Stantec Consulting Services Inc.
2890 East Cottonwood Parkway
Suite 300
Salt Lake City UT 84121-7283
August 29, 2024
Project/File: 203722783
Nicole Chavez
Utah Department of Environmental Quality
Division of Environmental Response and Remediation
195 North 1950 West, First Floor
Salt Lake City, Utah 84116
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Dear Ms. Chavez,
On behalf of 7-Eleven, Inc. (7-Eleven), Stantec Consulting Services Inc. (Stantec) has prepared the following
work plan and budget (WP&B) for post no further action (NFA) work at Speedway Store No. 9444 (the Site),
located at 874 East 1300 South, Salt Lake City, Utah (Figure 1). 7-Eleven acquired Speedway in 2021, and
the Site is also referred to as 7-Eleven Store No. 47165. The Utah Department of Environmental Quality
(UDEQ), Division of Environmental Response and Remediation (DERR) refers to the Site as Facility ID
4000765 and Release Site MWK.
The Site is eligible for reimbursement under the Utah Petroleum Storage Tank Trust Fund. Stantec assumes
that the most recent WP&B for Release Site MWK was WP&B MWK-11 submitted by Antea Group (Antea)
on September 29, 2021. The scope of work proposed herein would therefore be designated as WP&B
MWK-12.
WP&B MWK-12 has been prepared at the request of the DERR based on a letter dated January 8, 2024.
WP&B MWK-12 presents a technical approach and cost estimate to complete monitoring and remediation
well abandonment, remediation system decommissioning, reporting, and reimbursement services. The
purpose of this scope of work is complete the closure of Release Site MWK.
Scope of Work
Task 1 – Work Plan Preparation and HSSE
Task 1 includes the preparation of this work plan, subcontractor procurement, and communication and
coordination with the DERR. Stantec will prepare a Site-specific health and safety plan to address hazards
associated with the proposed scope of work.
Task 2 – Well Abandonment and Remediation System Decommissioning
All monitoring and remediation wells will be abandoned by a Utah Division of Water Rights licensed well driller
in accordance with the Utah Administrative Rules for Water Well Drillers, R655 4 14. At a minimum, the
groundwater monitoring well monument, cement plug, and the upper 12 inches of the PVC casing will be
August 29, 2024
Page 2 of 3
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
removed at each well location. Hydrated granulated bentonite will be used to backfill the remaining casings.
Resurfacing will match the current existing surroundings at each well location; wells are located in concrete,
asphalt, and landscaped areas. Site wells to be abandoned include nine groundwater monitoring wells, eight
soil vapor extraction (SVE) wells, one air sparge well, and one nested vapor sampling well.
All underground remediation piping will be cut below grade, grouted in place, and capped. The Site has
approximately 600 feet of two-inch diameter remediation piping.
The remediation system will be disassembled and all remediation equipment will be transported to the State
Surplus Facility in Draper, Utah. A photolog of the individual components of the skid mounted SVE/electronic
catalytic oxidizer (CATOX) system is included as Attachment 1. The remediation equipment specifications
are included as Attachment 2. The remediation system manifold and aboveground piping will be disposed
of. The remediation system enclosure building will be torn down and disposed of; the building was
constructed around the remediation equipment directly on the concrete slab foundation and cannot be moved.
Rocky Mountain Power will disconnect the 200 amp, 208 volt, three 3 phase electrical meter. The electrical
wire will be pulled back to the utility pole along 900 East. The underground electrical conduit will be cut below
grade, grouted in place, and capped.
Cost bids for site closure activities were requested from Direct Push Services, LLC, ET Technologies, Inc,
and Pacific West, LLC (Pacific West). Pacific West provided the lowest reasonable bid; therefore, Stantec
will award the work to Pacific West. Copies of the subcontractor cost estimates are provided in
Attachment 3. Pacific West will be responsible for obtaining the permit and bond with Salt Lake City for well
abandonment in the ROW, and costs for those items are included in the estimate provided by Pacific West.
The bid provided by ET Technologies was lower than the Pacific West bid; however, it appeared
unreasonable based on comparison to the other bids, and one line item was provided as a zero cost.
Task 3 – Reporting
Stantec will prepare a brief summary report documenting the completion of WP&B MWK-12.
