utah.gov
Item 29a Drinking Water Source Protection Plan Rule Citation
R309-600-7
Action Completion Due Date
The respondent shall submit a Drinking Water Source
Protection Plan.
Within 365 days of the Date of
Issuance of this Order.
Division of Drinking Water Contact
Deidre Beck
(385) 271-7046
dbeck@utah.gov
9. Monitoring and Reporting
Item
30(a)
Total Coliform Monitoring Rule Citation
R309-211
Action Completion Due Date
The respondent shall submit monthly routine coliform
bacteriological samples to the Division each month the system
is open.
By June 1, 2024
Division of Drinking Water Contact
Sitara Federico
385-515-1459
sfederico@utah.gov
Item
30(b)
Total Coliform Sample Site Plan Rule Citation
R309-211-4
Action Completion Due Date
The respondent shall submit a written total coliform sample
site plan to the Division.
By June 1, 2024
Division of Drinking Water Contact
Sitara Federico
385-515-1459
sfederico@utah.gov
Item
30(c)
Seasonal Start-Up Rule Citation
R309-211-5(3)
Action Completion Due Date
The respondent shall perform seasonal start-up procedures and
submit certification of that process to the Utah Division of
Drinking Water..
By July 10, 2024
Division of Drinking Water Contact
Sitara Federico
385-515-1459
sfederico@utah.gov
Item
30(d)
New Source Chemistries Rule Citation
R309-515-4(5)
Action Completion Due Date
The respondent shall take and submit all required New Source
Chemistries for each active source.
By July 31, 2024
Division of Drinking Water Contact
David Kruse
385-566-7789
dbkruse@utah.gov
Utah Department Of Environmental Quality
Division Of Drinking Water
Admin Contacts
Inventory Report
Service Connections
Sources
Site Visit History
USU FORESTRY FIELD
CAMP SPRING
PWS ID: UTAH03125 Rating:Active
Legal Contact
ARDENT MANAGEMENT LLC
TONY JOHNSON
255 SOUTH MAIN ST
LOGAN, UT 84321
Phone: 435-764-2200
County: CACHE COUNTY
System Type: Transient Non-Community
Population: 100
Site Updates
Last Inventory Update: 01/29/2024
Last Surveyor Update:
Surveyor:
Operating Period: 6/1 - 10/31
Last IPS Update: 01/29/2024 14:10:00
Consumptive Use Zone
Irrigation Zone: null
Date:
Name Title Office Emergency Email
JOHNSON, TONY 435-764-2200 lexi.johnson@amlutah.com
Type Meter Type Meter Size # Of Connections
Commercial Unknown 0 5
Total Service Connections: 5
ID Source Name OP Date Status Reason Source
Type Water Type Period Of
Op
WS001 LITTLE BEAR SPRING Active Spring Groundwater 6/1 - 10/31
Date Visited Survey Type Surveyor Notified Date Next Inspection
01/29/2024 Needs Survey 01/29/2024
DEQ | Drinking Water
Run Date: 01/29/2024 16:29:37 | Rating: UTAH03125 USU FORESTRY FIELD CAMP SPRING page 1 of 5
Bacterial Summary Report
Routine Bacteriological Sampling Requirements
Total Coliform Sample History
12/01/2022 - 01/31/2024
Sample Reuired Schedule Begin Schedule End Operation Begin Operation End
1/Monthly/Routine 06/01/2024 6/1 10/31
Routine Sampling Repeat Sampling Triggered Sampling Assessment Sampling
Month #Sample
s TC+Ecoli+#Sample
s TC+Ecoli
+
#Sample
s TC+Ecoli
+
#Sample
s TC+Ecoli
+
Dec-22 0 0 0 0 0 0 0 0 0 0 0 0
Jan-23 0 0 0 0 0 0 0 0 0 0 0 0
Feb-23 0 0 0 0 0 0 0 0 0 0 0 0
Mar-23 0 0 0 0 0 0 0 0 0 0 0 0
Apr-23 0 0 0 0 0 0 0 0 0 0 0 0
May-23 0 0 0 0 0 0 0 0 0 0 0 0
Jun-23 0 0 0 0 0 0 0 0 0 0 0 0
Jul-23 0 0 0 0 0 0 0 0 0 0 0 0
