Loading...
HomeMy WebLinkAboutDSHW-2024-008001CORRECTIVE ACTION SECTION – SITE VISIT REPORT SITE NAME: East Bacchus Area DATE: __08__/__26__/_2024_______ EPA ID #: N/A ________________________ UTCA ID#:_UTD001705029__ _ LOCATION: East Bacchus Area, West Valley, Utah __________________________________ PROJECT MANAGER: _Ethan Upton ______________________________________________________ SITE STATUS ___ Active Investigation ___Ongoing Cleanup Activities ___Confirmation Sampling _X_ Long-term Institutional Controls in-place [Site Management Plan (SMP), Environmental Covenant (EC), and/or Post Closure Plan (PCP)] __ Long-term Groundwater Monitoring OTHER (describe): PURPOSE OF SITE VISIT _X_Drive-by (windshield survey) ___Sample Observation &/or Collection ___Site Investigation ___Cleanup Activities Inspection _X_Confirm Current Land Usage ___ Confirm Cleanup Completed ___ Confirm Integrity of Engineering Controls _X_ Confirm Compliance with SMP/EC D2# for SMP/EC: DSHW-2012-011848 ___ Post-Closure Permit Verification ___ Document Change in Land Usage OTHER (describe) FIELD OBSERVATIONS: The Site has recently been sold to Rio Tinto as part of the Kennecott Mine subsidiary. Kennecott plans to sell the Site for commercial/industrial development. During the Site visit, the Division observed a portion of the northeast has been sold and developed into a storage facility (Image 1 and 2). The SMP limits exposure to the groundwater but allows for development of the Site for commercial/industrial land use. The Division was informed by ATK personnel (who escorted the Division, and recently finalized the sale at the end of 2023) that the agreement allows for slab on grade development of the Site but restricts excavation and contact with the contaminated groundwater on-Site. The Division asked for a Kennecott contact, but ATK did have one. The Site monitoring wells appeared to be intact and the Site is currently undeveloped with the exception to a railroad through the center of the Site (Image 3), an abandoned water tower owned by West Valley (Image 4), and the newly constructed storage facility. SAMPLE COLLECTION Were Environmental Samples Collected per the approved Sampling & Analysis Plan? YES ___ NO ___ N/A _X_ COMMENTS: Is the Work Being Performed in a Manner Consistent with the Approved Workplan(s)? YES ___ NO ___ N/A _ X_ Unknown (Drive-By Inspection Only) ___ COMMENTS: CURRENT LAND USAGE ___ Residential _X_ Commercial _X_ Industrial ___ Mixed Commercial w/ Residential ___ Under Construction &/or Development ___ Other: __________________________________ COMMENTS: FUTURE LAND USAGE ___ Residential ___ Mixed Commercial w/ Residential _X_ Commercial ___ Other: (describe below) _X_ Industrial ___ Unknown at this time COMMENTS: POST-CLEANUP SITE VISITS Is the Completed Cleanup Remedy Still Protective Based on Current Land Use? YES ___ NO ___ Unknown (Drive-By Inspection Only) _X_ COMMENTS: LONG-TERM INSTITUTION CONTROL(S) VERIFICATION Are Components or Restrictions of the SMP, EC &/or PCP Currently Being Complied with? YES _X_ NO ___ Unknown (Drive-By Inspection Only) ___ COMMENTS: SITE VISIT CONCLUSIONS All SWMUs appears to be in compliance with the Site Management Plan. RECOMMENDATIONS N/A ATTACHMENTS (PHOTOS, MAPS, FIGURES, TABLES, etc.) YES _X_ NO __ SIGNATURE: