Loading...
HomeMy WebLinkAboutDSHW-2024-008057Site Information Finalized Yes Facility Name ATK Launch Systems Promontory Landfill Facility_ID SW0093 Facility Name ATK Launch Systems Promontory Landfill Street Address 9160 North Hwy 83 City Corinne ZIP Code 84307 County Box Elder County Inspection Date 08-15-2024 Type of Visit Routine Oversite Is the Visit Announced?Yes 0.000000, 0.000000 Weather Conditions 70 and sunny Inspection Goal To determine compliance with Solid Waste Permitting and Management Rules. Facility Contact Paul Hendrickson, Environmental Engineer Northrop Grumman Corporation Participants Alex Milne, DWMRC Paul Hendrickson, Environmental Engineer Gary Larson, Environmental Operations Manager Kyle Wright, Landfill Engineer Randy Fulmer , Operations Team Supervisor Steven Peterson, Environmental Engineer Follow Up Inspection Needed?N/A Recommended Follow Up Date Depart Office Date 08-15-2024 Depart Office time 05:45 AM (-6 GMT) Return to Office Date 08-15-2024 Return to Office time 02:30 PM (-6 GMT) 1. Pre-Inspection Review 1.1 Permit Review Yes Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 1 of 8 Comment The most recent permit was reviewed and the facility consists of three separate landfills. M-336 can accept non-hazardous industrial solid waste including regulated asbestos containing material, office waste, employee cafeteria waste, and dead animals. M-136 can accept non-hazardous propellant burn ash and related non-hazardous debris generated onsite. Rocky Point can accept large hardware such as rocket motor nozzles, cases, and other miscellaneous large items. A permit through DWQ allows the facility to dispose of biosolids within the landfill. The facility holds a permit with DWQ to dispose of sludge generated from the on-site waste water treatment facility in the landfill. 1.2 Annual Report Review Yes Comment The 2023 Annual Report was reviewed and 97% of the waste is from Box Elder County and 3% of the waste is from Salt Lake County. Total Materials Received is noted to be 3,909.30 tons. The Landfill Remaining Capacity is noted to be 56,000 tons/19 years. $671.22 in disposal fees were paid. 1.3 Previous Inspection Review Yes Comment The 08/29/2023 Inspection Report and Inspection Letter were reviewed. No issues were noted. 1.4 Facility Contacts Confirmed Yes Comment Paul Hendrickson is the primary contact. 1.5 Facility Contacted (If an announced inspection) Yes Comment Paul Hendrickson was notified of the inspection via email on 08/08/2024. 1.6 Local Health Contacted Yes Comment Grant Koford of the Bear River Health Department was notified of the inspection via email on 08/08/2024. This inspection did not have health department participation. 1.7 Other N/A Comment N/A 2. Facility / Operational Controls (1-Good, 5-Poor) 2.1 Litter 1 2.2 Roads 1 2.3 Gate House Operations 1 2.4 Vectors 1 2.5 Communications 1 2.6 Recycling Area NA 2.7 Fugitive Dust Control 1 2.8 Waste Inspection Area 1 2.9 Scavenging Control 1 2.10 Open Burning NA Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 2 of 8 2.11 Fences, Gates, Locks, Access Control 1 2.12 Working Face 1 2.13 Daily - Soil 1 2.14 Daily - Alternative NA 2.15 Leachate Collection System NA 2.16 Other NA Comment (Required)The facility maintains a cover log showing M-336 receives cover when waste is received, M-136 receives cover at least once every quarter. Rocky Point receives cover as needed. No wind-blown litter was observed and excellent security controls were in place. Sludge is disposed of at the M-336 Landfill as noted in the DWQ permit. 3. Signs Required / Properly Posted 3.1 Operating Days / Hours Yes 3.2 Directions & Procedures Yes 3.3 Emergency Numbers Yes 3.4 List of Unacceptable Materials Yes 3.5 Other N/A Comment (Required)The facility maintains adequate signage. 