Aug-23 0 0 0 0 0 0 0 0 0 0 0 0
Sep-23 0 0 0 0 0 0 0 0 0 0 0 0
Oct-23 0 0 0 0 0 0 0 0 0 0 0 0
Nov-23 0 0 0 0 0 0 0 0 0 0 0 0
Dec-23 0 0 0 0 0 0 0 0 0 0 0 0
Jan-24 0 0 0 0 0 0 0 0 0 0 0 0
DEQ | Drinking Water
Run Date: 01/29/2024 16:29:37 | Rating: UTAH03125 USU FORESTRY FIELD CAMP SPRING page 2 of 5
Water Monitoring Report
BACTERIOLOGICAL MONITORING
MONITORING REQUIREMENTS BY FACILITY
Sample Count Type Frequency Schedule Begin Schedule End Analyte Name
1 Routine Monthly 06/01/2024 COLIFORM (TCR)
ID NAME
WS001 LITTLE BEAR SPRING
Name Sample
Count Type Frequency Last Sampled Next Sample Due
NEW SOURCE IOC 1 Routine One Time 07/31/2024 - 07/31/2024
Open Compliance Schedule
Type Required Activities Severity Created Due
Revised Total Coliform Rule SEASONAL STARTUP PROCEDURES 01/01/2024 06/01/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 01/29/2024 07/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 01/29/2024 07/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 01/29/2024 07/24/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
CAPACITY DEVELOPMENT EVALUATION 01/29/2024 07/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
ONSITE INSPECTION/SANITARY SURVEY 01/29/2024 01/29/2025
Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 01/29/2024 06/01/2024
DEQ | Drinking Water
Run Date: 01/29/2024 16:29:37 | Rating: UTAH03125 USU FORESTRY FIELD CAMP SPRING page 3 of 5
IPS 2020 Report
IPS Report
IPS Summary Total IPS Pts: 0
Admin & Physical Facilities Quality & Monitoring Significant Deficiency
0 0 0
DEQ | Drinking Water
Run Date: 01/29/2024 16:29:37 | Rating: UTAH03125 USU FORESTRY FIELD CAMP SPRING page 4 of 5
Physical Facility Points 2020 Total Pts: 0
Facility Facility Name Status Points Effective
DS001 UTAH03125 DISTRIBUTION SYSTEM A 0.0
Code Description Severity Comments Determined Date Not
Assessed Assessed
G001 UNAPPROVED
FACILITY IN SERVICE
SIG SYSTEM MUST OBTAIN
AFTER THE FACT
OPERATING PERMITS FOR
ALL WATER SYSTEM
FACILITIES BY 7/24/2025
01/29/2024 50 0
WS001 LITTLE BEAR SPRING A 0.0
Code Description Severity Comments Determined Date Not
Assessed Assessed
SP06 NEW WATER SOURCE
LACKS APPROVED
PER
SIG A Preliminary Evaluation
Report (PER) and full
Drinking Water Source
Protection (DWSP) plan is
required by 7/24/2024
01/29/2024 50 0
S001 UNAPPROVED
SOURCE IN SERVICE
SIG SYSTEM MUST OBTAIN
AFTER THE FACT
OPERATING PERMIT BY
7/24/2025
01/29/2024 200 0
Operator Certification
Type Level Required Highest Certificate
Distribution
Treatment
Open Compliance Schedule
Type Required Activities Severity Created Due
Revised Total Coliform Rule SEASONAL STARTUP PROCEDURES 01/01/2024 06/01/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 01/29/2024 07/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 01/29/2024 07/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
GWR CORRECT DEFICIENCY 120 DAYS SIG 01/29/2024 07/24/2024
WELCOME TO THE CLUB LETTER
SCHEDULE
CAPACITY DEVELOPMENT EVALUATION 01/29/2024 07/24/2025
WELCOME TO THE CLUB LETTER
SCHEDULE
ONSITE INSPECTION/SANITARY SURVEY 01/29/2024 01/29/2025
Revised Total Coliform Rule SAMPLING SITE PLAN SUBMITTAL 01/29/2024 06/01/2024
DEQ | Drinking Water
Run Date: 01/29/2024 16:29:37 | Rating: UTAH03125 USU FORESTRY FIELD CAMP SPRING page 5 of 5