Task 4 – Reimbursement Services
Stantec’s services will include preparation of reimbursement claims on behalf of 7-Eleven. This task includes
assembling invoices paid by 7-Eleven, subcontractor invoices, details of charges, Stantec invoices, proof of
payment documentation, the DERR Standardized Invoice Form, and the DERR Request for Payment
Voucher Summary Worksheet.
Estimated Costs
The estimated costs for the scope of work described in this work plan are presented in Table 1. Non-
reimbursable costs, such as subcontractor markup, have been omitted from the cost breakdown. The costs
presented in Table 1 represent Stantec’s estimate of likely charges to be incurred during the implementation
of the scope of work described above. Actual charges to the tasks and activities included in the scope may
vary from those presented in the estimate as activities and tasks require either more or less effort than
August 29, 2024
Page 3 of 3
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
estimated. Stantec will contact the DERR project manager if there is significant diversion from the estimated
cost breakdown, or if additional authorization above the total estimated cost of this work plan is required.
Should you have any questions or require any additional information, please contact Anna Skinner at
(801) 743-4815.
Sincerely,
STANTEC CONSULTING SERVICES INC.
Anna Skinner
Project Manager
Phone: (801) 743-4815
anna.skinner@stantec.com
Attachment: Table 1 – Estimated Costs for WP&B MWK-12
Figure 1 – Site Plan
Attachment 1 – Equipment Photolog
Attachment 2 – Equipment specifications
Attachment 3 – Subcontractor Bids
August 29, 2024
Figure
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Figure
August 29, 2024
Table
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Table
Work Plan Preparation and Site-Specific HSSE
• Work Plan Preparation
Well Abandonment and Site Restoration 1 NTE @ $1,000 = $1,000
• Equipment Inventory
PM P103 3 hours @ $118 = $354
• Health & Safety Plan 1 NTE @ $400 = $400
Work Plan and HSSE Subtotal $1,754
Well Abandonment and Remediation System Decommissioning
• Field and Prep
Senior PM P101 4 hours @ $152 = $608
PM P103 4 hours @ $118 = $472
Field Prep P104 1 hours @ $101 = $101
Field P104 40 hours @ $101 = $4,040
Field Travel P104 3.75 hours @ $101 = $378.75
• Subcontractor
Pacific West 1 bid @ $28,768.50 = $28,768.50
Well Abandonment and Remediation System Decommissioning Subtotal $34,368.25
Summary Report
Senior PM P101 1 hours @ $152 = $152
Professional P102 1 hours @ $147 = $147
PM P103 3 hours @ $118 = $354
Field P104 19 hours @ $101 = $1,919
Drafter P107 2 hours @ $85 = $170
Admin P109 1 hours @ $62 = $62
Summary Report Subtotal $2,804
Reimbursement
• PST Fund Claim Preparation
Senior PM P101 1 hours @ $152 = $152
PST Specialist P108 6 hours @ $78 = $468
Reimbursement Subtotal $620
Total Budget $39,546
c
Table 1
Post NFA Work
Speedway Store No. 9444
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Estimated Costs for WP&B MWK-12
Page 1 of 1 Stantec Consulting Services Inc.
August 29, 2024
Attachment 1
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Attachment 1
Skid mounted SVE/electronic CATOX system and exhaust stack.
Heater controller.
Control panel door.
Control panel.
Control panel interior.
Cellular telemetry.
Knock out tank, inlet air filters/silencers, SVE blower and motor.
SVE blower.
SVE motor and knock out tank transfer pump.
Knock out tank intermediate bulk container (IBC).
Main electrical panel and fire extinguisher.
Additional blowers and motors stored on-site.
August 29, 2024
Attachment 2
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Attachment 2
NOTES
TRASH
ENCLOSURE
I KNOCKOUT j
'=4 o.
