HomeMy WebLinkAboutDSHW-2024-008056Site Information
Finalized No
Facility Name Summit County Three Mile Canyon MSW Landfill
Facility_ID SW0205
Facility Name Summit County Three Mile Canyon MSW Landfill
Street Address Three Mile Canyon Road
City Wanship
ZIP Code 84017
County Summit County
Inspection Date 08-14-2024
Type of Visit Routine Oversite
Is the Visit Announced?Yes
40.553592, -111.873445
Weather Conditions Sunny and 70 degrees
Inspection Goal Landfill
Facility Contact Tim Loveday
Participants Tim Loveday, Issa Hamud, and Matt Sullivan
Follow Up Inspection Needed?N/A
Recommended Follow Up Date
Depart Office Date 08-14-2024
Depart Office time 09:30 AM (-6 GMT)
Return to Office Date 08-14-2024
Return to Office time 03:30 PM (-6 GMT)
1. Pre-Inspection Review
1.1 Permit Review Yes
Comment
1.2 Annual Report Review Yes
Comment
1.3 Previous Inspection Review Yes
Comment
1.4 Facility Contacts Confirmed Yes
Comment
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 1 of 7
1.5 Facility Contacted (If an
announced inspection)
Yes
Comment
1.6 Local Health Contacted Yes
Comment
1.7 Other
Comment
2. Facility / Operational Controls (1-Good, 5-Poor)
2.1 Litter 2
2.2 Roads 1
2.3 Gate House Operations 1
2.4 Vectors 1
2.5 Communications 1
2.6 Recycling Area 1
2.7 Fugitive Dust Control 1
2.8 Waste Inspection Area 1
2.9 Scavenging Control 1
2.10 Open Burning NA
2.11 Fences, Gates, Locks,
Access Control
1
2.12 Working Face 1
2.13 Daily - Soil 1
2.14 Daily - Alternative NA
2.15 Leachate Collection System 1
2.16 Other
Comment (Required)No vectors (fowl) observed
The Recycling and Public Drop off area is regularly used
3. Signs Required / Properly Posted
3.1 Operating Days / Hours Yes
3.2 Directions & Procedures Yes
3.3 Emergency Numbers Yes
3.4 List of Unacceptable Materials Yes
3.5 Other
Comment (Required)Open daily except Sundays
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 2 of 7
4. Operator / Representative / Employees
4.1 On-site While Open Yes
4.2 Training Yes
4.3 Other
Comment (Required)Training records were organized
5. Monitoring
5.1 Methane Yes
5.2 Random Inspections Yes
5.3 Leachate Yes
5.4 Ground Water Yes
5.5 Other
Comment (Required)Methane is checked quarterly
Leachate in lined pond was low to dry. It is regularly maintained.
6. Drainage / Erosion
6.1 Water Run-on Yes
6.2 Water Run-off Yes
6.3 Other
Comment (Required)Run off and run on controls appeared functional
7. Proper Storage / Isolation / Disposal
7.1 Special Waste Yes
7.2 Batteries Yes
7.3 Hazardous Waste Yes
7.4 Infectious Waste Yes
7.6 Dead Animals Yes
7.7 Asbestos Yes
7.8 Bulky Waste Yes
7.9 Contaminated Soil Yes
7.10 Ash Yes
7.11 Sludge Yes
7.12 Other
Comment (Required)Sludge in the form of biosolids has been disposed at the landfill. The landfill
requires a Paint Filter Test from generators prior to approving disposal.
8. Cover
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 3 of 7
8.1 Intermediate Yes
8.2 Final Yes
8.3 Vegetation Yes
8.4 Other
Comment (Required)South slope has good vegetation cover
9. Inspection Records
9.1 Random Inspection Report Yes
9.2 Gas Monitoring System Yes
9.3 Surface Drainage Control Yes
9.4 Daily Records Yes
9.5 Weight or Volumes Yes
9.6 Intermediate Cover Yes
9.7 Final Cover Yes
9.8 Self Inspection (Quarterly
Reports)
Yes
9.9 Deviation From Plans Yes
9.10 Permit, Permit Application,
and Rules Available
Yes
9.11 Other
Comment (Required)Random inspections are done at least once per day
10. Monitoring / Sampling / Analysis Records
10.1 Explosive Gas Monitoring Yes
10.2 Leachate Sampling &
Treatment
Yes
10.3 Ground Water Sampling
Results
Yes
10.4 Other
Comment (Required)Groundwater is sampled quarterly
11. Special Waste Records
11.1 Lab Analysis Results Yes
11.2 Manifests Yes
11.3 Treatment Certification
11.4 Paint Filter Test Results Yes
11.5 Onsite Treatment
Documentation
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 4 of 7
11.6 Other
Comment (Required)Groundwater and Paint Filter Test records are kept at the scale house
12. Waste Tires
12.1 Acceptance procedures for
Waste Tires
Yes
12.2 Waste Tire Pile Segregated Yes
12.3 Estimated Quanitity of Waste
Tires
Yes
Number of Tires 50
12.4 Waste Tire Fund Training Yes
Comment (Required)Waste tires are dropped off at the household recycling area
13 Other Items
13.1 Notice of Inspections Form
Completed and Signed
Yes
13.2
13.3
13.4
Comment (Required)Records were organized
14. Special Permit Requirements
14.1
14.2
14.3
Comment (Required)Meets Class I permit requirements
General Comments
Comments Some litter was noticed, but less than in the past. Litter is cleaned up by
the staff regularly.
DWMRC Inspector Signature
DWMRC Inspector Name Matt Sullivan
Date/Time 08-20-2024
Photos
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 5 of 7
Attach Photos
Sign along road to the landfill
South and east landfill slopes that are well vegetated
Current area of disposal and working face
Metals staging area awaiting to be picked up for recycling
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 6 of 7
Public Drop off and recycling area
Date Submitted: 08-20-2024 11:44 AM
Submitted By: msullivan@utah.gov
Solid Waste Program Facility Inspection Report Checklist
Page 7 of 7