HomeMy WebLinkAboutDERR-2024-010636Utah Department of Environmental Quality - UST Release Detection TANK OWNERSHIP Name US AIR FORCE HILL AIR FORCE BASE Address 7290 WEINER STREET Bldg 383 HILL AIR FORCE BASE, UT 84056 Contact US AIR FORCE HILL AIR FORCE BASE Phone Email None TANK LOCATION Name U.S. AIR FORCE HILL A.F.B. Address 7290 WEINER STREET Bldg 383 HILL AIR FORCE BASE, UT 84056 A Operator RANDY JUDD Phone (801) 777-5041 B Operator John McLaughlin Phone (801) 586-2011 Facility ID: 3000212 Inspection Date: 09/09/2024 DISPENSER DETAILS DISP ID/ALT ID SUBSTANCE UDC PIPE FLEX LOC INSTALL DATE UDC INSTALL DATE FIRE VALVE SAT PRESENT UDC TEST DISP FLEX CP TEST 1 - 56- 1/2 Jet Fuel No Booted Steel Flex July 25, 1991 None Yes No None None 2 - 56- 3/4 Jet Fuel No Booted Steel Flex July 25, 1991 None Yes No None None 3 - 56- 5/6 Jet Fuel No Booted Steel Flex July 25, 1991 None Yes No None None TANK DETAILS Tank ID/Alt ID 24 / 11537-1 E-Gen/AST Yes / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc March 1, 1995 / 2000 / Single Substance Stored Diesel / Tank Material- Mod Galvanic Cathodic Protection (STIP3)-Double-Walled ATG Veeder Root / TLS-350 CSLD No Manifold LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Gravity Feed / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankATG PipeLDDeferred CP Tank Test Aug. 6, 2021 CP Pipe Test None Tank ID/Alt ID 26 / 11539-1 E-Gen/AST Yes / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc March 1, 1995 / 1000 / Single Substance Stored Diesel / Tank Material- Mod Impressed Current Cathodic Protection-Double-Walled ATG Veeder Root / TLS-4 LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Gravity Feed / No STP Flex Connectors LLD Model Spill/Overfill/Sm Delivery 5 gal. Spill Bucket / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankATG PipeLDDeferred CP Tank Test Aug. 6, 2021 CP Pipe Test None 2024-09-10 Page 1 of 11 Tank ID/Alt ID 98 / 228-3 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Nov. 1, 1991 / 25000 / South Substance Stored Jet Fuel / Tank Material- Mod Impressed Current Cathodic Protection-Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test None LLD Test None Pipe Material- Mod Bare Steel / Secondary Containment Pipe type/STP Cont Gravity Feed / Yes STP Flex Connectors Steel Flex in Sump LLD Model Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankInterstitialDblWalled PipeLineTightness / PipeLineTightness CP Tank Test Aug. 6, 2021 CP Pipe Test None Tank ID/Alt ID 99 / 228-4 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc Nov. 1, 1991 / 25000 / North Substance Stored Jet Fuel / Tank Material- Mod Impressed Current Cathodic Protection-Double-Walled ATG Veeder Root / TLS-350 Interstitial Monitor LTT Test March 22, 2024 LLD Test March 22, 2024 Pipe Material- Mod Bare Steel / Secondary Containment Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Vaporless 99 LD-3000 Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 6, 2021 CP Pipe Test None Tank ID/Alt ID 185 / 56-5 E-Gen/AST No / No Siphon/Compart No / No Tank Status Temporarily Out of Use Installed/Cap/Loc July 25, 1991 / 3000 / North Substance Stored Jet Fuel / Tank Material- Mod Galvanic Cathodic Protection (STIP3)-Double-Walled ATG Veeder Root / TLS-300 Interstitial Monitor LTT Test None LLD Test None Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1V Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankATG PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 6, 2021 CP Pipe Test None 2024-09-10 Page 2 of 11 Tank ID/Alt ID 186 / 56-6 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 25, 1991 / 3000 / Center Substance Stored Jet Fuel / Tank Material- Mod Galvanic Cathodic Protection (STIP3)-Double-Walled ATG Veeder Root / TLS-300 Interstitial Monitor LTT Test March 22, 2024 LLD Test March 22, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 6, 2021 CP Pipe Test None Tank ID/Alt ID 187 / 56-7 E-Gen/AST No / No Siphon/Compart No / No Tank Status Currently In Use Installed/Cap/Loc July 25, 1991 / 12000 / South Substance Stored Jet Fuel / Tank Material- Mod Galvanic Cathodic Protection (STIP3)-Double-Walled ATG Veeder Root / TLS-300 Interstitial Monitor LTT Test March 22, 2024 LLD Test March 22, 2024 Pipe Material- Mod Fiberglass Reinforced Plastic / Double-Walled Pipe type/STP Cont Pressurized / Yes STP Flex Connectors Steel Flex in Sump LLD Model Red Jacket / VR FX1DV Spill/Overfill/Sm Delivery Dry Connect Fitting / Overfill alarm / No PST Fund/Other Type No / Exempt Tank/Pipe Rel Det TankInterstitialDblWalled PipeAutoLineLeakDetection / PipeLineTightness CP Tank Test Aug. 6, 2021 CP Pipe Test None INSPECTION COMMENTS None 2024-09-10 Page 3 of 11 FACILITY RESPONSES The above accurately represents the facility's release detection records Yes Operator Training A Operator current?Yes B Operator current?Yes Monthly checklist available and complete?Yes Is the site unmanned?Yes Is a sign posted in a conspicuous area giving the name and telephone number of a person in case of an emergency and if the station is manned part of the time, are C operators trained? Yes Does the site have emergency shutoff device?Yes Cathodic Protection Impressed current system is checked for proper operations at least every 60 days and the results of the last three checks are available? Yes The results of the last two cathodic protection tests are available (within six months of installation and every three years thereafter)? No Financial Responsibility Financial responsibility method is ok?Yes TANK RESPONSES Tank 11537-1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes Tank is exempt from this requirement?