TANK OWNERSHIP
Name US AIR FORCE HILL AIR FORCE BASE
Address 7290 WEINER STREET Bldg 383
HILL AIR FORCE BASE, UT 84056
Contact US AIR FORCE HILL AIR FORCE BASE
Phone
Email None
TANK LOCATION
Name U.S. AIR FORCE HILL A.F.B.
Address 7290 WEINER STREET Bldg 383
HILL AIR FORCE BASE, UT 84056
A Operator RANDY JUDD
Phone (801) 777-5041
B Operator John McLaughlin
Phone (801) 586-2011
Facility ID: 3000212 Inspection Date: 09/09/2024
DISPENSER DETAILS
DISP
ID/ALT
ID
SUBSTANCE UDC PIPE FLEX LOC
INSTALL
DATE
UDC
INSTALL
DATE
FIRE
VALVE
SAT
PRESENT
UDC
TEST
DISP
FLEX
CP
TEST
1 - 56-
1/2
Jet Fuel No Booted Steel Flex July 25,
1991
None Yes No None None
2 - 56-
3/4
Jet Fuel No Booted Steel Flex July 25,
1991
None Yes No None None
3 - 56-
5/6
Jet Fuel No Booted Steel Flex July 25,
1991
None Yes No None None
TANK DETAILS
Tank ID/Alt ID 24 / 11537-1
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc March 1, 1995 / 2000 / Single
Substance
Stored Diesel /
Tank Material-
Mod
Galvanic Cathodic Protection
(STIP3)-Double-Walled
ATG Veeder Root / TLS-350 CSLD No
Manifold
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Gravity Feed / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel Det TankATG PipeLDDeferred
CP Tank Test Aug. 6, 2021
CP Pipe Test None
Tank ID/Alt ID 26 / 11539-1
E-Gen/AST Yes / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc March 1, 1995 / 1000 / Single
Substance
Stored Diesel /
Tank Material-
Mod
Impressed Current Cathodic
Protection-Double-Walled
ATG Veeder Root / TLS-4
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Gravity Feed / No
STP Flex
Connectors
LLD Model
Spill/Overfill/Sm
Delivery
5 gal. Spill Bucket / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel Det TankATG PipeLDDeferred
CP Tank Test Aug. 6, 2021
CP Pipe Test None
2024-09-10 Page 1 of 11
Tank ID/Alt ID 98 / 228-3
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 1, 1991 / 25000 / South
Substance
Stored Jet Fuel /
Tank Material-
Mod
Impressed Current Cathodic
Protection-Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Bare Steel / Secondary
Containment
Pipe type/STP
Cont Gravity Feed / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model
Spill/Overfill/Sm
Delivery
Dry Connect Fitting / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeLineTightness /
PipeLineTightness
CP Tank Test Aug. 6, 2021
CP Pipe Test None
Tank ID/Alt ID 99 / 228-4
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc Nov. 1, 1991 / 25000 / North
Substance
Stored Jet Fuel /
Tank Material-
Mod
Impressed Current Cathodic
Protection-Double-Walled
ATG Veeder Root / TLS-350
Interstitial Monitor
LTT Test March 22, 2024
LLD Test March 22, 2024
Pipe Material-
Mod
Bare Steel / Secondary
Containment
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Vaporless 99 LD-3000
Spill/Overfill/Sm
Delivery
Dry Connect Fitting / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test Aug. 6, 2021
CP Pipe Test None
Tank ID/Alt ID 185 / 56-5
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Temporarily Out of Use
Installed/Cap/Loc July 25, 1991 / 3000 / North
Substance
Stored Jet Fuel /
Tank Material-
Mod
Galvanic Cathodic Protection
(STIP3)-Double-Walled
ATG Veeder Root / TLS-300
Interstitial Monitor
LTT Test None
LLD Test None
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1V
Spill/Overfill/Sm
Delivery
Dry Connect Fitting / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankATG
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test Aug. 6, 2021
CP Pipe Test None
2024-09-10 Page 2 of 11
Tank ID/Alt ID 186 / 56-6
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc July 25, 1991 / 3000 / Center
Substance
Stored Jet Fuel /
Tank Material-
Mod
Galvanic Cathodic Protection
(STIP3)-Double-Walled
ATG Veeder Root / TLS-300
Interstitial Monitor
LTT Test March 22, 2024
LLD Test March 22, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
Dry Connect Fitting / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test Aug. 6, 2021
CP Pipe Test None
Tank ID/Alt ID 187 / 56-7
E-Gen/AST No / No
Siphon/Compart No / No
Tank Status Currently In Use
Installed/Cap/Loc July 25, 1991 / 12000 / South
Substance
Stored Jet Fuel /
Tank Material-
Mod
Galvanic Cathodic Protection
(STIP3)-Double-Walled
ATG Veeder Root / TLS-300
Interstitial Monitor
LTT Test March 22, 2024
LLD Test March 22, 2024
Pipe Material-
Mod
Fiberglass Reinforced Plastic /
Double-Walled
Pipe type/STP
Cont Pressurized / Yes
STP Flex
Connectors Steel Flex in Sump
LLD Model Red Jacket / VR FX1DV
Spill/Overfill/Sm
Delivery
Dry Connect Fitting / Overfill
alarm / No
PST Fund/Other
Type No / Exempt
Tank/Pipe Rel
Det
TankInterstitialDblWalled
PipeAutoLineLeakDetection /
PipeLineTightness
CP Tank Test Aug. 6, 2021
CP Pipe Test None
INSPECTION COMMENTS
None
2024-09-10 Page 3 of 11
FACILITY RESPONSES
The above accurately represents the
facility's release detection records Yes
Operator Training
A Operator current?Yes
B Operator current?Yes
Monthly checklist available and
complete?Yes
Is the site unmanned?Yes
Is a sign posted in a conspicuous area
giving the name and telephone number
of a person in case of an emergency
and if the station is manned part of the
time, are C operators trained?
