PWS Number:UTAH08043 Deficiency Points:145 Survey Date:09/03/2024
Survey Name:TRAIL CYN RESIDENTS
ASSN
Surveyor:Curtis Page
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Management and Operations | DS001 | UTAH08043 DISTRIBUTION SYSTEM
22. For a community water system with water sources that require power to produce sufficient flow, system is equipped with standby power
option.
Rule: R309-515-6(2)(a)Rule requires a community water system without naturally flowing water sources, such
as springs or flowing wells, to have one or more of the system's sources equipped for
operation during power outages. To ensure continuous service when the primary power
has been interrupted, a redundant power supply is required. A redundant power
supply may include a transfer switch for auxiliary power such as a generator or a
power supply service with coverage from two independent substations. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Notes:There is only one power source for the pump house.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: S033 COM SYSTEM WITHOUT NATURALLY FLOWING SOURCES LACKS BACKUP
POWER FOR AT LEAST ONE WATER SOURCE
Sanitary Survey Category: SM
SDWIS Severity Code: Minor Deficiency
Cross Connection and Operator Certification | DS001 | UTAH08043 DISTRIBUTION SYSTEM
36. Does the water system have records of on-going enforcement activities? (test history, enforcement activities, hazard assessments)
Rule: R309-105-12(2)Rule requires each public water system to have a cross connection control program
that includes test history and documentation of on-going enforcement activities.
Notes:No records for Cross Connection Control have been kept.
Deficiency Points: 15
Days until points become effective on IPS: 0
SDWIS Deficiency Description: M007 CCC-LACKS ON-GOING ENFORCEMENT IMPLEMENTATION
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | LOWER WATER MINE TUNNEL SPRING
56A. Overflow screened with #4 mesh screen
Rule: R309-515-7(7)(d), R309-545-13(3)Overflow pipes on junction and collection boxes shall comply with R309-545 and be
screened with No. 4 mesh non-corrodible screens. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
Notes:Overflow screened with #14 mesh that is holding debris in drain line. Remove mesh, flush
line and install #4 mesh.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS04 SPRING BOX OVERFLOW LACKS NO. 4 SCREEN
Sanitary Survey Category: SO
SDWIS Severity Code: Significant Deficiency
Springs | WS001 | LOWER WATER MINE TUNNEL SPRING
62B. Spring box lid is gasketed
Rule: R309-515-7(7)(d), R309-545-14 (2)Access openings shall comply with R309-545 and be provided with a cover furnished
with a gasket between the lid and frame. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
Notes:Gasket is in need of repair/replacement.
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: SS10 SPRING BOX LID LACKS A GASKET
Sanitary Survey Category: SO
SDWIS Severity Code: Minor Deficiency
Springs | WS001 | LOWER WATER MINE TUNNEL SPRING
64. Spring has a permanent flow-measuring device.
Rule: R309-515-7(7)(h)Rule requires a spring to have a permanent flow measuring device.
Notes:Still no permanent device for measuring spring flow.
Deficiency Points: 5
Days until points become effective on IPS: 0
SDWIS Deficiency Description: SS01 LACKS A PERMANENT DEVICE FOR MEASURING SPRING FLOW
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST002 | NORTH TANK
99C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:Gasket needs repair/replacement
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME
Sanitary Survey Category: FW
SDWIS Severity Code: Significant Deficiency
Storage Tanks | ST003 | SOUTH TANK
113C. Access opening lid properly gasketed
Rule: R309-545-14(2)Rule requires the access opening to a tank to be furnished with a gasket between the lid
and frame. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
Notes:Gasket needs repair/replacement
Deficiency Points: 25
Days until points become effective on IPS: 120
SDWIS Deficiency Description: V009 STORAGE TANK LID LACKS A FUNCTIONING GASKET BETWEEN THE LID AND
FRAME