Loading...
HomeMy WebLinkAboutDERR-2024-010454Bill to: Invoice No. Matt Berry 2316 Berry Oil 1700 S Yellowstone Hwy Idaho Falls, ID 83402 Project: Fast Stop #1113, Scipio, Layton, Utah (Facility No. 2000712, LUST No. OGB) Date Code Description Hours Rate Total P102 (Professional Geologist) - David S. Hansen 1/3/2023 - 2/21/2023 102 Project oversight and management 2.0 147.00$ 294.00$ 103 (Project Manager) - David S. Hansen 11/9/2022 - 12/30/2022 103 Initial PST paperwork, DEQ interaction 2.0 107.00$ 214.00$ 11/9/2022 103 site visit to investigate leaking containment 3.0 107.00$ 321.00$ 1/27/2023 103 drilling, soil sampling 8.0 118.00$ 944.00$ 2/6-22/2023 103 report preparation 6.0 118.00$ 708.00$ 104 (Field Scientist) - David S. Hansen 1/26/2023 104 field prep 2.0 101.00$ 202.00$ 1/30/2023 104 sample delivery 2.0 101.00$ 202.00$ 2/4/2023 104 prepare analytical table 1.0 101.00$ 101.00$ 108 (PST Specialist) - David S. Hansen 2/21-22/2023 108 Invoice and voucher prep 2.0 78.00$ 156.00$ P109 (Administrative Assistant) - Carla M. Hansen 1/3/2023 - 2/21/2023 109 general secretarial 1.0 62.00$ 62.00$ Subtotal 3,204.00$ SUBCONTRACTORS Date Item Quantity Amount Total 1/31/2023 1 4,130.00$ 4,130.00$ Subtotal 4,130.00$ OTHER DIRECT COSTS Date Item Quantity Rate Total 11/9/2022 mileage to/from site. Site check 139 0.625$ 86.88$ 1/27/2023 mileage to/from site. Drilling 139 0.655$ 91.05$ 1/27/2023 photoionization detector 1 95.00$ 95.00$ 1/27/2023 sampling supplies 1 25.00$ 25.00$ 1/27/2023 lab costs (8260/8015, MBTEXN, GRO, DRO) 18 85.00$ 1,530.00$ 1/30/2023 mileage to/from lab 99 0.655$ 64.85$ Subtotal 1,892.77$ 9,226.77$ Initial Subsurface Investigation (OGB-0) Total Invoice Direct Push Services (drilling) ROCKWELL SOLUTIONS, INC. 718 E BRIDGER LANE ELK RIDGE, UT 84651 801-361-2930 Invoice Date: 2/22/2023