HomeMy WebLinkAboutDDW-2024-010603Utah Department Of Environmental Quality
Division Of Drinking Water Sanitary Survey
Sanitary Survey
General System Information
Site Visit Date Surveyor Name
08/07/2024 Nagendra Dev
WEBER BASIN WCD - NORTH PWS ID: UTAH29109 Rating: Approved 05/27/2003 Active
1 Admin Contact (AC) [ eMail address is REQUIRED ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: DARREN E
*Last Name: HESS
*Organization:
*Address: Redacted
*City: SOUTH WEBER
*State: UT
*Zip: 84405
*Email: dhess@weberbasin.gov
*Phone: 801-771-4365
Emergency Phone: 801-475-4320
2 Legal Contact (LC) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: WEBER BASIN WCD
*Address: 2837 UT-193
*City: LAYTON
*State: UT
*Zip: 84041
*Email: BNELSON@WEBERBASIN.GOV
*Phone: 801-359-4494
3 Owner Contact (OW) [ if no eMail address is available, enter NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name:
*Last Name:
*Organization: WEBER BASIN WCD
*Address: 2837 UT-193
*City: LAYTON
*State: UT
*Zip: 84041
*Email: BNELSON@WEBERBASIN.GOV
*Phone: 801-359-4494
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 1 of 26
Site Visit Info
Management and Operations
4 Direct Operator in Charge (DO) [ if no eMail address is available, enter
NoeMail@utah.gov ]
MIN | 15pts | SM | G004 | R309-100-4(5) | Rule requires a person or organization be
designated as the owner of the system and name, address and phone number of such
be supplied to the Division.
*First Name: Josh
*Last Name: Hogge
*Organization:
*Address: 2837 UT-193
*City: Layton
*State: UT
*Zip: 84041
*Email: jhogge@weberbasin.gov
*Phone: 801 771 4359
Emergency Phone: 801 771 4359
5 Does the system serve a Residential population?N
6 Does the system serve a Transient population? (A transient population is a rotating
population that is served by a water system that does not remain in the jurisdiction of
the water system for long periods of time. Examples of a transient population include,
but are not limited to, campers at a campground, users of a highway rest stop, skiers
at a ski resort, guests at a hotel, or patrons of a restaurant or a shopping center.)
N
7 Does the system serve a Non-Transient population? (A non-transient population is a
population served by a water system that is the same population being served by the
system for at least six months of the year, but is not a resident in the system.
Examples of a non-transient population include, but are not limited to, employees of a
restaurant, shop, or ski resort; teachers and students at a school, day-care center, or
church; doctors, nurses, and other employees at a hospital or healthcare clinic.)
N
8 Population - Wholesale :19500
9 Residential Connections:0
10 Commercial Connections:0
11 Industrial Connections:0
12 Agricultural Connections:0
13 Date of Survey (First Day of Field Work)08/05/2024
14 Date of Survey (Last Day of Field Work) ** this should match the Date of Survey in the
header **
08/07/2024
15 Date final report sent to system (questionnaire, deficiency report and capacity
spreadsheet)
09/03/2024
16 Water system representative present during the survey:Josh Hogge (Notes: Dillon Walton)
17 How much time was spent to prepare survey documents prior to field survey? (Round
up to nearest quarter hour)
3
18 How much time was spent to complete the field survey (arrival to completion; include
travel time between water system facilities)? (Round up to nearest quarter hour)
6
19 How much time was spent traveling from the office to system and back again at the
end of the field survey? (Round up to nearest quarter hour)
1.5
20 How much time did it take to finish the Survey Report? (Round up to nearest quarter
hour)
4
21 Did you survey multiple water systems in one trip? ... if yes, answer the following
question(s)
N
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 2 of 26
22 For a community water system with water sources that require power to produce
sufficient flow, system is equipped with standby power option.
SIG | 25pts | SO | S033 | R309-515-6(2)(a) | Rule requires a community water system
without naturally flowing water sources, such as springs or flowing wells, to have one
or more of the system's sources equipped for operation during power outages. To
ensure continuous service when the primary power has been interrupted, a redundant
power supply is required. A redundant power supply may include a transfer switch for
auxiliary power such as a generator or a power supply service with coverage from two
independent substations. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
23 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through or in
process of DDW review [LIST UNDOCUMENTED FACILITIES OR DESCRIBE
MODIFICATIONS, IF APPLICABLE] [undocumented sources are covered in a
different question]
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
24 Are there any individual home booster pumps installed in the distribution system (not
for fire suppression)?