EQUIPMENT
BUILDING
V
Drawn Review
Prepared by Reviewed by Drawn by Dale
JMA 2/18/14
Figure 5
EQUIPMENT DETAILS
SCALE - I 25
Former Tesoro Station #62100
874 East 1300 South
Salt Lake City, Utah
anteagroup«
CONTROL CABINET
Mo,
FLOW ELEMENT
r FLOW INDICATOR
BY-PASS
VALVE Q
FLAME
ARRLSTOR
FORKLIFT POCKETS •
EXHAUST SILENCER -
PURGE/DILUTION
AIR SOUNOID
MANUAL DILUTION
AIR VALVE
CATALYTIC
OXIDIZER
WATER TRANSFER PUMP
SITE TUBE WITH
HIGH—HIGH LEVEL
SWITCH
r EXHAUST
/ STACK
- (2 SECTIONS)
ROCESS INLET
CATALYST
ACCESS
r Q
7.5 HP 230V 1 PH
TEFC MOTOR -
PROCESS BLOWER
PD TYPE
- VAPOR UQUI0
SEPARATOR WITH
20 GALLON CAPACITY APPROXIMATE Wt. 2700 LBS
-X - 0.06
.XX •- 0.03
.XXX - 0.015
L - 0.5*
DATE:
5-
Y USE EXCEPT THAT FOB WWttH
DO NOT SCALE THIS DRAWING
NONE
DRAWN BY:
kw
DREWELOW REMEDIATION
SRCO 250E DE-79
ELECTRIC CATALYTIC OXIDIZER
GENERAL ARRANGEMENT
PROJECT/PRODUCT
040160 100 0 A
. DSC101
s um DISCONNECT
200A, 600VAC
150 Anp
POWER SOURCE- SUPPLED FROM OTHERS
EfSIEM VOLTSlFHI I QAO AMPSlwKf WFl
| 20B/JPh/60Hz[ 118 F^A [j/0 AWC]
CUUSF CONNECT EARTH CROUND
CB105
I
OL105
CBTT2
-i-T-b—
OL112
-oTO 1
-°TGo 1-
M T105
PRDCESS BLOWER
, 10 HP
Ml ) 508VAC/3PH/60
*, 29 AMP
M2
TRANSFER PUMP
. 3/* HP
M2 ) 7.64J*
Ml 16
—II—
U116
HEATER CONTROLLER
HEATER*/!.581-
HEOTER-/1.5SF-
1 Ll
2 L2
3 L3
Tl
12 5
T3 I
e - CT1 15
i l CT1 ie <
TB- ere IT <
II t CTS is
12- CT3 ii <
13ALRMCT320 <
> MALRM COM
I FAN*
> PAN-
116
-oT-o-121-L
I
-°*T
0'-L'D 1ZL3
11=1
^-T-i»k
i
23kU HEATER
208V/3PH/60Hz
HE1
23kV HEATER
208V/3PH/60Hz
SEE PAGE 4 ft 5 FOR
DETAILED WIRING
INFORMATION
CB131
—dTc—
HSJ CB135
T133
CONTROL TRANSFORMER
208/240/480- 120V
SO0VA
22QTBI
220
HEATER I20VAC
240 SCFM
141 1
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
l|9
180
181
HS1
*v
—o_L_D—
PROCESS
SWITCH
HflUTO/2.15
BLOWER. RUN/2.211-
HS2
H-O-A
- -Q 1 i>
OL105
tf—
105
PROC BLWR
T PUMP.ON/2.13 i-
OL112
111
TPUUP
M105 2/1.'
-o— PROCESS BLOWER
PROCESS BLOWER
M112
o
TANK LEVEL ILSH/LSL) TRANSFER PUUP
INLET TEMP
(TICR-l)
TE, rr
EHP W-
TE2
EXIT TEMP c
AK (TOt'lOiHI
u
(0-10" at) ~
HEATER.ON/2.291-
UP.T0.TEMPZ2.12H
301 301 £
TIR1
CIRCULAR CHART RECORDER
H. ;
L:
a §
10 t2«K
M
11 24COW
MJJ»
Pit*
1 rr
tit*
sti,
K m nut
die IN fi 3U
DK: COU 36)
^jjg»HEATER+/1.2B
HEATER-/1,21
CHANI RECOROLk JUMl'LH SE MINOS
» FUSE BLOCK . F2 POSITION (120VAC
2) INPUT CARO •* JUMPER W
JI INPUT CARO '
*i INPUT CARO •
S) INPUT CARO •
61 INPUT CARD •
71 INPUT CARO •
JUMPER W3 • T/C
• JUMPER WI/MA - W!
