Re: Work Assignment FLU-16-ATC: Preparation of a Work Plan and Price for Securing
Access and Conducting One Groundwater Monitoring Event with Reporting
Grand Western Gas and Groceries, located at 575 South Main Street, Richfield, Utah
Facility Identification No. 2000288, Release Site FLU
Dear Mr. Coletta:
The Division of Environmental Response and Remediation (DERR) requests that Atlas
Technical Consultants, LLC complete the enclosed Work Assignment Number FLU-16-ATC, under
Contract #216364. The Work Assignment is to submit a work plan and price for ensuring access
and to conduct one groundwater monitoring event at the above-referenced site.
Enclosed is the original Work Assignment with tasks to be completed. Please sign and return
electronically to the DERR.
If you have any questions, please contact Eileen Brennan, the DERR project manager, at
(801) 536-4100.
Sincerely,
Morgan P. Atkinson, PST Branch Manager
Division of Environmental Response and Remediation
MPA/MEB/rr
cc: Thomas Kingston, Division of Environmental Response and Remediation
195 North 1950 West• Salt Lake City, UT
Mailing Address : P.O . Box 144840 • Salt Lake City, UT 84114-4840
Telephone (801) 536-4100 • Fax (801) 359-8853 • T.D.D . (801) 536-4284
www.deq.utah.g ov
Printed on 100% recycled paper
WORK ASSIGNMENT FLU-16-ATC
Contract#: 216364
Work Assignment: Preparation of a Work Plan and Price for Securing Access and
Conducting One Groundwater Monitoring Event with Reporting
Grand Western Gas and Groceries
Located at 575 South Main Street, Richfield, Utah
Facility Identification No. 2000288, Release Site FLU
The Consultant, Atlas Technical Consultants, LLC (Atlas), is requested to complete the following
Work Assignment:
I. WORK OBJECTIVE:
The work objective is to submit a work plan price to secure a new Grant of Access, if needed,
and to conduct one round of groundwater monitoring and sampling of the release wells, with
a report to follow. The work plan price should provide an estimate of costs for the
implementation of the work plan, itemized per task. Each stage of the work plan should be
identified as a specific task or sub-task. Work performed under each task or sub-task shall
not commence without prior approval from the Division of Environmental Response and
Remediation (DERR).
II. TASKS:
The DERR has identified the following tasks to be included in the work plan and price:
1. Secure permission to access the site wells. If necessary, have a DERR Grant of
Access signed & submitted to DERR for the project file.
2. Conduct one round of monitoring and sampling of all available monitoring wells.
This task includes documenting depth to water, thickness of any free product, and
other observations, and collecting samples for MBTEXN, GRO, and DRO by the
appropriate analytical methods. The groundwater sample with the highest
concentrations should be fractionated.
3. Submit a draft groundwater monitoring report with updated historical groundwater
data tables, appropriate maps and laboratory reports within 30 days of sampling.
Total Work Assignment Cost: $650.00
III. PRICE AND PAYMENT SCHEDULE:
A. The expense to the DERR for completing this Work Assignment shall not exceed
$650.00, including administrative costs, contract management, project management,
and other associated costs.
B. Payment requests shall be submitted when tasks are completed, as outlined in the
"Deliverable and Payment Schedule."
IV. SCHEDULE FOR COMPLETION OF WORK AND REPORTING REQUIREMENTS
A. The DERR has set a deadline of June 28, 2024, for Atlas to submit a draft work plan
and price for the determined work.
B. After the DERR has reviewed and commented on the draft reports, Atlas will be
required to provide final groundwater monitoring reports within 4 days of receipt of
the DERR comments.
Approved by:
DERR Project Manager: ~~ Date: 06/05/2024
DERR Contract Officer: 1~m1~ Date: 06/05/2024
LUST Section Manager: ~~~ Date: 06/06/2024
,1«n1e,r Cotette. 06/07/2024 Consultant: James Coletta (Jun 7, 202410:43 MDT) Date:
DELIVERABLE AND PAYMENT SCHEDULE
Work Assignment: FLU-16-ATC
Deliverable/
Task Description Due Date Price
II Work Plan and Price for Securing Access and
Conducting One Groundwater Monitoring June 28, 2024 $650.00
Event with Reporting
Work Assignment Total: $650.00