SIG | 50pts | SM | M008 | R309-550-11(3) | R309-550-11(3)
C
25 Does the system haul water?N
26 For a community system serving 100 or more connections, at least 2 water sources
are available.
SIG | 50pts | SO | TGR7 | R309-515-4(3) | Rule requires Community Water Systems
serving more than 100 connections to have a minimum of two sources except where
served by a water treatment plant. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
27 Does system have a consecutive connection to another water system not listed in the
SOURCE section of Waterlink Report? If yes, answer the following question(s)
N
28 Does the system have a deficiency meeting the required source capacity? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
29 Does the system have a deficiency meeting the required storage capacity DUE
SOLELY TO FIRE SUPPRESSION NEEDS? (USE SPREADSHEET FOR
CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT FROM THE
FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS "NO."
N
30 Does the system have a deficiency meeting the required equalization storage capacity
for indoor/outdoor demands (but not because of fire suppression needs)? (USE
SPREADSHEET FOR CALCULATIONS) *IF YES, SELECT CORRECT STATEMENT
FROM THE FOLLOWING AND MARK "YES"; MARK ALL OTHER STATEMENTS
"NO."
N
31 Does your water system have an Emergency Response Plan?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 3 of 26
Cross Connection and Operator Certification
31A Does your Emergency Response Plan include cybersecurity?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
Y
31B Does your water system use any computers, laptops, phones, tablets, or any other
computer systems to manage, operate, or maintain the PWS (SCADA or Industrial
Control Systems)? This includes any water sources, treatment, distribution or any
process related to operation function
Y
31C Does your water system use any computer systems in regular business operations
such as accounting, billing, payroll, human resources, or management?
Y
32 Legally adopted authority statement
MIN | 15pts | SM | M003 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes a legally adopted and functional
local authority to enforce the program (i.e., ordinance, bylaw, or policy).
C
33 Documentation of annual public awareness and/or employee training
MIN | 15pts | SM | M004 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes providing public education or
awareness material or presentations.
C
34 Documentation of personnel trained to manage the program (COMMUNITY WATER
SYSTEMS POPULATION 500 AND ABOVE REQUIRE A DDW CERTIFIED CCC
PROGRAM ADMINISTRATOR. ALL OTHER WATER SYSTEMS REQUIRE AT A
MINIMUM BACKFLOW 101 OR EQUIVALENT/ GREATER CCC TRAINING)
MIN | 15pts | SM | M005 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes an operator with adequate
training in the area of cross connection control or backflow prevention.
C
35 Does the water system have detailed records of cross connection control activities?
(inventories of backflow assemblies, devices, and air gaps installed within the system)
MIN | 15pts | SM | M006 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes written records of cross
connection control activities.
C
36 Does the water system have records of on-going enforcement activities? (test history,
enforcement activities, hazard assessments)
MIN | 15pts | SM | M007 | R309-105-12(2) | Rule requires each public water system to
have a cross connection control program that includes test history and documentation
of on-going enforcement activities.
C
37 Operator meets required level of certification for water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
SIG | 50pts | OC | C001 | R309-105-11, R309-300-5(3) | Rule requires every
community and NTNC water system and public water systems that utilize
treatment/filtration to have at least one operator certified at the classified grade of the
water system. Certification must be appropriate for the type of system operated
(treatment and/or distribution). This significant deficiency must be corrected within 120
days of notification or have a corrective action plan approved by DDW.
C
38 Certified operator is within 1 hour travel time of water system. ( IF NO CERTIFIED
OPERATOR IS REQUIRED MARK COMPLIANT )
MIN | 0pts | OC | C002 | R309-300-5(14) | Rule requires the operator to be within 1
hour travel time, under normal work and home conditions, of each drinking water
system for which he is considered in direct responsible charge.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 4 of 26
General Maintenance and Environment
Distribution
39 Are there any visual indications of unsanitary conditions?
SIG | 50pts | SM | M017 | R309-200-6, R309-105-18, R309-215-4(3) | R309-200-6 The
Secondary Maximum Contaminant Levels for public water systems deals with
substances which affect the aesthetic quality of drinking water. They are presented
here as recommended limits or ranges and are not grounds for rejection. The taste of
water may be unpleasant and the usefulness of the water may be impaired if these
standards are significantly exceeded.