: JUMPER W3 - T/C
I JUMPER WI/MA • MA
I JUMPER W3 • T/C
B> ALARM CARD: JUMPER W2 • N.O. CONT ACI
9) ALARM CARO: JUMPER W4 • N.O. CONTACT
-€NABLE/2.25
--ENABLE 1/2.26
SV1
o \ <>
CATALYTIC COMBUSTION CORP.
70S 21ST AVE
BLOOMER, HI 54724
(Tl 715-568-288.2
(Fl 715-568-2884
HMJECT Hk JWI6M I B4/82/B4 SUBHIITAL tCE
NMNI m jtjtmp USE ECEPI rim
ft* WKH IT is iwcrjs PMMIITCO
fl/HWl FEU MJOIFIEO
U201
BASE INPUTS. 10 PT, 120VAC '7 3/1.77 2001/1 OL112
TPUUP !TC9 X105
»4 tVC4]
.! M'JTOM LM K! OA.)
« OXIDIZER .Jt"
5 ENABLE 145
LSHH1 ... TBI 112 ILHHA1)
; TBI PSt ,13 TBI
—5 IPALII 3 LOW AIR FLOW *r COM
FLOW OPS1 'I'A" !
5 HIGH TEMP
JP TO TEMP/1,72 'JP TO TEMP
TPUMP ON'1.46 ' li'UMP ON
AU-uM AUTO MOOf.
AUTO RE-STAR
U201.
6 BASE OUTPUTS
ENABLE1/1.74I-
CONTR0L ENABLE
' COM - 2
•I BLOWER RUN/1.45
•I RESET1/2.4S
CR231
-o OXIDIZER READY
1-CBL-HMQ5
2/2.41
TSH1
HIGH LIMIT CONTROLLER
HEATER ON/2.29 i-
EXIT TEMP >
THERMOCOUPLE
TYPE K
• COW
N.C. •
•TC+ sum
• TC- SW2»
H RESET/2.28
H. RESET1/2.27
-o
.L, 1fSF
HIGH_TEMP/2.10h
•«s -se
•
COMM;2.37?7"-CBL-""°t COMM
1260
OPERATOR INTERFACE
•
24VCOM
GND
• • • •
OXIDIZER READY OUTPUTS
DRY CONTACTS
OXIDIZER READY
OXIDIZER READY
;ATALYT|C COMBUSTION CORP.
70S 2IST AVE
BLOOMER. HI 54724
IT) 715-568-2882
IF) 715-568-2884
REVISION" HISTORY
PROJECT up, mmm QUAKING HO, J-84-8168.
wmrm i R
Of CATALUIC COMBUSTION COUP. ANT COPTINC.
TRANSMITTAL FO OTHERS,Cfi USE EXCEPT THAT
FOfl WICH II IS L06NEQS PTflMBHEO
I 84/82/04 SUBMITTAL
BS/10/aq FIELD H001FIEO
o
11
tJ o
__
_
_
_ o
2 .
p
i
|
s^
i
i
S S
o u
,
g
s
sS
I s
11
11
!
ut
>-
to
3K S
i £
UJ 2
<
£
~
£ e
*
"
5 3
,
1 5
g
OK
5 ^
5
If
f
5 I
s
5s
5 •
$
or 5
x
• I
2=
£9
5?