4. Operator / Representative / Employees 4.1 On-site While Open Yes 4.2 Training Yes 4.3 Other N/A Comment (Required)The facility maintains strict security controls. Each of the three landfills are properly secured and accessed by authorized personnel only. 5. Monitoring 5.1 Methane N/A 5.2 Random Inspections N/A 5.3 Leachate N/A 5.4 Ground Water N/A 5.5 Other N/A Comment (Required)Monitoring is not required for the Solid Waste permit. 6. Drainage / Erosion 6.1 Water Run-on Yes 6.2 Water Run-off Yes Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 3 of 8 6.3 Other N/A Comment (Required)The facility maintains adequate drainage and erosion controls. 7. Proper Storage / Isolation / Disposal 7.1 Special Waste Yes 7.2 Batteries N/A 7.3 Hazardous Waste N/A 7.4 Infectious Waste N/A 7.6 Dead Animals Yes 7.7 Asbestos Yes 7.8 Bulky Waste Yes 7.9 Contaminated Soil N/A 7.10 Ash N/A 7.11 Sludge Yes 7.12 Other N/A Comment (Required)Only permitted waste is disposed of within the landfills and covered accordingly. M-336 receives sludge (biosolids) from the on-site waste water treatment plant. This activity is permitted as noted in the DWQ permit. Bulky waste is covered and the cover is noted in feet. 8. Cover 8.1 Intermediate Yes 8.2 Final N/A 8.3 Vegetation N/A 8.4 Other N/A Comment (Required)Adequate cover is applied. M-136 is near capacity and the facility will notify the Division when the cell location has changed. 9. Inspection Records 9.1 Random Inspection Report Yes 9.2 Gas Monitoring System N/A 9.3 Surface Drainage Control N/A 9.4 Daily Records Yes 9.5 Weight or Volumes Yes 9.6 Intermediate Cover N/A 9.7 Final Cover N/A 9.8 Self Inspection (Quarterly Reports) Yes Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 4 of 8 9.9 Deviation From Plans N/A 9.10 Permit, Permit Application, and Rules Available Yes 9.11 Other N/A Comment (Required)All applicable records were available for review, including random load inspections, quarterly inspections, and cover logs. 10. Monitoring / Sampling / Analysis Records 10.1 Explosive Gas Monitoring N/A 10.2 Leachate Sampling & Treatment N/A 10.3 Ground Water Sampling Results N/A 10.4 Other N/A Comment (Required)The facility does not have a monitoring requirement. 11. Special Waste Records 11.1 Lab Analysis Results N/A 11.2 Manifests N/A 11.3 Treatment Certification N/A 11.4 Paint Filter Test Results N/A 11.5 Onsite Treatment Documentation N/A 11.6 Other N/A Comment (Required)Special waste records were not reviewed. 12. Waste Tires 12.1 Acceptance procedures for Waste Tires N/A 12.2 Waste Tire Pile Segregated N/A 12.3 Estimated Quanitity of Waste Tires No Number of Tires 12.4 Waste Tire Fund Training N/A Comment (Required)Waste tires are not accepted. 13 Other Items 13.1 Notice of Inspections Form Completed and Signed N/A 13.2 N/A 13.3 N/A Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 5 of 8 13.4 N/A Comment (Required)N/A 14. Special Permit Requirements 14.1 N/A 14.2 N/A 14.3 N/A Comment (Required)N/A General Comments Comments The facility consists of three separate areas for solid waste disposal. The facility maintains adequate record keeping, training, and security control measures. Only permitted waste is disposed of within the landfills and covered accordingly. M-336 receives sludge (biosolids) from the on-site waste water treatment plant. This activity is permitted as noted in the DWQ permit. DWMRC Inspector Signature DWMRC Inspector Name Alex Milne Date/Time 08-20-2024 Photos Attach Photos View of the Rocky Point Landfill entrance. Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 6 of 8 View of the Rocky Point Landfill cell. Waste is covered as needed. View of the entrance to the M-136 Landfill. The M-136 landfill receives cover at least quarterly. View of the entrance to the M-336 Landfill. Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 7 of 8 View of the M-336 Landfill cell. The waste receives cover daily. View of the asbestos pit within the M-336 Landfill. View of the asbestos signage within the M-336 Landfill. Date Submitted: 08-20-2024 02:01 PM Submitted By: amilne@utah.gov Solid Waste Program Facility Inspection Report Checklist Page 8 of 8