R309-105-18 The Director or the local health department shall be informed by
telephone by a water supplier of any "emergency situation". The term "emergency
situation...
R309-215-4(3) If the water fails to meet minimum standards, then certain public
notification procedures shall be carried out, as outlined in R309-220. Water suppliers
shall also keep analytical records in their possession, for a required length of time, as
outlined in R309-105-17.
C
40 No unprotected connection between the distribution system and a source of
contamination. (If there is an unprotected connection, describe the location in detail.)
SIG | 50pts | DS | D009 | R309-550-5(11) | R309-550-5(11)
C
41 Are air release/vacuum valves in the distribution system? ... if yes, answer the
following question(s)
Y
41A Open end of vent line covered with #14 mesh screen
SIG | 25pts | DS | D004 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
41B For a valve in a chamber, open end of vent pipe is at least 12 inches above grade or
one foot above distribution line in a chamber that does not flood.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
41C Chamber has drain to daylight, gravel-filled adsorption pit if not subject to flooding, or
sump pump.
SIG | 25pts | DS | D007 | R309-550-6(6)(b) and (7)(b) | Rule states chambers shall be
provided with a drain to daylight, if possible. Where this is not possible, underground
gravel-filled absorption pits may be used if the site is not subject to flooding and
conditions will assure adequate drainage. Sump pumps may also be considered if a
drain to daylight or absorption pit is not feasible. This significant deficiency must be
corrected within 120 days of notification or have a corrective action plan approved by
DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 5 of 26
General Disinfection
ST001 - HIGHWAY 89 TANK - Proposed
41D Open end of vent line down-turned.
SIG | 25pts | DS | D006 | R309-550-6(6)(b) | Rule states the open end of the air relief
vent pipe from automatic valves shall be provided with a #14 mesh, non-corrodible
screen and a downward elbow, and where possible, be extended to at least one foot
above grade. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
42 Water system has a program to maintain, operate, or control the use of fire hydrants.
REC | 0pts | DS | D012 | N/A | Fire hydrants provide a direct access to the water in the
distribution system. In order to protect the quality and integrity of the water, fire
hydrant access should be controlled.
C
43 Blow offs or air release valves are not directly connected to a sanitary sewer line.
SIG | 50pts | DS | D013 | R309-550-6(5)(a), R309-550-6(6)(c) and (7)(a) | Rule states
blow-offs or air relief valves shall not be connected directly to a sewer. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
44 Blow offs or air release valves do not discharge below flood level in ditches or
streams.
SIG | 50pts | DS | D016 | R309-550-9(1) and (2), R309-550-13(2) | R309-550-9(1 & 3)
C
45 All water mains installed after 1995 that provide fire flow are at least 8 inches in
diameter.
MIN | 15pts | DS | D019 | R309-550-5(4) & (5) | Rule states that the minimum line size
serving a fire hydrant lateral shall be 8-inch diameter unless a hydraulic analysis
indicates that required flow and pressures can be maintained by 6-inch lines.
C
46 Distribution system capable of providing minimum pressure of 20 psi at all service
connections.
SIG | 50pts | DS | D003 | R309-105-9, R309-550-5(1) | Rule states the distribution
system shall maintain minimum pressures as required by R309-105-9 at all points of
connection under all flow conditions. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
47 Was the water system constructed or new portions added after January 1, 2007? ... if
yes, answer the following question(s)
N
48 Water system follows AWWA disinfection procedures for new, repaired, or seasonal
water mains and tanks.
SIG | 25pts | MR | D018 | R309-550-8(10) | All new and repaired water mains and
appurtenances shall be disinfected in accordance with AWWA Standard C651. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
49 How often do you periodically disinfect any or all parts of your water system (i.e. batch
disinfection) other than for repairs or maintenance?