,
5
O >-
-a
:
Q_
j. j
g
B
_
j
| S
I
I
E
O I
ai i
n
LT
L
T
J i
l
l
1
1
IC
f
<
Q_
cr
Ld
I—
<
UJ
oo
CD
X
Cs
l
_x
co
CN
J
_x
to
x
"o
CN
)
<
o
cr
o o
CN
><
o
to
X
CN
208/3PH - 230V/3PH
208VAC/3PH/6OHz
CONTROL TRANSFORMER MUST
BE WIRED FOR 208VAC
MAIN CIRCUIT BREAKER SIZED FOR FULL LOAD AMPS < 1.25
BLOWER CIRCUIT BREAKER • 15A:JHP. 30A: 5HP
MAIN HEATER CIRCUIT BREAKER • 80A
HEATER SUB-CIRCUIT BREAKERS • 40A
MOTOR CONTACTOR RATED FOR MOTOR HORSEPOWER
MOTOR OVERLOAD RATED FOR MOTOR HORSEPOWER
HEATER CONTACTOR RATED FOR 80A RESISTIVE
WIRE HEATER AS SHOWN (23kW):
240VAC/3PH/60HZ
1) CONTROL TRANSFORMER MUST
BE WIRED FOR 230VAC
2) MAIN CIRCUIT BREAKER SIZED FOR FULL LOAD AMPS « 1.25
3) BLOWER CIRCUIT BREAKER • I5A
4) HEATER MAIN CIRCUIT BREAKER • 80A
5) HEATER SUB CIRCUIT BREAKERS • 40A
6) MOTOR CONTACTOR RATED FOR MOTOR HORSEPOWER
71 MOTOR OVERLOAD RATED FOR MOTOR HORSEPOWER
81 HEATER CONTACTOR RATED FOR 80A RESISTIVE
9) WIRE HEATER AS SHOWN <25kW):
HEATER
CONTROLLER
WATLOW
4-20mA- 7
HEATER HEAD WIRING
18 ELEMENTS »-20mA- 8
2 CIRCUITS
HEATER
SUB
BREAKER
-o-T-o
208V: 34A
230V: 30A
HEATER
SUB
BREAKER
Z08V: 34A
230V: 30A
• FROM TEMP CONTROLLER-
• FROM TEMP CONTROLLER-
:I:IM
rn
Ll L2 LJ +
460 VOLT MOTOR
;i i i
' r L2 LJ *
3 PHASE DELTA
2_kW
:flTALYT[C COMBUSTION CORP.
709 21ST AVE
BLOOMER. Wl 54724
(T) 715-568-2882
(Fl 715-568-2884
PROJECT NO: JB48I60O
DHWINC NOt J-84-81680-388
Vmm HPIEW I! THE WEflTi
Of C*W.YI|C CONBUSTICW CORP. en, COPYING,
nwew"«. ro OTHERS, OR USE ECEPT <>»<
FOB WHICH (T IS LOANEQS PKMBHEO
REVISION HISTORY
I 04/82/04 SUBMITTAL MEE
OT/ie/81) FIELD M001F1ED
tH2K
Technologies, Inc.
7550 Commerce Street
Corcoran, MN 55340
Office: 763-746-9900
Fax: 763-746-9903
December 13, 2013
To: Steve Warner
Antea
Email: Steve. Wamer(ai,anteagroup.corri
Project Name: Utah Site - SVE, cntrls, building Oxidizer
Project Location: Utah
Quote Number: 4147
Dear Steve,
Below is a quote you requested for the above referenced project. Quote is per the specifications with exceptions as
noted. We appreciate thc opportunity to bid on this project, please call or email with any questions.
Description/Pricing
SVE
(1) SVE manifold, 4" manifold with (8) 2" takeoffs
Schedule 80 PVC header and fittings
(8) 2" PVC ball valves
(8) 1" Rotameters, Dwyer model UV-D112, 14-100 scfin
(8) Sample ports
(8) Vacuum gages, 0-100" wc vacuum
(1) Moisture separator, H2K VLS-100
Tangential inlet and demister for 99%+ moisture removal
Welded steel construction with enamel external finish
Polypropylene demister element
17" Hg vacuum design rating
4'* NPT inlet and outlet connections
100 gallon total capacity, 50 gallon holding capacity
2" PVC site glass with ss high/high level switches and union for easy removal
1" Drain valve
Integral vacuum relief valve
Sample port on separator inlet
Vacuum gage on separator inlet and discharge
2" Air bleed valve with silencer
(Lot) Mounting and wiring of Falmouth vapor control valve on blower inlet
(1)3" inline filter, Solberg model CSL-235P-400C with 10 micron replaceable element
(1) Rotron model EN858 regenerative blower system
250 scfin at a vacuum of 50" wc at separator inlet, 30" wc discharge for catox
10 HP, 208-230/460 VAC, 30, EXP motor
Sample port on blower discharge
Vacuum gage on blower inlet
Temperature gage on blower discharge
Vacuum switch on blower inlet, Dwyer model 1950
Flow meter on blower discharge, Dwyer DS-300 pitot tube with magnehelic gage
//^/fTechnologies. Inc.