Yes
Does the site have emergency shutoff
device?Yes
Cathodic Protection
Impressed current system is checked
for proper operations at least every 60
days and the results of the last three
checks are available?
Yes
The results of the last two cathodic
protection tests are available (within six
months of installation and every three
years thereafter)?
No
Financial Responsibility
Financial responsibility method is ok?Yes
TANK RESPONSES
Tank 11537-1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
Tank is exempt from this requirement?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 11537-1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
No
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 11539-1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 11537-1 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Tank 11537-1 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 11537-1 ATG/IM
Does the ATG system have a valid
annual test?Yes
2024-09-10 Page 4 of 11
Tank 11539-1 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 11539-1 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 228-3 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 228-3 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 228-4 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 11539-1 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 11539-1 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
No
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 228-3 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 228-3 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 228-3 ATG/IM
Does the ATG system have a valid
annual test?Yes
2024-09-10 Page 5 of 11
Tank 228-4 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 228-4 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 56-5 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 56-5 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 56-5 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 56-6 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 56-6 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 228-4 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
Tank 228-4 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 228-4 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 56-5 Temporary Closure
Is release detection being maintained
or is the depth of product less than 1
inch?
Yes
What is the depth of product? (Inches)<1
The cathodic protection system being
maintained?Yes
The tanks are locked and secured?Yes
2024-09-10 Page 6 of 11
Tank 56-6 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 56-7 Cathodic Protection
Tanks are protected from corrosion?Yes
Piping is protected from corrosion?Yes
Flex connectors at the tank sub-pumps
are protected from corrosion?Yes
Containment sumps are sealed, free
from water, product, etc?Yes
Tank 56-7 Pressure Piping Leak Detection
Does the pressurized piping system
have a line leak detector?Yes
Does the pressurized piping system
have a valid line leak detector test?Yes
Does the pressurized piping system
have a valid annual line tightness test
or valid monthly monitoring?
Yes
Tank 56-7 Spill/Overfill
Does the spill bucket have a valid 3-
year test, valid monthly monitoring for
DW buckets, or the tank is exempt?
Yes
Does the overfill device have a valid 3-
year test or the tank is exempt?Yes
Tank 56-5 ATG/IM
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
ATG - The tank was filled to at least the
minimum level required to ensure a
valid leak test, and the tank size is
within the allowed upper and lower size
limits?
Yes
Tank 56-5 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 56-6 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
2024-09-10 Page 7 of 11
Tank 56-6 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 56-6 ATG/IM
Does the ATG system have a valid
annual test?Yes
Tank 56-7 Spill/Overfill
Tank has a spill prevention device?Yes
Are you able to visually inspect the spill
containment bucket(s) for functionality?
(i.e. are the buckets clean enough to
see cracks, etc?)
Yes
Is the spill containment bucket intact?Yes
Is the spill containment bucket(s) able
to contain a spill? (i.e. is there water,
product, debris, etc in the spill bucket
to prevent it from containing a spill?)
Yes
Tank has an overfill device?Yes
If an overfill alarm is being used is it
properly located so the delivery driver
can hear or see it, and is clearly
identified?
Yes
2024-09-10 Page 8 of 11
Tank 56-7 ATG/IM
IM - Type of Documentation Used?ATG
IM - System capable of detecting a
release of regulated substances from
any portion of the primary tank/piping
within one month of release?
Yes
ATG/IM - Records on site document that
the system is properly installed,
calibrated, operated, and maintained
(system and tank setup reports,
maintenance records)? Written
documentation of calibration,
maintenance, and repair is kept for at
least one year after work is completed?
Yes
ATG/IM - ATG console or other
equipment used to take readings and
perform tests is adequate, accessible,
and operational?
Yes
ATG/IM - Documentation of valid testing
or monitoring is available (must have
records for the two most recent months
and 10 of last 12 months)? Show results
in the RD tab.
Yes
Tank 56-7 ATG/IM
Does the ATG system have a valid
annual test?Yes
DISPENSER RESPONSES
Dispenser 56-3/4
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 56-1/2
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
Dispenser 56-5/6
Flex connectors at the dispensers are
protected from corrosion?Yes
Fire valve is anchored properly?Yes
Does the line tightness test port on the
fire valve have the manufacturers plug
installed in it? (no ball valves)
Yes
Is the fire valve located properly below
grade?Yes
Is the fire valve's fuseable link intact?Yes
2024-09-10 Page 9 of 11
MONTHLY LEAK DETECTION MONITORING
Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24
Tank 24 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 26 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 98 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank 99 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank
185 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank
186 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
Tank
187 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass
Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl
NON-COMPLIANCE ITEMS
TANK 11537-1
No Photos
Question:Does the spill bucket have a valid 3-year test, valid monthly monitoring for DW buckets, or the tank is
exempt?
Comments:None
TANK 11539-1
No Photos
Question:Does the spill bucket have a valid 3-year test, valid monthly monitoring for DW buckets, or the tank is
exempt?
Comments:None
FACILITY
No Photos
Question:The results of the last two cathodic protection tests are available (within six months of installation
and every three years thereafter)?
Comments:None
2024-09-10 Page 10 of 11
Prepared by fueloperator.com
Inspection Information
Inspector:Harris, Gary
Record Created:Sept. 10, 2024, 7:58
a.m.
Inspection
Date:Sept. 9, 2024