SIG | 50pts | SM | G006 | R309-105-6(1)(a), R309-500-6 | R309-105-6(1) Approval of
Engineering Plans and Specifications
R309-500-6 Plan Approval Procedure.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 6 of 26
WS001 - NORTH OGDEN WELL - Active
50 Is this facility in operation without an Operating Permit?
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
N
50A When is the anticipated date to request an Operating Permit? Explain in comments...in a year
51 Is this facility Active or Inactive?A
52 Operating Period (Start Date)05/01
53 Operating Period (Ending Date)09/30
54 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
55 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
56 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
57 Is the well casing vented? ... if yes, answer the following question(s)Y
57A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 7 of 26
57B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
57C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
58 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
58A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
58B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
58C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
59 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
60 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
61 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 8 of 26
62 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
63 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
64 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
65 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
66 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
67 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
68 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
69 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
69A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
69B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 9 of 26
WS002 - BEN LOMOND WELL - Active
69C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
70 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
71 Does well require oil-lubrication?N
72 Is this facility Active or Inactive?A
73 Operating Period (Start Date)05/01
74 Operating Period (Ending Date)09/30
75 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
76 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
77 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
78 Is the well casing vented? ... if yes, answer the following question(s)Y
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 10 of 26
78A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
78B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
78C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
79 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
79A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
79B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
79C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
80 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
81 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 11 of 26
82 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
83 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
84 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
85 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
86 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
87 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
88 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
89 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
90 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 12 of 26
WS003 - NORTH WEBER WELL - Active
90A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
90B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
90C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
91 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
92 Does well require oil-lubrication?N
93 Is this facility Active or Inactive?A
94 Operating Period (Start Date)05/01
95 Operating Period (Ending Date)09/30
96 Undocumented sources shall not be physically connected to the drinking water
system. (IF SOURCE IS NOT IN SYSTEM INVENTORY MARK "DEFICIENT")
SIG | 200pts | SO | S001 | R309-515-6(5), R309-515-7(4), R309-500-9(2) and (3) |
R309-105-6(1) requires plans and specifications for all public drinking water projects to
be approved in writing by the Director prior to the commencement of construction. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 13 of 26
97 Well casing is at least 18 inches above finished ground surface and 12 inches above
well house floor.
SIG | 25pts | SO | S003 | R309-515-6(6)(b)(vi), R309-515-6(12)(c)(ii), R309-515-
6(13)(a) | Rule requires the permanent well casing to project at least 18 inches above
the final ground surface and 12 inches above the pump house floor; at sites subject to
flooding, the top of the casing must terminate at least 3 feet above the 100-year flood
level or highest known flood elevation, whichever is higher. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
98 Wellhead is sealed to prevent contamination.
SIG | 50pts | SO | S013 | R309-515-6(6)(i) | R309-515-6(6)(i) and R309-515-
6(12)(b,c,d)require a sanitary seal be installed and maintained at the wellhead and
discharge piping. This significant deficiency should be corrected within 120 days of
notification or have a corrective action plan approved by
C
99 Is the well casing vented? ... if yes, answer the following question(s)Y
99A Vent screened with #14 mesh screen
SIG | 25pts | SO | S006 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(a)require vents be fitted with a #14 mesh or finer non-corrodible screen.
C
99B Vent down-turned
SIG | 25pts | SO | S007 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be downturned or shielded to prevent the entrance of
surface water or rainwater.
C
99C Vent has adequate clearance to prevent contamination from entering the well
SIG | 25pts | SO | S008 | R309-515-6(12)(d)(iii) | Guidance states provisions should be
made for venting the well casing, however if vented R309-515-6(12)(d)(iii) and R309-
550-6(6)(b) requires vents be terminated with a discharge with an appropriate air gap.
C
100 Does the well have a pump to waste line? ... if yes, answer the following question(s)Y
100A Pump to waste line discharges with a minimum of 12-inch clearance to flood rim
SIG | 25pts | SO | S009 | R309-515-6(12)(d)(ix) | Rule requires a pump-to-waste line
connected to a sewer/storm drain to have a minimum 12-inch clearance to the flood
rim. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
100B Pump to waste line equipped with #4 non-corrodible mesh screen
SIG | 25pts | SO | S010 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be covered with a No. 4 mesh corrosion-resistant screen. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 14 of 26
100C Pump to waste line downturned if it discharges to sewer/storm drain or allowing
complete drainage if not downturned
SIG | 25pts | SO | S011 | R309-515-6(12)(d)(ix) | The discharge end of the pump-to-
waste line shall be downturned. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
101 Provisions available to periodically measure water levels
MIN | 5pts | SO | S015 | R309-515-6(12)(e ), R309-515-6(12)(c)(vi) | Rule requires
provisions be made to permit periodic measurement of water levels in the completed
well.