Sample port on blower discharge Controls (l)Control SystemFor operation on 208 VAC, 30, 3 wire incoming electrical service. To control (1) IOHP SVE blower, with interlocks and breaker to oxidizer. Furnished mounted and wired on the enclosure exterior wall. To include: QTY DESCR IPTION I Enclosure, NEMA 4, 36"h, 36"w, 12"d with inner door for switches and indicators l Panel board 208V AC 3phase in NEMA 3R enclosure mounted next to control panel, includes:l Circuit breaker 208V 1 P 1 OA lOK; control power.2 Circuit breaker 208V 1 Pl 5A I OK; vent fan, lightinglCircuit breaker 208V 2P 20A l OK; heater1 Circuit breaker 208V 1P20A lOK; receptacle(s)1 Circuit breaker 208V 3P40A !OK; SVElCircuit breaker 208V 3P60A !OK; catox1 Switch; three position; Hand-Off-Auto with integral Run (green/LED) indication 3 Light (red/LED); alarms Pushbutton (red/NO); alarm Reset 5 Intrinsically safe barriers, discrete , 2 channel 2 E-stop buttons1 Interlocks to oxidizer I Motor run time meters Sensaphone FDGSOO autodialer Relay logic and timers as required Engraved laminated legends for all door mounted devices Terminal blocks for external connections and fusing as required Color-coded wiring with wire markers at all terminations Fully documented, assembled, wired, programmed and pre-shipment test UL 698A serialized label GFIC 20A outlet with and weatherproof cover; mounted adjac.ent to control panel H2KTechnologies, Inc.
CAT
CO
J I c
ION
January 13, 2014 - QT03646
Fully Integrated PD SVE Package
- Sutorbilt 4LR PD Blower
7.5 HP EXP blower motor with adjustable motor base
VFD Drive for blower speed control
250 SCFM at 50" wc Vacuum, 10" wc discharge pressure
Removable belt guard
Blower and motor vibration boots
Inlet and exhaust filter/silencers
Exhaust temperature indicator
Exhaust pressure indicator
Inlet vacuum indicator
Recirculation loop for flow control
Vapor Liquid Separator (VLS-20)
TCIG powder coated carbon steel VLS tank
20 gallon liquid holding capacity
Stainless steel high efficiency mist eliminator
Manual drain with ball valve
Sight glass with high-high level limit switch (wired to IS barrier) and cleanout port
EXP low and high liquid level switches (wired to IS barriers)
- EXP centrifugal transfer pump with 1.5 HP EXP motor
Inlet manual dilution valve
Inlet automatic dilution valve
Inlet vacuum indicator
Vacuum relief valve
Page 4
Providing Quality Air Pollution Control Systems Since 1950
Drewelow Remediation Equipment, Inc.
A CERTIFIED SMALL BUSINESS ENTERPRISE
WWW.DRE-EQUIP.COM
DE-79 Data Sheet
Equipment description - Catalytic Combustion SRCO 250E is a 250 scfin all electric catalytic oxidizer,
gas/liquid separator with auto drain, Sutorbilt 4L positive displacement blower, 7.5hp electric motor, v-belt
drive, exhaust silencer, SCH 40 carbon steel piping, 300 scfin electric catalytic oxidizing chamber with two
stage catalyst designed for 99% DRE, exhaust stack, skid mounted. NEMA 4 control panel. Honeywell 3 pen
chart recorder.
Model number SRCO 250E Serial number DE-79
Maximum air flow
capacity
250 scfm Maximum blower
vacuum
10 in hg.
Influent process
connections size
3 inch NPT Exhaust stack
dimensions
6 inch diameter 12 feet
tall
Electrical requirements 230 volt single phase or
230 volt three phase
Sub panel amp rating 200 amps, install 200
amp breaker
Equipment skid dimensions
Length 8 feet Width 6 feet
1523 Sterling Court Escondido, CA 92029 Phone 760-546-6456 Fax: 760-546-6476
August 29, 2024
Attachment 3
Reference: Work Plan and Budget MWK-12: Post NFA Work
Speedway Store No. 9444 (7-Eleven Store No. 47165)
874 East 1300 South, Salt Lake City, Utah
Facility ID 4000765, Release Site MWK
Attachment 3
___________________________________________
Date:
Phone #:
1
1a
1b
1c
1d
2
3
4
4a
5
6
PROPOSED PROJECT DURATION: _________________________________________________________________
BID FORM
Remediation System Decommissioning and Well Abandonment
City/State/Zip Code:
Address:
Offeror’s Company:
$
Grout and cap SVE and AS laterals below grade.
