HomeMy WebLinkAboutDERR-2024-0084586952 South High Tech Drive, Suite B
Midvale, UT 84047
P (801) 545-8500
Terracon.com
June 25, 2024
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
195 North 1950 West
P.O. Box 144840
Salt Lake City, Utah 84114-4840
Attn: Ms. Eileen Brennan
P: (801) 536-4100
E:ebrennan@utah.gov
Re: Work Plan JDI-12-TER
Work Plan and Price for Securing Access and Conducting One Groundwater
Monitoring Event with Reporting
Beehive Credit Union
2205 East 2100 South, Salt Lake City, Utah
Facility ID: 4002050, Release ID: JDI
Terracon Project No. AL137352
Dear Ms. Brennan:
Terracon is pleased to provide this Work Plan and Price for the Beehive Credit Union facility
in Salt Lake City, Utah. This Work Plan was requested by the Utah Department of
Environmental Quality (UDEQ), Division of Environmental Response and Remediation (DERR),
under Contract #216383, Work Assignment JDI-12-TER. The objective of this Work Plan is to
secure permission to access the site wells, conduct one round of monitoring and sampling of
all available monitoring wells, and submit a report documenting the monitoring event.
Sincerely,
Terracon Consultants, Inc.
Stephen Maliszeski Craig D. Eaton
Utah UST Sampler #1832 Authorized Project Reviewer
Utah UST Consultant #CC167
Attachments: Exhibit 1 – Site Plan
2024 Cost Estimate Spreadsheet
Work Plan JDI-12-TER
JDI-12-TER (Facility ID 4002050 / Release ID JDI) | Salt Lake City, Utah
June 25, 2024 | Terracon Project No. AL137352
1
WORK PLAN TASKS
Task 1: Site Access and Preliminaries
Task 1 is to secure permission to access the on-site and off-site site wells once this Work Plan
is approved. It is anticipated site access can be acquired by calling or emailing the property
owners and that they will provide access and sign a DERR Grant of Access form without issue.
If the site owner, or occupant if different than the owner, resists site access, we will contact
you to discuss alternative actions that are beyond the scope of this Work Plan.
Subtotal for Task 1: .................................................................. $395.00
Task 2: Groundwater Monitoring and Sampling
Terracon utilized the Utah DEQ’s Interactive Map to confirm the most recent documents
associated with the former Beehive Credit Union property. According to the available records,
the most recent document is the Groundwater Monitoring Report dated December 17, 2019,
completed by Terracon Consultants, Inc.
The findings of the 2019 report identified that four on-site and one off-site monitoring wells
have historically been sampled for analysis of methyl tert-butyl ether, benzene, toluene,
ethylbenzene, total xylenes, and naphthalene (MBTEXN); total petroleum hydrocarbons in the
gasoline range (TPH-GRO); and total petroleum hydrocarbons in the diesel range utilizing
silica gel treatment (TPH-DRO with SGT). Additional monitoring wells were historically
installed at the site; however, they are assumed to no longer exist.
As far as Terracon is aware, these five monitoring wells remail viable for sampling (MW-1,
MW-2, MW-3, MW-B, and MW-D). The attached Exhibit 1, extracted from the 2019 report,
shows the locations of the monitoring wells. Terracon will use historical site maps to confirm
if other monitoring wells viable for sampling exist. If Terracon identifies such monitoring wells,
the DERR project manager will be contacted prior to sampling to get approval for the
additional scope of work and fee.
The groundwater monitoring event will include documenting depth to water, thickness of any
free product, if encountered, other observations, and collecting groundwater samples for
laboratory analyses from five groundwater monitoring wells. The samples will be collected by
a Utah-certified Soil & Groundwater Sampler following applicable DERR regulations and
guidance. The groundwater samples will be submitted under chain-of-custody protocols to
Chemtech Ford Analytical Laboratory for analysis of:
All five monitoring wells: MBTEXN, TPH-GRO, and TPH-DRO by EPA Method
8260/8015M;
Monitoring wells MW-B and MW-D:TPH fractionation by EPA Method 8270.
