Loading...
HomeMy WebLinkAboutDDW-2024-010755 September 9, 2024 Cameron Phillips Payson City 439 West Utah Avenue Payson, Utah 84651 Subject:Operating Permit, Payson City Pipeline Upsizing (DS001); Payson City, System #25021, File #13514 Dear Cameron Phillips:The Division of Drinking Water (the Division) received a request for an Operating Permit for Payson City Pipeline Upsizing project from you on September 5, 2024. The Division issued Plan Approval for this project on September 25, 2023. Our understanding of the project is that the Payson City Pipeline Upsizing Project consists of the installation of approximately 1,750 feet of 24-inch diameter pipe to upsize a storage tank transmission line and 1,550 feet of 12-inch diameter transmission pipe to convey water to lower pressure zones. The project includes the installation of a new pipeline with associated appurtenances in and near Payson Canyon and an adjacent subdivision. We have received the following information for the Payson City Pipeline Upsizing (DS001): Certification of Rule Conformance with plan approval conditions by a professional engineer. Satisfactory bacteriological results as evidence of proper disinfection and flushing. We have determined that all conditions for operating permit issuance have been met. On this basis, an Operating Permit for the Payson City Pipeline Upsizing (DS001) project is hereby issued as constituted by this letter. You may now place the water lines in service in your water system. Please maintain a copy of this letter with your permanent records for future reference. If you have any questions regarding this Operating Permit, please contact Chris Martin, P.E., of this office, at (385) 271-7040, or Michael Newberry, P.E., Permitting and Engineering Manager, at (385) 515-1464. Sincerely, Russell Seeley, P.E. Assistant Director CM/mrn/mdbcc:Daymon Swensen, Utah County Health Department, DaymonS@utahcounty.govBen Q. Coray, Sunrise Engineering, bcoray@sunrise-eng.comJaison Hardman, Sunrise Engineering, jhardman@sunrise-eng.comCameron Phillips, Payson City, cameronp@payson.orgTravis Jockumsen, Payson City, travisj@payson.orgChris Martin, P.E., Division of Drinking Water, cmartin@utah.govJen Yee, Division of Drinking Water, jyee@utah.gov CMartin 25021 13514 OP - Pipeline Upsizing Project