600 ft, 2 inch dia $
Teardown and transport remediation system equipment to:
State Surplus facility
447 W 13800 S
Draper, UT 84020
SVE blower
Knock out tank
Electrical CATOX
Control panel
10 ft by 12 ft remediation enclosure building, remove and dispose of traffic bollards
Dispose of surface SVE manifold
$
1 air sparge (AS) well located on-site in concrete
2 inch dia, 48 ft deep
Cut concrete back to main trench and resurface with asphalt patch.
$
CostLine Item
$
$
8 recovery/soil vapor extraction (SVE, labeled RW) wells located on-site in concrete
4 inch dia, 45 ft deep
Cut concrete back to main trench (or as necessary in the case of RW7 and RW8) and resurface
with asphalt patch.
Monitoring well abandonment, vault removal, and like for like resurfacing.
DWR coordination/documentation by a licensed well driller will be required.
9 groundwater monitoring wells
2 inch dia, 45 ft deep
MW1 and MW2 are located on-site in landscaping, retain grass plugs for resurfacing.
MW3 and MW8 are located on-site in asphalt.
MW7 is located on-site in concrete.
MW5, MW6, and MW9 are located off-site in landscaped public ROW, contractor to secure
ROW construction permitting and bonding and will be responsible for traffic control, retain grass
plugs for resurfacing.
MW4 is located off-site on private property in concrete, Stantec will secure site access.
TOTAL BASE BID:
1 nested vapor sampling well (SV)
Boring log attached.
Date:
Signature:
Phone Number:
Address:
Name:
All concrete/asphalt will be saw cut to clean edges before resurfacing, include in associated line
items as necessary.
Date:
Signature:
Phone Number:
Address:
Name:
Bid Submitted By
$
Disconnect 200 amp, 208 volt, 3 phase power drop.
Stantec to coordinate with Rocky Mountain Power with involvement from contractor.
Pull back wire from power drop to remediation enclosure.
$
Grout and cap electrical conduit below grade.
145 ft, 3 inch dia $
Disposal of associated demolition debris, include in associated line items as necessary.
Bid Accepted By
All environmental construction work change orders MUST be approved in writing by the 7-Eleven Environmental Manager prior
to commencement of the additional work.
1 week
Logan Leavitt
(702) 354-7310
1094 S Gilbert Rd, Ste 203, Gilbert, AZ 85296
Pacific West, LLC
Pacific West, LLC
Salt Lake City, UT 84119
1555 West 2200 South, Ste A (877) 821-5456
7,294.00
7,506.00
1,768.00
429.00
5,172.00
3,703.00
1,635.00
1,261.50
28,768.50
April 5, 2024
4/5/2024
___________________________________________
Date:
Phone #:
1
1a
1b
1c
1d
2
3
4
4a
5
6
PROPOSED PROJECT DURATION:_________________________________________________________________
BID FORM
Remediation System Decommissioning and Well Abandonment
City/State/Zip Code:
Address:
Offeror’s Company:
$
Grout and cap SVE and AS laterals below grade.
600 ft, 2 inch dia $
Teardown and transport remediation system equipment to:
State Surplus facility
447 W 13800 S
Draper, UT 84020
SVE blower
Knock out tank
Electrical CATOX
Control panel
10 ft by 12 ft remediation enclosure building, remove and dispose of traffic bollards
Dispose of surface SVE manifold
$
1 air sparge (AS) well located on-site in concrete
2 inch dia, 48 ft deep
Cut concrete back to main trench and resurface with asphalt patch.
$
CostLine Item
$
$
8 recovery/soil vapor extraction (SVE, labeled RW) wells located on-site in concrete
4 inch dia, 45 ft deep
Cut concrete back to main trench (or as necessary in the case of RW7 and RW8) and resurface
with asphalt patch.
Monitoring well abandonment, vault removal, and like for like resurfacing.