Subtotal for Task 2: ............................................................... $2,578.95
Work Plan JDI-12-TER
JDI-12-TER (Facility ID 4002050 / Release ID JDI) | Salt Lake City, Utah
June 25, 2024 | Terracon Project No. AL137352
2
Task 3: Project Documentation, Report, and PST
Claims Management
Upon completion of site activities and receipt of the laboratory analytical results, a draft
Groundwater Monitoring Report will be prepared and submitted to DERR that will include
the following.
Documentation of field activities
Site plan showing pertinent site features
Current and historical laboratory analytical laboratory results
Current and historical groundwater elevation data
A groundwater gradient map
Iso-concentration contour maps for TPH-DRO and TPH-GRO, the two constituents
where iso-concentration maps were prepared in the last sampling event
conducted in 2019.
Data evaluation and presentation of findings
A final Groundwater Monitoring Report will be generated and submitted following receipt
of comments or revisions requested by DERR on the draft report. For the purposes of this
budget, we have assumed that no significant changes will be requested.
Task 3 also includes time to generate the PST Fund invoices and coordination to complete the
invoice with the client and DERR.
Subtotal for Task 3: .............................................................. $2,481.00
Total: $5,454.95
The services in this Work Plan will be performed in a manner consistent with generally
accepted practices of the professional undertaken in similar studies in the same geographic
area during the same period. Terracon makes no warranties, expressed or implied,
regarding its services, findings, conclusions or recommendations. Please note that Terracon
does not warrant the work of laboratories, regulatory agencies or other third parties
supplying information used in the preparation of the report.
If PST Fund Labor rates are changed prior to work being completed, the Work Plan will be
updated to reflect the new rates.
Work Plan JDI-12-TER
JDI-12-TER (Facility ID 4002050 / Release ID JDI) | Salt Lake City, Utah
June 25, 2024 | Terracon Project No. AL137352
3
If conditions are identified that will substantially alter the proposed Scope of Work, Terracon
will notify DERR to discuss appropriate actions or modifications to this Work Plan. Terracon
will not exceed the estimated costs without prior approval from the DERR Project Manager.
ASSUMPTIONS
The following assumptions were made during preparation of this Work Plan and Price:
Terracon assumes that no on- or off-site access issues will be encountered. In
the event Terracon encounters difficulty with access to the site or adjoining
property, DERR will be contacted immediately to determine appropriate courses
of action.
Terracon assumes that a total of five monitoring well locations will be gauged and
sampled. If more or fewer well locations are accessible for sampling, DERR will
be contacted immediately to determine appropriate courses of action.
Terracon assumes that the monitoring wells proposed for sampling are in
adequate working condition with sufficient water column to allow sampling and
are not covered by asphalt or otherwise inaccessible.
For cost estimating purposes, Terracon assumes five groundwater samples will be
submitted to the analytical laboratory, one from each of the 5 wells.
If you have any questions or would like to make any modifications to the approach
described in this Work Plan and Price, please contact Steve Maliszeski at (801) 746-5454 or
Craig Eaton at (801) 746-5446.
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!
!!!
!
! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !! ! ! ! ! ! ! ! ! ! ! !!
!
!
!
!
!
!
!
!
!
!
!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!!!
!
! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! !
!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
!
@A
@A
@A
@A
@A
MW-B
MW-2
MW-D
MW-1
MW-3
Project No.:
Reviewed By:
Date:
Drawn By:
IMS
ABF
12/09/19
AL137352
\
\
p
6
1
w
f
s
0
1
\
d
a
t
a
\
G
I
S
\
A
L
1
3
7
3
5
2
_
D
E
R
R
_
U
T
\
M
a
p
s
\
2
0
1
9
_
1
1
_
G
r
o
u
n
d
w
a
t
e
r
\
A
L
1
3
7
3
5
2
_
E
x
h
i
b
i
t
2
_
S
i
t
e
L
a
y
o
u
t
S
a
m
p
l
e
d
W
e
l
l
s
.
m
x
d
6949 S. High Tech Dr, Suite 100 Midvale, Utah
PH. (801) 746 5464 terracon.com
0 20 4010
Feet
2100 South
22
0
0
E
a
s
t
Monitoring Wells
@A 1" Monitoring Well
@A 2" Monitoring Well
Utilities
! ! !Gas Line
! ! !Power Line
! ! !Sanitary Sewer Line
! ! !Water Line
Site Layout/Sampled Wells Exhibit
1
DERR
Former Beehive Credit Union
2205 East 2100 South
Salt Lake City, Utah
NOTES: This product is intended for informational purposes only and may not be suitable for legal, engineering, or surveying purposes.