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 11537-1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? No Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 11539-1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Tank 11537-1 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Tank 11537-1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 11537-1 ATG/IM Does the ATG system have a valid annual test?Yes 2024-09-10 Page 4 of 11 Tank 11539-1 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 11539-1 ATG/IM Does the ATG system have a valid annual test?Yes Tank 228-3 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 228-3 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 228-4 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 11539-1 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 11539-1 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? No Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 228-3 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 228-3 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 228-3 ATG/IM Does the ATG system have a valid annual test?Yes 2024-09-10 Page 5 of 11 Tank 228-4 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 228-4 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 56-5 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 56-5 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 56-5 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 56-6 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 56-6 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 228-4 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes Tank 228-4 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 228-4 ATG/IM Does the ATG system have a valid annual test?Yes Tank 56-5 Temporary Closure Is release detection being maintained or is the depth of product less than 1 inch? Yes What is the depth of product? (Inches)<1 The cathodic protection system being maintained?Yes The tanks are locked and secured?Yes 2024-09-10 Page 6 of 11 Tank 56-6 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 56-7 Cathodic Protection Tanks are protected from corrosion?Yes Piping is protected from corrosion?Yes Flex connectors at the tank sub-pumps are protected from corrosion?Yes Containment sumps are sealed, free from water, product, etc?Yes Tank 56-7 Pressure Piping Leak Detection Does the pressurized piping system have a line leak detector?Yes Does the pressurized piping system have a valid line leak detector test?Yes Does the pressurized piping system have a valid annual line tightness test or valid monthly monitoring? Yes Tank 56-7 Spill/Overfill Does the spill bucket have a valid 3- year test, valid monthly monitoring for DW buckets, or the tank is exempt? Yes Does the overfill device have a valid 3- year test or the tank is exempt?Yes Tank 56-5 ATG/IM ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes ATG - The tank was filled to at least the minimum level required to ensure a valid leak test, and the tank size is within the allowed upper and lower size limits? Yes Tank 56-5 ATG/IM Does the ATG system have a valid annual test?Yes Tank 56-6 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes 2024-09-10 Page 7 of 11 Tank 56-6 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 56-6 ATG/IM Does the ATG system have a valid annual test?Yes Tank 56-7 Spill/Overfill Tank has a spill prevention device?Yes Are you able to visually inspect the spill containment bucket(s) for functionality? (i.e. are the buckets clean enough to see cracks, etc?) Yes Is the spill containment bucket intact?Yes Is the spill containment bucket(s) able to contain a spill? (i.e. is there water, product, debris, etc in the spill bucket to prevent it from containing a spill?) Yes Tank has an overfill device?Yes If an overfill alarm is being used is it properly located so the delivery driver can hear or see it, and is clearly identified? Yes 2024-09-10 Page 8 of 11 Tank 56-7 ATG/IM IM - Type of Documentation Used?ATG IM - System capable of detecting a release of regulated substances from any portion of the primary tank/piping within one month of release? Yes ATG/IM - Records on site document that the system is properly installed, calibrated, operated, and maintained (system and tank setup reports, maintenance records)? Written documentation of calibration, maintenance, and repair is kept for at least one year after work is completed? Yes ATG/IM - ATG console or other equipment used to take readings and perform tests is adequate, accessible, and operational? Yes ATG/IM - Documentation of valid testing or monitoring is available (must have records for the two most recent months and 10 of last 12 months)? Show results in the RD tab. Yes Tank 56-7 ATG/IM Does the ATG system have a valid annual test?Yes DISPENSER RESPONSES Dispenser 56-3/4 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 56-1/2 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes Dispenser 56-5/6 Flex connectors at the dispensers are protected from corrosion?Yes Fire valve is anchored properly?Yes Does the line tightness test port on the fire valve have the manufacturers plug installed in it? (no ball valves) Yes Is the fire valve located properly below grade?Yes Is the fire valve's fuseable link intact?Yes 2024-09-10 Page 9 of 11 MONTHLY LEAK DETECTION MONITORING Sep '23 Oct '23 Nov '23 Dec '23 Jan '24 Feb '24 Mar '24 Apr '24 May '24 Jun '24 Jul '24 Aug '24 Tank 24 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 26 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 98 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 99 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 185 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 186 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Tank 187 Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Pass Line Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl Not Appl NON-COMPLIANCE ITEMS TANK 11537-1 No Photos Question:Does the spill bucket have a valid 3-year test, valid monthly monitoring for DW buckets, or the tank is exempt? Comments:None TANK 11539-1 No Photos Question:Does the spill bucket have a valid 3-year test, valid monthly monitoring for DW buckets, or the tank is exempt? Comments:None FACILITY No Photos Question:The results of the last two cathodic protection tests are available (within six months of installation and every three years thereafter)? Comments:None 2024-09-10 Page 10 of 11 Prepared by fueloperator.com Inspection Information Inspector:Harris, Gary Record Created:Sept. 10, 2024, 7:58 a.m. Inspection Date:Sept. 9, 2024 2024-09-10 Page 11 of 11