Loading...
HomeMy WebLinkAboutDERR-2024-0104886952 South High Tech Drive, Suite B Midvale, UT 84047 P (801) 545-8500 Terracon.com May 29, 2024 Utah Department of Environmental Quality Division of Environmental Response and Remediation 195 North 1950 West P.O. Box 144840 Salt Lake City, Utah 84114-4840 Attn: Ms. Eileen Brennan P: (801) 536-4100 E:ebrennan@utah.gov Re: Work Plan GHS-3-TER Work Plan and Price for Securing Access and Conducting One Groundwater Monitoring Event with Reporting Hardy Service Conoco 98 West Main Street, Delta, Utah Facility ID 2000349, Release ID GHS Terracon Project No. 61247154 Dear Ms. Brennan: Terracon is pleased to provide this Work Plan and Price for the Hardy Service Conoco facility in Delta, Utah. This Work Plan was requested by the Utah Department of Environmental Quality (UDEQ), Division of Environmental Response and Remediation (DERR), under Contract #216383, Work Assignment GHS-3-TER. The objective of this Work Plan is to secure permission to access the site wells, conduct one round of monitoring and sampling of all available monitoring wells, and submit a report documenting the monitoring event. Sincerely, Terracon Consultants, Inc. Craig D. Eaton Amy Austin Utah UST Consultant CC167 Approved Project Reviewer Utah UST Consultant CC0238 Attachments: Exhibit 1 – Site Plan 2024 Cost Estimate Spreadsheet ' P \ ' X V W L Q Work Plan GHS-3-TER Hardy Service Conoco (Facility ID 2000349 / Release ID GHS) | Delta, Utah May 29, 2024 | Terracon Project No. 61247154 1 WORK PLAN TASKS Task 1: Site Access and Preliminaries Task 1 is to secure permission to access the site wells. It is anticipated site access can be acquired by calling or emailing the property owner and that they will provide access and sign a DERR Grant of Access form without issue. If the site owner, or occupant if different than the owner, resist site access, we will contact you to discuss alternative actions that are beyond the scope of this Work Plan. Subtotal for Task 1: .................................................................. $606.00 Task 2: Groundwater Monitoring and Sampling Terracon reviewed the Utah DEQ’s Interactive Map for the most recent documents associated with the Hardy Service Conoco site. The most recent document, a Site Condition Report for LUST Trust Site Reviews, dated September 3, 2021, stated the following relating to the Hardy Service Conoco site. The site has been re-developed as a City of Delta Fire Station. A release was reported from a previous gas station that operated on the site. Terracon was able to locate 5 of the 6 monitoring wells installed at the site in 2014. The only well not found was MW- 2, which has been covered by concrete in the front of the building during re- development. The last sampling event conducted at the site was in May 2015. Groundwater sampling of the six monitoring wells associated with the site reported concentrations of dissolved petroleum hydrocarbons above the ISL in two on-site monitoring wells: MW-1 and MW- 2. Naphthalene exceeded the Tier 1 Screening Level in MW-1. Off-site monitoring wells did not report an exceedance of an ISL. Based on the 2021 report, we assume five groundwater monitoring wells (MW-1, MW-3, MW- 4, MW-5, and MW-6) remain on-site and are accessible for this monitoring and sampling event. The attached Exhibit 1, extracted from the 2021 report, shows the locations of the monitoring wells. Terracon will mobilize to the site to conduct the single round of groundwater monitoring and sampling. This will include documenting depth to water, thickness of any free product, and other observations, and collecting samples for laboratory analyses. The samples will be collected by a Utah-certified Soil & Groundwater Sampler following applicable DERR regulations and guidance. The 5 groundwater samples and one trip blank will be submitted under chain-of-custody protocols to Chemtech Ford Analytical Laboratory for analysis of: Work Plan GHS-3-TER Hardy Service Conoco (Facility ID 2000349 / Release ID GHS) | Delta, Utah May 29, 2024 | Terracon Project No. 61247154 2 benzene, toluene, ethylbenzene, total xylenes, and naphthalene (BTEXN), by EPA Method 8260, gasoline-range total petroleum hydrocarbons (GRO), by EPA Method 8260, and diesel-range total petroleum hydrocarbons (DRO), by EPA Method 8015. If concentrations exceed an ISL, the groundwater sample with the highest GRO or DRO concentrations will subsequently be analyzed using DERR’s total petroleum hydrocarbon fractionation method, by EPA Method 8270. This is anticipated to be the groundwater sample from monitoring well MW-1. Subtotal for Task 2: ............................................................... $4,739.20 Task 3: Project Documentation, Report, and PST Claims Management Upon completion of site activities and receipt of the laboratory analytical results, a Groundwater Monitoring Report will be prepared and submitted to DERR that will include the following. Documentation of field activities Site plan showing pertinent site features Current and historical laboratory analytical laboratory results Current and historical groundwater elevation data A groundwater gradient map Iso-concentration contour maps for benzene and GRO, where sufficient data is available. Benzene and GRO iso-concentration maps were prepared in the last sampling event conducted in 2015. Data evaluation and presentation of findings Task 3 also includes time to generate