DATA SOURCES: Aerial Photography provided by AGRC (2012 HRO).
PST Cost Estimate Spreadsheet
Project:Labor Catagories (2023 PST Fund Approved Rates)
Facility ID:0 P100 Principal $78 / hour
Release ID:1 P101 Senior Project Manager $62 / hour
Work Plan:2 P102 Pofessional Engineer/Geologist
Date:3 P103 Project Manager
4 P104 Field Scientist
5 P105 Senior Technician
6 P106 Field Technician
7 P107 Drafter
Hours By Labor Catagory
0 1 2 3 4 5 6 7 8 9 10
Task 1 - Site Access and Preliminaries
1.0 1.0 $100.00 $100.00
0.5 1.0 1.0 2.5 $295.00 $295.00
Subtotal $395.00 $0.00 $395.00
Task 2 - Groundwater Monitoring and Sampling
0.5 1.0 1.0 2.5 $295.00 $295.00
2.0 2.0 $202.00 $202.00
1.0 1.0 $101.00 $101.00
0.0 $0.00 $23.45 $23.45
6.0 6.0 $606.00 $606.00
0.0 $0.00 $55.00 $55.00
1.0 1.0 $118.00 $118.00
0.0 $0.00 $55.00 $55.00
0.0 $0.00 $25.00 $25.00
2.0 2.0 $202.00 $202.00
0.0 $0.00 $467.50 $467.50
0.0 $0.00 $429.00 $429.00
Subtotal $1,524.00 $1,054.95 $2,578.95
Task 3 - Project Documentation, Report, and PST Claims Management
1.0 10.0 4.0 4.0 1.5 20.5 $2,169.00 $2,169.00
0.25 1.0 2.0 3.25 $312.00 $312.00
Subtotal $2,481.00 $0.00 $2,481.00
TOTAL $4,400.00 $1,054.95 $5,454.95
Securing Access and Conducting One Groundwater Monitoring Event (5 locations) with Reporting
Project Management, report preparation, tables, exhibits and review
Travel Time (0.5 hours each way)
Mileage 35 miles @ 2024 GSA Personally Owned Vehicle Rate of $0.67/mile)
Fieldwork - Site walk to find historical well locations (1 hr) + sampling 5 wells (1 hr/2" well)
Sampling event coordination (scheduling, field staff coordination)
Chemtech Ford (TPH Fractionation) Method 8270 [2 GW @ $214.50/sample]
Data Reduction / Paperwork (1 hour per day)
Disposable weighted bailers (5 @ $11 ea)
Safety and project kick-off
Preliminaries (field supplies preparation, equipment gathering)
Sample preparation and delivery to laboratory
Chemtech Ford (MBTEXN/TPH-GRO/TPH-DRO) Method 8260/8015M [5 GW @ $93.50/sample]
Invoice review, reimbursement request
Site Access (1 hour of labor, but cost capped at not-to-exceed labor of $100)
$169 / hour
$152 / hour
$147 / hour
$118 / hour
$85 / hour
Sampling Supplies and Disposables (1 day @ $25/day)
Product / water interface probe (1 days @ $55/day)
Former Beehive CU
4002050
JDI
JDI-12-TER
6/25/2024
Total Costs
Total
Hours Total Labor ODCs
8 P108 PST Trust Fund Claim Specialist
Scope of Work:
Task Description
$101 / hour
9 P109 Administrative Assistant
10 P110 Technical Expert
$90 / hour
$73 / hour
Page 1 of 1