C
102 Wellhead secured to protect quality water
SIG | 25pts | SO | S002 | R309-105-10(5) | All water system facilities shall be secure.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
103 Well head or well house and equipment protected from flooding
SIG | 25pts | SO | S020 | R309-515-6(6)(b)(vi), R309-515-6(12)(d)(iii), R309-515-
6(13)(a) to (d) | Top of well casing shall terminate at least 18” above ground level or
12” above well house floor and for sites that flood at least 3’ above 100-year flood
level or highest known flood elevation. Well casing terminating in underground vault
shall have a drain to daylight and surface runoff directed away from vault access. Well
house floor shall be sloped for drainage, and have a drain to daylight unless highly
impractical. This significant deficiency must be corrected within 120 days of notification
or have a corrective action plan approved by DDW.
C
104 There are no unprotected cross-connections in well discharge piping.
SIG | 50pts | SO | S021 | R309-105-12(1), R309-515-6(12)(d)(iii) | Rule requires the
well discharge piping to be protected against the entrance of contamination. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
105 No toxic chemicals, hazardous or flammable materials, or lubricants inside the well
house or near well head?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
106 Well discharge line has a smooth-nosed sampling tap, which samples the well water
before any chemical injection. (first item from the wellhead).
MIN | 5pts | SO | S023 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with a smooth nosed sampling tap, a check valve, a pressure gauge, a
means of measuring flow, and a shutoff valve. (smooth nosed sampling tap being the
first item from the well head and the shut-off valve as the last item)
C
107 Well discharge line has a check valve.
MIN | 5pts | SO | S024 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 15 of 26
PF002 - TP002 DESANDED WATER PUMP -- Pump Stations - Active
108 Well discharge line has a pressure gauge.
MIN | 5pts | SO | S025 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
109 Well discharge line has a means to measure flow.
MIN | 5pts | SO | S026 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
110 Well discharge line has a shut-off valve (last item from the well head).
MIN | 5pts | SO | S027 | R309-515-6(12)(d)(iv) | Rule requires the discharge piping to
be equipped with (in order of placement from the wellhead) a smooth nosed sampling
tap, a check valve, a pressure gauge, a means of measuring flow, and a shutoff valve.
C
111 Is there an air/vac valve on the well discharge line? If yes, answer the following
question(s)
Y
111A Air vacuum relief valve on well discharge piping downturned
SIG | 25pts | SO | S028 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be down-turned.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
111B Air vacuum relief valve on well discharge piping screened with #14 mesh screen
SIG | 25pts | SO | S029 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be covered with a
#14 mesh corrosion-resistant screen. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
111C Air vacuum relief valve on well discharge piping has at least 6 inches of clearance
above floor
SIG | 25pts | SO | S030 | R309-515-6(12)(d)(v) | Rule requires the exhaust/relief piping
on an air release/vacuum relief valve on the well discharge piping to be at least 6
inches above the well house floor. This significant deficiency must be corrected within
120 days of notification or have a corrective action plan approved by DDW.
C
112 Wells that pump directly into a distribution system have means to release trapped air
from pump discharge piping (for example, pumps directly to a tank, has an air release
valve or pump to waste line)
MIN | 5pts | SO | SL01 | R309-515-6(12)(d)(v) | Rule requires a well that pumps
directly into the distribution system be equipped with an air release/vacuum relief valve
located upstream of the check valve, unless the wellhead valve and piping provide for
pumping to waste all trapped air before water is introduced into the distribution
system.
C
113 Does well require oil-lubrication?N
114 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 16 of 26
115 There are no undocumented drinking water facilities (i.e. tanks, pump stations,
treatment facilities, etc.) or recent modifications that have not gone through DDW
review
SIG | 50pts | SM | G001 | R309-100-5(2), R309-500-6, R309-500-9, R309-500-9(2)
and (3) | Rule requires complete plans & specification for all public drinking water
projects to be approved in writing by the Director. Any facility found that has not
started DDW review shall be considered unapproved. This significant deficiency must
be corrected within 120 days of notification or have a corrective action plan approved
by DDW.