the PST Fund invoices and coordination to complete the invoice with the client and DERR. Subtotal for Task 3: .............................................................. $2,129.00 Total: $7,474.20 Work Plan GHS-3-TER Hardy Service Conoco (Facility ID 2000349 / Release ID GHS) | Delta, Utah May 29, 2024 | Terracon Project No. 61247154 3 The services in this Work Plan will be performed in a manner consistent with generally accepted practices of the professional undertaken in similar studies in the same geographic area during the same period. Terracon makes no warranties, expressed or implied, regarding its services, findings, conclusions or recommendations. Please note that Terracon does not warrant the work of laboratories, regulatory agencies or other third parties supplying information used in the preparation of the report. If PST Fund Labor rates are changed prior to work being completed, the Work Plan will be updated to reflect the new rates. If conditions are identified that will substantially alter the proposed Scope of Work, Terracon will notify DERR to discuss appropriate actions or modifications to this Work Plan. Terracon will not exceed the estimated costs without prior approval from the DERR Project Manager. ASSUMPTIONS The following assumptions were made during preparation of this Work Plan and Price: Terracon assumes that no site access issues will be encountered. In the event Terracon encounters difficulty with access to the site or adjoining roadways, DERR will be contacted immediately to determine appropriate courses of action. Terracon assumes that the monitoring wells proposed for sampling are in adequate working condition with sufficient water column to allow sampling and are not covered by asphalt or otherwise inaccessible. For cost estimating purposes, Terracon assumes 6 groundwater samples will be submitted to the analytical laboratory, one from each of the 5 wells, plus one trip blank. If concentrations of petroleum hydrocarbons exceed an ISL, TPH- Fractionation will be requested on the sample reporting the highest concentrations. If you have any questions or would like to make any modifications to the approach described in this Work Plan and Price, please contact Amy Austin at (801) 746-5464. Project Mngr: Approved By: Checked By: Drawn By: Project No. Scale: Date: File No.Consulting Engineers and Scientists Exhibit 640 East Wilmington Avenue Salt Lake City, Utah FAX. (801) 466-9616PH. (801) 466-2223 ABF SJB MSL CDE AL147368 As Shown Exhibit 1.dwg 09.10.2014 Site Map 1Former Hardy Service Conoco DERR 98 West Main Street Delta, Utah Facility No. 2000349, Release ID GHS N EAST MAIN STREET MW-6 MW-3 MW-2MW-1 MW-5 MW-4 BH-2BH-1 LEGEND BOREHOLE LOCATION MONITORING WELL LOCATION COMMUNICATION GAS IRRIGATION SEWER UTILITY TRENCH WATER MW-1 BH-1 PST Cost Estimate Spreadsheet Project:Labor Catagories (2023 PST Fund Approved Rates) Facility ID:0 P100 Principal $78 / hour Release ID:1 P101 Senior Project Manager $62 / hour Work Plan:2 P102 Pofessional Engineer/Geologist Date:3 P103 Project Manager 4 P104 Field Scientist 5 P105 Senior Technician 6 P106 Field Technician 7 P107 Drafter Hours By Labor Catagory 0 1 2 3 4 5 6 7 8 9 10 Task 1 - Site Access and Preliminaries 1.0 1.0 $100.00 $100.00 1.0 1.0 2.0 $270.00 $270.00 2.0 2.0 $236.00 $236.00 Subtotal $606.00 $0.00 $606.00 Task 2 - Groundwater Monitoring and Sampling 1.0 1.0 1.0 3.0 $371.00 $371.00 2.0 2.0 $202.00 $202.00 4.0 4.0 $404.00 $404.00 0.0 $0.00 $174.20 $174.20 0.0 $0.00 $1,809.00 $1,809.00 5.0 5.0 $505.00 $505.00 0.0 $0.00 $55.00 $55.00 1.0 1.0 $101.00 $101.00 0.0 $0.00 $55.00 $55.00 0.0 $0.00 $25.00 $25.00 0.0 $0.00 $107.00 $107.00 0.0 $0.00 $88.50 $88.50 0.5 0.5 $50.50 $50.50 0.0 $0.00 $540.00 $540.00 0.0 $0.00 $252.00 $252.00 Subtotal $1,633.50 $3,105.70 $4,739.20 Task 3 - Project Documentation, Report, and PST Claims Management 1.0 8.0 4.0 3.0 1.0 17.0 $1,817.00 $1,817.00 0.25 1.0 2.0 3.25 $312.00 $312.00 Subtotal $1,817.00 $0.00 $2,129.00 TOTAL $4,056.50 $3,105.70 $7,474.20 Safety and project kick-off Preliminaries (field supplies preparation, equipment gathering) 8 P108 PST Trust Fund Claim Specialist Lodging (1 night @ $107/night (2024 GSA rate) Per Diem (2 days @ $44.25/day - GSA 2024 rate; first and last day) Scope of Work: Task Description $101 / hour 9 P109 Administrative Assistant 10 P110 Technical Expert $90 / hour $73 / hour $85 / hour Total Costs Total Hours Total Labor ODCs $169 / hour $152 / hour $147 / hour $118 / hour Hardy Service Conoco 2000349 GHS GHS-3-TER 5/29/2024 Securing Access and Conducting One Groundwater Monitoring Event with Reporting Report preparation, tables, exhibits and review Travel Time (2 hours each way) Mileage 260 miles @ 2024 GSA Personally Owned Vehicle Rate of $0.67/mile) Fieldwork/sampling (1 hr/2" well) Sampling event coordination (scheduling, field staff coordination) Chemtech Ford (TPH Fractionation) [1 GW @ $195/sample (DRO) + $57/sample (GRO)] Data Reduction / Paperwork (1 hour per day) Disposable weighted bailers (5 @ $11 ea) Sampling Supplies and Disposables (1 day @ $25/day) Product / water interface probe (1 days @ $55/day) Site Access (1 hour of labor, but cost capped at not-to-exceed labor of $100) Coordinating Traffic Control (AWP or equivalent) Sample delivery to laboratory Chemtech Ford (MBTEXN/TPH-GRO/TPH-DRO) [6 GW @ $90/sample][5 samples plus 1 QA/QC] Traffic Control (AWP Safety) Invoice review, reimbursement request Page 1 of 1