Loading...
HomeMy WebLinkAboutDERR-2024-010585 WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 AUTOMATIC TANK GAUGE OPERATION INSPECTION Facility Name: Don Stockley Trucking Owner: Don Stockley Trucking Address: 3995 South 300 West Address: 3995 South 300 West City, State, Zip: Salt Lake City, Utah 84107 City, State, Zip: Salt Lake City, Utah 84107 Facility I.D.#: 4001433 Phone #: 801-265-2220 Testing Company: Westech Phone #: 801-266-2545 Date: 8/14/24 This procedure is to determine whether the automatic tank gauge (ATG) is operating properly. See PEI/RP1200 Section 8.2 for the inspection procedure. This procedure is applicable to tank monitor stems that touch the bottom of the tank when in place. Tank Number 1 Product Stored DSL ATG Brand and Model TLS 300 1. Tank Volume, gallons 9,932 2. Tank Diameter, inches 96 3. After removing the ATG from the tank, it has been inspected and any damaged or missing parts replaced? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Float moves freely on the stem without binding? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 5. Fuel float level agree with the value programmed into the console? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 6. Water float level agree with the value programmed into the console? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 7. Inch level from the bottom of the stem when 90% alarm is triggered? 81 8. Inch level at which the overfill alarm activates corresponds with the value programmed in the gauge? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 9. Inch level from the bottom when the water float first triggers an alarm? 2 10. Inch level at which the water float alarm activates corresponds with the value programmed in the gauge? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No If any answers in Lines 3, 4, 5, or 6 are "No" the system has failed the test. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 SPILL BUCKET INTEGRITY TESTING HYDROSTATIC TEST METHOD SINGLE- AND DOUBLE-WALLED VACUUM TEST METHOD Facility Name: Don Stockley Trucking Owner: Don Stockley Trucking Address: 3995 South 300 West Address: 3995 South 300 West City, State, Zip: Salt Lake City, Utah 84107 City, State, Zip: Salt Lake City, Utah 84107 Facility I.D.#: 4001433 Phone #: 801-265-2220 Testing Company: Westech Phone #: 801-266-2545 Date: 8/14/24 This procedure is to test the leak integrity of single- and double-walled spill buckets. See PEI/RP1200 Section 6.2 for hydrostatic test method, Section 6.3 for single-walled vacuum test method and Section 6.4 for double-walled vacuum test method. Tank Number 1 Product Stored DSL Spill Bucket Capacity 5-Gallon Manufacturer EBW Construction ☒Double-walled ☐Single-walled ☐Double-walled ☐Single-walled ☐Double-walled ☐Single-walled ☐Double-walled ☐Single-walled Test Type ☐Hydrostatic ☒Vacuum ☒Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled ☐Hydrostatic ☐Vacuum ☐Double-walled ☐Single-walled Spill Bucket Type ☒Product ☐Vapor ☐Product ☐Vapor ☐Product ☐Vapor ☐Product ☐Vapor Liquid and debris remove from spill bucket?* ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Visual Inspection (no cracks, loose parts or separation of the bucket from the fill pipe.) ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No Tank Riser cap included in test? ☐Yes ☐No ☒NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA Drain valve included in test? ☐Yes ☐No ☒NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA ☐Yes ☐No ☐NA Starting Level 15” WC Test Start Time 10:40 Ending Level 14” WC Test End Time 10:45 Test Period 5-Minute Level Change -1” Pass/fail criteria: Must pass visual inspection. Hydrostatic: Water level drop of less than 1/8 inch; Vacuum single-walled only: Maintain at least 26 inches water column; Vacuum double-walled: maintain at least 12 inches water column. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: *All liquids and debris must be disposed of properly Tester’s Name Taber DeHart, UT-0394 Tester’s Signature WESTECH EQUIPMENT 195 WEST 3900 SOUTH • P.O. BOX 57307 • SALT LAKE CITY, UTAH 84157-0307 801-266-2545 • TOLL FREE 800-433-8831 • 24 HOUR FAX 801-261-4054 UST OVERFILL EQUIPMENT INSPECTION AUTOMATIC SHUTOFF DEVICE AND BALL FLOAT VALVE Facility Name: Don Stockley Trucking Owner: Don Stockley Trucking Address: 3995 South 300 West Address: 3995 South 300 West City, State, Zip: Salt Lake City, Utah 84107 City, State, Zip: Salt Lake City, Utah 84107 Facility I.D.#: 4001433 Phone #: 801-265-2220 Testing Company: Westech Phone #: 801-266-2545 Date: 8/14/24 This data sheet is for inspecting automatic shutoff devices and ball float valve. See PEI/RP1200 Section 7 for inspection procedures. Product Grade DSL Tank Number 1 Tank Volume, gallons 9,932 Tank Diameter, inches 96 Overfill Prevention Device Brand Franklin Type ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve ☐ Automatic Shutoff Device ☐ Ball Float Valve AUTOMATIC SHUTOFF DEVICE INSPECTION 1. Drop tube removed from tank? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Drop tube and float mechanisms free of debris? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Float moves freely without binding and poppet moves into flow path? ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Bypass valve in the drop tube open and free of blockage (if present)? ☐Yes ☐No ☒Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present ☐Yes ☐No ☐Not Present 5. Flapper adjusted to shut off flow at 95% capacity? * ☒Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. BALL FLOAT VALVE INSPECTION** 1. Tank top fitting vapor-tight and leak free? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 2. Ball float cage free of debris? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 3. Ball free of holes and cracks and moves freely in cage? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 4. Vent hole in pipe open and near top of tank? ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No 5. Ball float pipe proper length to restrict flow to 90% capacity? *** ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No ☐Yes ☐No A "No" to any item in Lines 1-5 indicates a test failure. Test Results ☒Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail ☐Pass ☐Fail Comments: *Use manufacturer’s suggested procedure for determining if automatic shutoff device will shut off flow at 95% capacity. **If a ball float valve is found to fail the inspection, another method of overfill must be used. ***Use manufacturer’s suggested procedure for determining if flow restriction device will restrict flow at 90% capacity. Tester’s Name Taber DeHart, UT-0394 Tester’s Signature