DWR coordination/documentation by a licensed well driller will be required.
9 groundwater monitoring wells
2 inch dia, 45 ft deep
MW1 and MW2 are located on-site in landscaping, retain grass plugs for resurfacing.
MW3 and MW8 are located on-site in asphalt.
MW7 is located on-site in concrete.
MW5, MW6, and MW9 are located off-site in landscaped public ROW, contractor to secure
ROW construction permitting and bonding and will be responsible for traffic control, retain grass
plugs for resurfacing.
MW4 is located off-site on private property in concrete, Stantec will secure site access.
TOTAL BASE BID:
1 nested vapor sampling well (SV)
Boring log attached.
Date:
Signature:
Phone Number:
Address:
Name:
All concrete/asphalt will be saw cut to clean edges before resurfacing, include in associated line
items as necessary.
Date:
Signature:
Phone Number:
Address:
Name:
Bid Submitted By
$
Disconnect 200 amp, 208 volt, 3 phase power drop.
Stantec to coordinate with Rocky Mountain Power with involvement from contractor.
Pull back wire from power drop to remediation enclosure.
$
Grout and cap electrical conduit below grade.
145 ft, 3 inch dia $
Disposal of associated demolition debris, include in associated line items as necessary.
Bid Accepted By
All environmental construction work change orders MUST be approved in writing by the 7-Eleven Environmental Manager prior
to commencement of the additional work.
E.T. Technologies, Inc
04/04/2024
3110 W. California Ave, Suite D
Salt Lake City, UT 84104
801-977-0731
6,030.00
7,030.00
200.00
100.00
1,500.00
4,500.00
0.00
*Cost included in
Item 3
1,000.00
20,360.00
Total field time is estimated at 1 week
Aaron Norton
3110 W. California Ave, Ste D, SLC
801-977-0731
04/04/2024
20-1339913 | www.directpushservices.com
Direct Push Services LLC
PO Box 25784
Salt Lake City, UT 84125
(801)230-1721
sean@directpushservices.com
Estimate
ADDRESS
Stantec Consulting
2890 East Cottonwood
Parkway, Suite 300
Salt Lake City, UT 84121
ESTIMATE #240125
DATE 03/29/2024
EXPIRATION DATE 07/31/2024
P.O. NUMBER SALES REP
Speedway 9444 Aband/Decomission Sean Bromley
DATE ACTIVITY QTY RATE AMOUNT
2" monitoring well abandonment at 45' bgs. MW1/MW2
onsite in landscaping, MW3/MW7/MW8 are onsite in
Concrete/Asphalt. MW5/MW6/MW9 are all off site in public
Right of Way., MW4 is located off site in private property.
AS(Air Sparge 2" PVC@48')
10 1,350.00 13,500.00
ROW Permit for MW5/6/9, Traffic Control Plan, Traffic
Control, signs, barricades, set up and take down,
Bond/Insurance.
1 2,500.00 2,500.00
4" Recovery Well Abandonment at 45'. RW1-RW8 45'
BGS.
8 2,500.00 20,000.00
Vault Removal and surface restoration. Includes Saw
cutting, landscape, asphalt, and concrete restoration. 19
well vaults, trenches, and additional 5 asphalt surface
restorations from previous drill locations/Refusal.
RW1,2,3,4,5,8(Concrete), RW6,7 and AS1 are in asphalt.
1 6,500.00 6,500.00
Nested Soil Gas abandonment location.1 250.00 250.00
Grout and cap 600' of Lateral piping for SVE and AS
locations, grout and cap 145' of 3" Electrical conduit.
1 15,000.00 15,000.00
Mob/Demob Well abandonment/grouting/Vault removal
and surface restoration.
4 250.00 1,000.00
Teardown and transport remediation system equipment to:
State Surplus facility
447 W 13800 S
Draper, UT 84020
SVE blower
Knock out tank
Electrical CATOX
Control panel
10 ft by 12 ft remediation enclosure building, remove and
dispose of traffic bollards
Dispose of surface SVE manifold
1 6,800.00 6,800.00
20-1339913 | www.directpushservices.com
Bid Specs sent 3/1/2024, and updated specs sent 3/26/2024 from
Anna Skinner.
TOTAL $65,550.00
Accepted By Accepted Date