C
116 Pump Type (Centrifugal, Hand pump, Jet, Positive Displacement, Screw, Submersible,
Vertical turbine)
Vertical turbine
117 If the pump station is used to pressurize the distribution system, does it have at least
two functioning pumping units? ... if yes, answer the following question(s)
SIG | 25pts | PU | PS18 | R309-540-5(4)(b) | Rule states inline booster pumps,
withdrawing water directly from distribution lines without storage and feeding water
directly into distribution lines, shall have at least two pumping units. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
Y
117A Demand is met by remaining pump(s) when largest pumping unit out of service
SIG | 25pts | PU | PS19 | R309-540-3(a) | Inline booster pumps shall have at least two
pumping units (such that with any one pump out of service, the remaining pump or
pumps shall be capable of providing the peak day demand of the specific portion of
the system serviced). This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
118 Pump station building and equipment are protected from flooding.
MIN | 15pts | PU | PS13 | R309-540-5(1)(a)(ii), R309-540-5(2)(a)(iii) | Pump station
access shall be 6" above surrounding ground and located at least 3’ above 100-year
flood elevation or highest recorded flood elevation; station is accessible at all times
unless it can be taken out of service when inaccessible.
C
119 There are no unprotected cross-connections in the pump station.
SIG | 50pts | PU | PS15 | R309-105-12(1) | Cross connections are not allowed unless
controlled by an approved and properly operating backflow prevention assembly or
device. This significant deficiency must be corrected within 120 days of notification or
have a corrective action plan approved by DDW.
C
120 Discharge piping has a pressure gauge.
MIN | 15pts | PU | PS03 | R309-540-5 (6)(c)(i) | Rule requires that a standard pressure
gauge be installed on the pump discharge line.
C
121 Does the pumping facility have an air relief valve located on the discharge piping? ... if
yes, answer the following question(s)
Y
121A End of air relief piping downturned
SIG | 25pts | PU | PS12 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air
relief vent pipe from automatic valves shall be provided with a downward elbow. This
significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 17 of 26
TP001 - NORTH OGDEN WELL CHLORINATOR -- Treatment - Chlorination General - Active
121B End of air relief piping covered with #14 mesh screen
SIG | 25pts | PU | PS10 | R309-550-6(6)(b), R309-540-6(2) | The open end of the air
relief vent pipe from automatic valves shall be provided with a #14 mesh, non-
corrodible screen. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
121C End of air relief piping terminates at least 6 inches above floor
SIG | 25pts | PU | PS11 | R309-550-6(6)(b), R309-540-6(2) | Rule requires that an air
release valve discharge line terminate a minimum of 6 inches above the floor.
C
122 Pump station properly secured
MIN | 15pts | PU | PS33 | R309-540-5(1)(a)(v) | The pump station is protected to
prevent vandalism and entrance by animals or unauthorized persons.
C
123 Is this facility Active or Inactive?A
124 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
N
125 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
126 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
127 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
128 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
129 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 18 of 26
130 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
131 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
132 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
N
133 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
134 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
135 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
135A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
135B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
135C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
135D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
135E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
136 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 19 of 26
TP002 - BEN LOMOND WELL CHLORINATOR -- Treatment - Chlorination General - Active
137 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
138 Is this facility Active or Inactive?A
139 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
N
140 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
141 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
142 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
143 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
144 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
145 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 20 of 26
TP003 - NORTH WEBER WELL CHLORINATOR -- Treatment - Chlorination General - Active
146 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
147 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
N
148 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
149 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
150 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
150A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
150B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
150C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
150D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
150E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
151 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
152 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
153 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 21 of 26
154 Is system required to provide primary disinfection? Prompt - If system knows they are
required to chlorinate based on water quality issues and/or knows they are required to
provide a minimum CT then follow-up by DDW is needed.
N
155 When chlorination is required, disinfection has operated uninterrupted during the past
year while supplying drinking water.
SIG | 50pts | TR | TD25 | R309-520-6 | Rule requires continuous disinfection of
groundwater sources that do not consistently meet bacteriological quality standards,
all surface water sources, and groundwater sources under the direct influence of
surface water. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
156 Chlorine (gas & hypochlorite solution, tablets, granules, ) and chemicals used to
generate chlorine solutions and chlorine dioxide meet ANSI/NSF 60.
SIG | 50pts | TR | TD90 | R309-525-11(5), R309-520-6(2) | All chemicals added to
drinking water, including chlorine, chloramines and chemicals used to generate
hypochlorite solutions and chlorine dioxide, shall be certified as complying with
ANSI/NSF Standard 60. This significant deficiency must be corrected within 120 days
of notification or have a corrective action plan approved by DDW.
C
157 If chemical dilution or dissolution is needed, cross-connection control is provided on
water lines feeding solution tanks.
SIG | 50pts | TR | TX07 | R309-525-11(2)(c), R309-525-11(9)(b)(i) to (iv) | Cross
connection control shall be provided on make-up water lines feeding solution tanks.
This significant deficiency must be corrected within 120 days of notification or have a
corrective action plan approved by DDW.
C
158 Water flow rate is measured to control chemical feed?
SIG | 25pts | TR | TD79 | R309-525-11(7)(d)(ii) and (iii), R309-525-11(7)(a)(i) |
Chemical feed rates shall be proportional to flows and a means to measure water flow
rate shall be provided. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
159 Solution tanks and tank refilling line entry points are properly labeled to identify the
chemicals
MIN | 15pts | TR | TG03 | R309-525-11(8)(c)(vii) | Rule requires tanks to be properly
labeled to designate the chemical contained.
C
160 Free chlorine residual test equipment on-site or available?
MIN | 15pts | TR | TD78 | R309-520-7(1)(j) | Rule requires chlorine residual test
equipment available capable of measuring residuals to the nearest 0.1 mg/l in the
range below 0.5 mg/l, to the nearest 0.3 mg/l between 0.5 mg/l and 1.0 mg/l and to the
nearest 0.5 mg/l above 1.0 mg/l.
C
161 Spare parts are available to replace parts subject to wear and breakage
MIN | 15pts | TR | TD75 | Standard Method 334.0 Determination of Residual Chlorine
in Drinking Water Using an Online Chlorine Analyzer. [EPA 815-B-09-013 September
2009 11.1.1.2 Page 13] | Spare parts shall be provided and maintained for all
chlorinators to repair parts subject to wear and breakage.
C
162 Is chlorine chemical dose rate adjusted due to different water demand flow rates
and/or changing water quality?
N
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 22 of 26
TP001 - NORTH OGDEN WELL CHLORINATOR -- On-Site Generation - Active
163 Is there a designated chlorine Point of Entry (POE) sample location?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
164 POE is before first connection/customer?
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
165 Chlorine residual records are maintained and available... if yes answer following
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
Y
165A System is sampling distribution residuals throughout entire distribution system
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
165B Distribution chlorine residuals meet minimum concentration requirement
SIG | 25pts | TR | T028 | R309-215 | R309-215 & R309-520-6(4)(d)
C
165C "What is the maximum free chlorine residual measure? This value never exceeds 4.0
mg/L? "
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
165D System collects at least three distribution chlorine residual samples a week?
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
165E System is sampling distribution residuals in accordance with monitoring schedule
MIN | 15pts | TR | TGR9 | R309-105-7, 8 & 18, R309-100 through 605 | Trigger for
regulatory followup to address concerns.
C
166 Treatment plant properly secured to protect the quality of the treated water. R309-520-
7(2)(f)
SIG | 25pts | SM | A050 | R309-400-11 | If the water system does not comply with the
directive, the Director may assess 25 to 200 points to the water system. Points shall
be assessed based upon the severity of the non-compliance, the threat to public
health and the underlying basis for the original directive.
C
167 Daily operating records reflect chemical dosages and total quantities used
SIG | 25pts | MR | TG20 | R309-105-14(3)(a) | Rule requires all water system using
chemical addition or specialized equipment for the treatment of drinking water to
regularly complete operational reports. This significant deficiency must be corrected
within 120 days of notification or have a corrective action plan approved by DDW.
C
168 Is this facility Active or Inactive?A
169 On-site hypochlorite generation system is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 23 of 26
TP002 - BEN LOMOND WELL CHLORINATOR -- On-Site Generation - Active
170 Make-up water used for on-site generation is of drinking water quality
SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires
make-up water used in on-site generation of hypochlorite solution to be of drinking
water quality. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
171 Hydrogen gas generated in electrolytic cell is vented upward outside of building
SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated
in the electrolytic cell of the on-site generation system to be vented upward to the
outside of the building in a dedicated, unobstructed line. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
172 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
173 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
174 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (an eyewash station is not
required)
REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations
and safety showers shall be provided at all hypochlorite installations where
concentrated hypochlorite solutions, containing 5% or greater available chlorine by
volume, are handled in containers greater than 55 gallons
C
175 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
176 Means are used to minimize the use of decayed hypochlorite solution, such as
solution strength testing and delivery records
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
177 Is this facility Active or Inactive?A
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 24 of 26
TP003 - NORTH WEBER WELL CHLORINATOR -- On-Site Generation - Active
178 On-site hypochlorite generation system is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
179 Make-up water used for on-site generation is of drinking water quality
SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires
make-up water used in on-site generation of hypochlorite solution to be of drinking
water quality. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
180 Hydrogen gas generated in electrolytic cell is vented upward outside of building
SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated
in the electrolytic cell of the on-site generation system to be vented upward to the
outside of the building in a dedicated, unobstructed line. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
181 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
182 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
183 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (an eyewash station is not
required)
REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations
and safety showers shall be provided at all hypochlorite installations where
concentrated hypochlorite solutions, containing 5% or greater available chlorine by
volume, are handled in containers greater than 55 gallons
C
184 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
185 Means are used to minimize the use of decayed hypochlorite solution, such as
solution strength testing and delivery records
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 25 of 26
186 Is this facility Active or Inactive?A
187 On-site hypochlorite generation system is certified to meet ANSI/NSF 61
SIG | 25pts | DS | D001 | R309-550-6(1) & R309-550-6(3) | Rule states all materials
that may contact drinking water, including pipes, gaskets, lubricants and O-rings shall
be ANSI-certified as meeting the requirements of NSF Standard 61. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
188 Make-up water used for on-site generation is of drinking water quality
SIG | 25pts | TR | TD70 | R309-520-7(1)(h)(i), R309-520-7(3)(c)(iii) | Rule requires
make-up water used in on-site generation of hypochlorite solution to be of drinking
water quality. This significant deficiency must be corrected within 120 days of
notification or have a corrective action plan approved by DDW.
C
189 Hydrogen gas generated in electrolytic cell is vented upward outside of building
SIG | 50pts | TR | TD71 | R309-520-7(3)(c)(iv) | Rule requires hydrogen gas generated
in the electrolytic cell of the on-site generation system to be vented upward to the
outside of the building in a dedicated, unobstructed line. This significant deficiency
must be corrected within 120 days of notification or have a corrective action plan
approved by DDW.
C
190 Solution tank is covered to minimize corrosive vapors
MIN | 5pts | TR | TD64 | R309-525-11(8)(b)(iii) | Chemical solutions shall be kept
covered.
C
191 Where concentrated hypochlorite solutions (5% or greater) are handled in containers
LARGER than 55 gallons: emergency eyewash station and a safety shower present
SIG | 25pts | TR | TD66 | R309-520-7(3)(a)(i) | Where hypochlorite solutions are used
at remote locations or in quantities of 55 gallons or less on site, safety showers are not
required and alternative emergency eyewash may be provided. This significant
deficiency must be corrected within 120 days of notification or have a corrective action
plan approved by DDW.
C
192 Where concentrated hypochlorite solutions are handled in containers of 55 gallons or
LESS: some method of emergency eyewash provided (an eyewash station is not
required)
REC | 0pts | TR | TD65 | R309-520-7(3)(a)(i) | States Emergency eyewash stations
and safety showers shall be provided at all hypochlorite installations where
concentrated hypochlorite solutions, containing 5% or greater available chlorine by
volume, are handled in containers greater than 55 gallons
C
193 Hypochlorite solution storage area is protected from excessive heat and direct sunlight
MIN | 5pts | TR | TD67 | R309-520-7(3)(a)(ii) | States Storage and injection areas shall
be designed to minimize the decay in strength of concentrated hypochlorite solutions
from excessive heat or direct sunlight.
C
194 Means are used to minimize the use of decayed hypochlorite solution, such as
solution strength testing and delivery records
MIN | 5pts | TR | TD68 | R309-520-7(3)(b) | Rule requires the water system to provide
an operational means, such as keeping records of the delivery date of the hypochlorite
solution, to avoid the injection of significantly decayed hypochlorite solutions.
C
DEQ | Drinking Water
Run Date: 09/04/2024 01:32:01 | Rating: Approved UTAH29109 WEBER BASIN WCD - NORTH page 26 of 26